X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20806

Well Details

Well ID: 34-081-20806
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Warren Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001614
Farm/Lease Name: CREAMER WRN JF
License Status: Producing
License Date: 2019-02-22
Spud Date: 2019-02-23
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2019-03-31
Well Total Depth: 19308.00 ft
Configuration: Horizontal
Latitude: 40.210000
Longitude: -80.730000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-02-22 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/22/2019, Expired Date:2/21/2021 12:00:00 PM, Drilling unit acres:628.695, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2019-03-31
Record Last Modified 2019-05-16
Correction to Well 2019-05-17 UPDATE TARGET/TAKE PER AS-DRILLED PLAT (PROPOSED PERF)
Construction Permit Expires 2021-02-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10415 19165 0
10415 19165 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-112781070 2019-10-17 0:00 PW No Violations 1.00
-152355218 2019-6-6 0:00:0 CT No Violations 1.00
-1611336669 2019-2-24 0:00: CS No Violations 1.50
-258418910 2019-8-14 0:00: PL No Violations 1.00
-963135863 2019-7-16 0:00: CT No Violations 0.50
0152355218 2019-06-06 Completion Testing No Violations On the day of my inspection I witnessed a Halliburton frac crew on location tied into the Creamer 2H and 4H wells. Halliburton is pumping stage 45/50. Stage 50 plug set at 11611 feet, with bottom perforation at 11599 feet and top perforation at 11459 feet. Halliburton pumped 23.8 barrels of 7.5% HCl, 3995.6 barrels of clean fluid, 879 barrels produced water, 60110 lbs of 100 mesh sand, and 169185 lbs of 30/70 mesh sand. Total sand pumped was 229295 lbs. Maximum treating pressure was 11481 psi and average treating pressure was 10743 psi. Maximum rate was 85.8 barrels per minute (BPM) and average rate was 82.1 bpm. Break down pressure was 8936 psi. Initial shut in pressure (ISIP) was 7077 psi. Frac gradient of 1.14 psi/ft. The 13.375x9.625 annular pressure is zero and the 9.625x5.5 annular pressure is 440 psi.
1552554544 2019-03-14 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Pioneer 77 drilled an 18.625 inch diameter open hole to a depth of 333 feet. Previous casing set and cemented was 24 inch diameter conductor casing to a depth of 100 feet ground level. Wyoming Casing ran 335 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with 2 foot stick up. Shoe track is 24 feet long. Cement Baskets were set at 266 feet. Void encountered from 278-282 feet. CJ/otex was onsite with 585 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. Cement displaced with 95 barrels of fresh water. 35 barrels of gel pumped ahead of cement. No cement returned to surface. All depths are based on rig KB. Rig KB is 26 feet. Did not witness top out job.
1611336669 2019-02-24 Casing String Witnessed No Violations Precision Rathole drilled a 30-inch diameter borehole to 100 feet in depth and installed a 24-inch diameter conductor casing with welded joints. The conductor weighed 94.62 pounds per foot. Water was encountered during the drilling process. During my inspection a pre-job safety meeting was held with all personnel on location. Petroset cementing rigged up on location, pumped 250 sacks of class A cement with 2 percent calcium chloride, and displaced with 47 barrels of fresh water. Cement returns were not established but cement top was visible at a measured depth of 20 feet from surface.
1806434917 2019-03-27 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Pioneer 77 drilling an 8.5 inch diameter hole at 16147 feet. Estimated total depth is 19305. Kick off point was 9239 and landing point was 10537. 8.75 inch diameter hole was drilled to 10819. 9.625 inch diameter casing was set at 9019. All depths are based off of rig KB of 25 feet. Flare was burning during my inspection.
1854546697 2019-02-25 Casing String Witnessed No Violations Cement was 20 feet down on the backside of the 24-inch diameter conductor. Precision Rathole arrived on location and filled the backside of the conductor from 20 feet to surface with nine sack grout. The cement stayed at surface. Precision Rathole will wait on cement to cure prior to spudding the mousehole.
836769256 2019-7-16 0:00: CT No Violations 1.00

For data sources see[4]

References