X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20800

Well Details

Well ID: 34-081-20800
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001599
Farm/Lease Name: BUDDY SMF JF
License Status: Producing
License Date: 2018-12-28
Spud Date: 2019-01-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2019-02-26
Well Total Depth: 23014.00 ft
Configuration: Horizontal
Latitude: 40.270000
Longitude: -80.790000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-12-28 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/28/2018, Expired Date:12/27/2020 12:00:00 PM, Drilling unit acres:634.878, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2019-01-11 CORRECTION TO CASING PLAN PER OWNER REQUEST.
Reached Total Depth 2019-02-26
Correction to Well 2019-05-16 UPDATE PER AS-DRILLED PLAT (PROPOSED PERFORATIONS)
Record Last Modified 2019-05-24
Construction Permit Expires 2020-12-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10067 22892 0
10067 22892 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1247400776 2019-5-7 0:00:0 CT No Violations 1.00
-1353614362 2019-1-29 0:00: CS No Violations 1.00
-142089087 2019-6-4 0:00:0 CT No Violations 1.00
-333886475 2019-1-13 0:00: CS No Violations 2.00
-83005527 2019-8-13 0:00: PL No Violations 1.00
0142089087 2019-06-04 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 61/74 has been perforated and is awaiting frac. Stage 61 plug set at 12494 feet, with bottom perforation at 12482 feet and top perforation at 12342 feet. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 285 psi.
0333886475 2019-01-13 Casing String Witnessed No Violations PAD ADDRESS: 81 CR 10, dillonvale. On the day of my inspection I witnessed Precision rathole had augured a 30 inch diameter hole to 100 feet. 101 feet of 24 inch diameter conductor casing was run. Drillers said hole was basically dry. Petroset was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50 percent excess ran. Cement was displaced to 90 feet with 47 barrels of fresh water. 12 barrels of cement returned to surface. 10 feet of cement left in the casing.
1247400776 2019-05-07 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew on location. They are tied into Omaits 1H, 3H, and Buddy 5H, 7H wells. FTS is pumping stage 9/74. Stage 9 plug set at 21594 feet, with bottom perforation at 21582 feet and top perforation at 21443 feet. FTS pumped 48 barrels of 7.5% HCl, 3972 barrels of clean fluid, 40660 lbs of 100 mesh sand, 189940 lbs of 40/70 mesh sand, and 963 barrels of produced water. Total sand pumped was 230600 lbs. Maximum treating pressure was 11497 psi and average treating pressure was 11162 psi. Maximum rate was 78 barrels per minute (BPM) and average rate was 76 bpm. Break down pressure was 8336 psi. Initial shut in pressure (ISIP) was 6487 psi and 5 minute ISIP was 6020 psi. Frac gradient of 1.12 psi/ft. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 260 psi.
1353614362 2019-01-29 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 22 inch diameter open hole to a depth of 270 feet. Previous casing set and cemented was 24 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 270 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with 2 foot stick up. Shoe track is 24.5 feet long. Cement Baskets were set at 185 feet. Void encountered at 210-220 feet. CJ/Otex was onsite with 250 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 75 barrels of fresh water. 35 barrels of gel pumped ahead of cement. Top out was completed with 200 sacks of class A cement. KB is 12 feet. All depths are from KB except conductor.
1580244672 2020-1-28 0:00: PL No Violations 1.00
1626070403 2019-05-15 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew is on location tied into the Buddy 5H and 7H and Omaits 1H and 3H wells. Stage 18/74 plug set at 20019 feet, with bottom perforation at 20008 feet and top perforation at 19868 feet. This is the next stage on pad to frac. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 530 psi.
1864171742 2019-6-27 0:00: CT No Violations 1.00
1946293334 2019-05-21 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the Omaits 1H and 3H, and the Buddy 5H and 7H wells. They are pumping down wireline on stage 30/74. Stage 30 plug to be set at 17919, with bottom perforation at 17908 and top perforation at 17767. 9.625x5.5 annular pressure is 415 psi.
885807220 2020-1-28 0:00: PW No Violations 1.00

For data sources see[4]

References