If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20791 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-80.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001579 | |
Farm/Lease Name: LORI SE SMF JF | |
License Status: Producing | |
License Date: 2018-10-16 | |
Spud Date: 2018-10-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-01-13 | |
Well Total Depth: 21149.00 ft | |
Configuration: Horizontal | |
Latitude: 40.230000 | |
Longitude: -80.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-10-16 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/16/2018, Expired Date:10/15/2020 12:00:00 PM, Drilling unit acres:235.524, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-01-07 | |
Construction Permit Expires | 2020-10-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
9992 | 21005 | 0 | |
9992 | 21005 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1150020830 | 2019-1-3 0:00:0 | CS | No Violations | 1.50 |
-1461275076 | 2019-5-15 0:00: | CT | No Violations | 1.00 |
-1697790209 | 2019-8-14 0:00: | PL | No Violations | 1.00 |
-1951546243 | 2019-4-22 0:00: | CT | No Violations | 1.00 |
-2019627171 | 2018-12-26 0:00 | CS | No Violations | 6.00 |
-706331703 | 2019-3-27 0:00: | CT | No Violations | 1.00 |
0706331703 | 2019-03-27 | Completion Testing | No Violations | On the day of my inspection I witnessed FracTech frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They are currently performing a zipper frac on the 2H and 4H wells. They are monitoring the 5.5 x 9.625 casing annulus. There is currently 495 psi on it while the frac is occuring on the 2h well. |
0782298557 | 2019-04-11 | Completion Testing | No Violations | On the day of my inspection I witnessed a frac tech services crew on location tied into the the 1H, 6H, and 8H wells. Company men onsite were Bill Pugh and Dave Norris. Stage 14/64 plug was set at 18844, with bottom perforation at 18833 and top perforation at 18692. This stage is awaiting frac.13.375x9.625 annular pressure was 100 psi and 9.625x5.5 annular pressure was 300 psi. |
0822962047 | 2018-10-23 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mouse hole grouted back to surface. The 30 inch diameter conductor was set and cemented on 10/20/18. |
1150020830 | 2019-01-03 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the first stage intermediate casing cement job. Pioneer 77 drilled a 12.25 inch diameter open hole to a depth of 8894 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1612 feet. Wyoming casing ran 8886 feet of 9.625 inch diameter casing, hcl-80, 40 lbs/foot. Casing was centralized with 176 centralizers. Shoe track is 85 feet long. Packer ran at 4791 and DV tool at 4788. C&J/Otex was onsite with 535 sacks of class H lead cement and 750 sacks of class H tail cement. Lead cement weighed with mudscale at 14 ppg and yield of 1.35. 20% excess ran in open hole. Tail cement weighed with mudscale at 15 ppg and yield of 1.16. 20% excess ran in open hole. Cement displaced with 668 barrels of fresh water. 50 barrels of of 14 ppg spacer pumped ahead of cement. Plug landed and floats held. Rig attempted to inflate packer and thought that it had but pressure would not hold. They switched to the pump truck to ensure there were no leaks in system. Upon pressuring up, there was annular flow indicating that the packer had ruptured. Rig dropped bomb and circulated on well for three hours prior to starting second stage. I did not witness second stage but C&J had 50 barrels of 14 ppg spacer and 1715 sacks of class H tail cement weighing 15.3 ppg and a yield of 1.11. 30% excess was ran on second stage. Spoke with Company Man Ralph Dupois the next morning and he said they circulated 70 barrels of cement to surface. |
1461275076 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a CWS stand alone snubbing unit onsite drilling out frac plugs. This well has not been drilled out yet. The 13.375x9.625 annular pressure is 300 psi and the 9.625x5.5 annular pressure is 1200 psi. |
1547236589 | 2019-01-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Pioneer 77 drilling an 8.5 inch diameter hole at 20748 feet. Estimated total depth is 21145 feet and company man Ralph DuPois believes they will reach total depth this evening. There is a small flare burning during my inspection. Mud weight is currently 13.6 but will be at 13.8 ppg when they finish drilling. |
1951546243 | 2019-04-22 | Completion Testing | No Violations | On the day of my inspection I witnessed an FTS frac crew on location tied into the 1H, 6H, and 8H wells. Stage 47/64 is next on list to be fracked. Frac is currently down due to an equipment issue. Stage 47 plug set at 13102 feet, with bottom perforation at 13090 feet and top perforation at 12950 feet. The 13.375x9.625 annular pressure is 250 psi and the 9.625x5.5 annular pressure is 300 psi. |
2019627171 | 2018-12-26 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Pioneer 77 drilled a 17.5 inch diameter open hole to a depth of 1622 feet. Previous casing set and cemented was 18.6225 inch diameter mine string casing to a depth of 287 feet. Wyoming Casing ran 1614 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with 2 foot stick up. Casing was centralized. Shoe track is 45 feet long. CJ/Otex was onsite with 1210 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 30% excess ran in open hole. Cement displaced with 238 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 38 barrels of cement returned to surface, and floats held with 1.5 barrels back. |
782298557 | 2019-4-11 0:00: | CT | No Violations | 2.00 |
822962047 | 2018-10-23 0:00 | CS | No Violations | 1.00 |
For data sources see[4]