Well ID: 34-081-20789 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-80.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001579 | |
Farm/Lease Name: LORI SW SMF JF | |
License Status: Producing | |
License Date: 2018-10-16 | |
Spud Date: 2018-10-19 | |
Spud Drilling Contractor: | |
Final Drill Date: 2018-12-02 | |
Well Total Depth: 20170.00 ft | |
Configuration: Horizontal | |
Latitude: 40.230000 | |
Longitude: -80.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-10-16 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/16/2018, Expired Date:10/15/2020 12:00:00 PM, Drilling unit acres:433.831, Proposed Well Type:OG, Proposed Well Class:EOUT |
Record Last Modified | 2018-11-17 | |
Correction to Well | 2018-11-30 | CHANGE IN TARGET INFORMATION AND UNIT SIZE FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2020-10-15 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1738044247 | 2019-8-14 0:00: | PL | No Violations | 1.00 |
-45658914 | 2019-5-15 0:00: | CT | No Violations | 1.00 |
-459111882 | 2018-10-23 0:00 | CS | No Violations | 1.00 |
-565418633 | 2019-4-22 0:00: | CT | No Violations | 1.00 |
-89998153 | 2019-4-11 0:00: | CT | No Violations | 2.00 |
0045658914 | 2019-05-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a CWS stand alone snubbing unit onsite drilling out frac plugs. This well has not been drilled out yet. The 13.375x9.625 annular pressure is zero and the 9.625x5.5 annular pressure is zero. |
0089998153 | 2019-04-11 | Completion Testing | No Violations | On the day of my inspection I witnessed a frac tech services crew on location tied into the the 1H, 6H, and 8H wells. Company men onsite were Bill Pugh and Dave Norris. This well has already been fracked. Frac finished on the 56th stage on 4/4/19. 13.375x9.625 annular pressure was zero and 9.625x5.5 annular pressure was zero. |
0459111882 | 2018-10-23 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mouse hole grouted back to surface. The 30 inch diameter conductor was set and cemented on 10/20/18. |
0565418633 | 2019-04-22 | Completion Testing | No Violations | On the day of my inspection I witnessed an FTS frac crew on location tied into the 1H, 6H, and 8H wells. This well has already been fracked. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 300 psi. |
0839082152 | 2018-11-21 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the intermediate casing cement job. Pioneer 77 drilled a 12.25 inch diameter open hole to a depth of 8990 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1605 feet. Wyoming Casing ran 8938.5 feet of 9.625 inch diameter casing, 40 lbs/foot, with 3.5 foot stick up. 5841 feet of l-80 and 3097.5 feet of p-110Casing was centralized. Shoe track is 86 feet long. DV tool at 4740. C&J/otex was onsite with 535 sacks of class H lead cement. Cement weighed with mudscale at 14 ppg and yield of 1.31. 20% excess ran in open hole. Follwed lead cement with 750 sacks of 15 ppg tail cement with a 1.16 yield. Cement displaced with 670.5 barrels. 50 barrels of 12.25 ppg mudpush pumped ahead of cement. No spacer or cement returned to surface. Second stage had 50 barrels of 12.25 ppg mudpush and 1715 sacks of class H cement weighing 15.3 ppg and yield of 1.11. 30% excess ran in open hole. Displacement was 359 barrels. 30 barrels of cement returned to surface. |
0946804822 | 2019-03-27 | Completion Testing | No Violations | On the day of my inspection I witnessed FracTech frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They are currently performing a zipper frac on the 2H and 4H wells. Stage 24/56 is being pumped during my inspection. Plug set at 16081 with bottom perforations at 16069 and top perforations at 15929. Stage design is to stimulate well with 40k lbs 100 mesh and 190k lbs 40/70 mesh for a total of 230k lbs of sand. They will also pump 3000 gallons of 7.5% HCL. They are monitoring the 5.5 x 9.625 casing annulus. There is currently 375 psi on it while the frac is occuring on the well. |
1542195954 | 2018-11-14 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Pioneer 77 drilled a 17.5 inch diameter open hole to a depth of 1610 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 288 feet. Cement was circulated to surface on the mine string set on 11/12. Wyoming casing ran 1607 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot with 2 foot stick up. Casing was centralized with 12 centralizers. Shoe track is 44 feet long. C&J/Otex was onsite with 1210 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 30% excess ran in open hole. Cement displaced with 239 barrels of fresh water. 35 barrels of gel and 10 barrels of water pumped ahead of cement. 27 barrels of cement returned to surface, and floats held with 1 barrel back. Cement returned weighing 14.5 ppg. |
839082152 | 2018-11-21 0:00 | CS | No Violations | 0.00 |
946804822 | 2019-3-27 0:00: | CT | No Violations | 1.00 |
For data sources see[3]