X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20784

Well Details

Well ID: 34-081-20784
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Wayne Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001576
Farm/Lease Name: GRISWOLD WYN JF
License Status: Producing
License Date: 2018-12-17
Spud Date: 2018-10-02
Spud Drilling Contractor: XTREME DRILLING
Final Drill Date: 2019-01-17
Well Total Depth: 19109.00 ft
Configuration: Horizontal
Latitude: 40.310000
Longitude: -80.800000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-09-28 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:9/28/2018, Expired Date:9/27/2020 12:00:00 PM, Drilling unit acres:122.212, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2018-12-17 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/17/2018, Expired Date:12/16/2020 12:00:00 PM, Drilling unit acres:471.347, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-17
Record Last Modified 2019-04-22
Construction Permit Expires 2020-12-16

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
9886 18964 0
9886 18964 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1440330318 2019-5-15 0:00: CT No Violations 1.00
-1564544596 2019-1-16 0:00: DD No Violations 1.00
-1765813336 2019-6-19 0:00: CT No Violations 1.00
-2067190313 2019-5-2 0:00:0 CT No Violations 1.00
-440154646 2018-10-15 0:00 CS No Violations 4.00
0253692854 2019-01-02 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 803 drilling the 12.25 inch diameter section on air. They are currently in the Ohio shale at 4380 feet. Company man Van Dietrich said they have not seen any water or gas.
0358295224 2019-04-22 Completion Testing No Violations On the day of my inspection I witnessed FTS frac crew on location. They are tied into the 2h and 4h wells. They have not pumped a stage on this pad yet. They are currently finishing up with containment. There is an above ground storage tank for fresh water and twelve 350 barrel steel tanks for produced water, in their own containment.
0440154646 2018-10-15 Casing String Witnessed No Violations On the day of my inspection I witnessed that Falcon Rig 26 had drilled the 17.5-inch diameter hole to a depth of 1430 foot. Wyoming Casing crew ran 1416 feet of 13.325-inch diameter J 55 casing at 61 pounds per foot, with 3.4 feet of casing above Kelly Bushing, which is 13 feet above ground level. C&J Energy Services was on site and rigged up their cement head and loaded lines with 5 barrels of fresh water and pressure tested to 3000 pounds per square inch. C&J Energy Services pumped a 35-barrel gel spacer, washed up and then pumped 299.9 barrels 1415 sacks of 15.6 pounds per gallon with a yield of 1.19 cubic feet per sack Class A cement mixed with 5.24 gallons of water per sack. Cement was displaced with 209.3 barrels of fresh water, plug was bumped at 1000 pounds per square inch and pressured up to 1500 pounds per square inch floats held with 1.25 barrels of flow back. There was 50 barrels of good cement to surface. I informed Ascent company man Tony Shepard that the casing must remain static until cement reaches a compressive strength of 500 pounds per square inch.
0549780541 2019-01-06 Casing String Witnessed No Violations On the day of my inspection I witnessed the second stage intermediate casing cement job. Akita 803 drilled a 12.25 inch diameter open hole to a depth of 8465 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1418 feet. Wyoming casing ran 8447 feet of 9.625 inch diameter casing, hcl-80, 40 lbs/foot. Casing was centralized. Shoe track is 84 feet long. Packer ran at 4500 and DV tool at 4496. Schlumberger was onsite with 508 sacks of class A lead cement and 727 sacks of class A tail cement. Lead cement weighed with mudscale at 13.5 ppg and yield of 1.67. 35% excess ran in open hole. Tail cement weighed with mudscale at 15.6 ppg and yield of 1.19. 35% excess ran in open hole. Cement displaced with 634 barrels of oil based mud. 28 barrels of 12.2 ppg spacer pumped ahead of cement. Plug landed and floats held. Rig inflated packer and dropped bomb. I did not witness first stage. For the second stage Schlumberger had 28 barrels of 12.2 ppg spacer and 1477 sacks of class A tail cement weighing 15.6 ppg and a yield of 1.67. 30% excess was ran on second stage. Cement displaced with 340 barrels of oil based mud. 68 barrels of cement returned to surface on second stage and 20 barrels of cement returned from first stage.
1292158701 2019-05-21 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew on location. They are currently tied into the 6H and 8H wells. Wireline is being pumped down to plug and perforate stage 31/52. Stage 31 plug to be set at 13756, with bottom perforation at 13743 and top perforation at 13603. 9.625x5.5 annualr pressure is 550 psi.
1440330318 2019-05-15 Completion Testing No Violations On the day of my inspection I witnessed a FTS frac crew is on location tied into the 6H and 8H wells. FTS is pumping stage 5/52. Stage 5 plug set at 18358 feet, with bottom perforation at 18345 feet and top perforation at 18205 feet. FTS pumped 71 barrels of 7.5% HCl, 4681 barrels of clean fluid, 837 barrels of produced water, 42080 lbs of 100 mesh sand, and 188380 lbs of 30/70 mesh sand. Total sand pumped was 230460 lbs. Maximum treating pressure was 11646 psi and average treating pressure was 10860 psi. Maximum rate was 83 barrels per minute (BPM) and average rate was 78 bpm. Break down pressure was 8378 psi. Initial shut in pressure (ISIP) was 5681. 5 minute ISIP was 5385. Frac gradient of 1.04 psi/ft. The 13.375x9.625 annular pressure is zero and the 9.625x5.5 annular pressure is 500 psi.
1443233188 2018-10-03 Casing String Witnessed No Violations PAD ADDRESS: 1646 CR 23 Bloomingdale. On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 315 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 50 percent excess ran. Mix water tested 68 degrees Fahrenheit, pH of 6.5 and 31 ppm chlorides. Cement was displaced with 72 barrels of fresh water. 15 barrels of cement returned to surface.
1554915539 2019-04-10 Completion Testing No Violations On the day of my inspection I witnessed this location is being prepped for frac. There is a disassembled aboveground storage tank onsite and several frac tanks. All wells on location have frac stacks on. 13.375x 9.625 annular pressure is zero and 9.625 x 5.5 annular pressure is 500 psi.
1564544596 2019-01-16 Drill / Deepen / Reopen No Violations On the day of my inspection I was accompanied by Inspector Ken Frye. Akita 803 has reached total depth of 19109. There current mud weight is 14.6 ppg with 2500-3800 units of gas at total depth. Wyoming casing is onsite running 19119.4 feet of 5.5 inch diameter casing, p-110, 23 lbs/ft, with a 10.4 foot stick up.
1941925030 2019-8-15 0:00: PL No Violations 1.00
2067190313 2019-05-02 Completion Testing No Violations On the day of my inspection I witnessed a FTS crew on location. They are currently tied into the 2H and 4H wells. FTS is doing an injection test on the 4H well. This well has not been opened up for frac. The 13.375x9.625 annular pressure was not viewed and the 9.625x5.5 annular pressure is 550 psi.
253692854 2019-1-2 0:00:0 DD No Violations 1.00
358295224 2019-4-22 0:00: CT No Violations 1.00
382344031 2019-6-10 0:00: CT No Violations 1.00
549780541 2019-1-6 0:00:0 CS No Violations 4.00

For data sources see[4]

References