X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20783

Well Details

Well ID: 34-081-20783
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Mount Pleasant Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001572
Farm/Lease Name: RUTH W MTP JF
License Status: Producing
License Date: 2018-09-10
Spud Date: 2018-09-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-11-10
Well Total Depth: 21559.00 ft
Configuration: Horizontal
Latitude: 40.170000
Longitude: -80.880000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-09-10 Proposed Formations:POINT PLEASANT, Issued Date:9/10/2018, Expired Date:9/9/2020 12:00:00 PM, Drilling unit acres:550.143, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-11-10
Record Last Modified 2019-01-28
Correction to Well 2019-04-26 UPDATE TAKE/TARGET AS-DRILLED PLAT
Construction Permit Expires 2020-09-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
21365 21421 0
9754 9895 0
9754 9895 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/16/2019 02/22/2019 9524 6,725,170.0 68180

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand FTSI Proppant Listed Below Green Line Listed Below 0 0 0
CS-1000 SI FTSI Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
CI-150 FTSI Acid Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
Suspending Agent 1302-78-9 5 0.00001024 0
Propargyl Alcohol 107-19-7 5 0.00003729 0
Orthophosphoric acid 7664-38-2 0.75 0.000177804 0
Ethanol 64-17-5 5 0.00106519 0
Silica, Quartz 14808-60-7 100 2.54816 0
Hydrochloric acid 7647-01-0 0.005 0.00000119 0
Thiourea-formaldehyde Copolymer 68527-49-1 10 0.00007458 0
Raffinates, Sorption Process 64741-85-1 55 0.000112675 0
Quartz 14808-60-7 4 0.00000819 0
N-olefins Proprietary 3 0.00002237 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0218754 0
Citric Acid 77-92-9 30 0.0013977 0
Phosphorous Acid 10294-56-1 2 0.000474145 0
Glutaraldehyde 111-30-8 5 0.00106519 0
Silica, Quartz 14808-60-7 100 8.25894 0
Quaternary ammonium compound 68424-85-1 10 0.00213037 0
Fatty Acids, Tall Oil 61790-12-3 10 0.00007458 0
Guar gum 9000-30-0 55 0.000112675 0
Phosphonic Acid, {Nitrilotris (methylene)} Tris 6419-19-8 35 0.00829754 0
Petroleum Distillate 64742-47-8 55 0.000112675 0
Phosphonic Acid, {(Dimethylamino) Methylene} Bis - 29712-30-9 5 0.00118536 0
Cationic Polyacrylamide 9003-05-8 30 0.0218754 0
Isotridecanol, ethoxylated 9043-30-5 2 0.00000410 0
Alcohol Ethoxylate Surfactants Proprietary 10 0.00007458 0
Hydrogen Chloride 7647-01-0 7.5 0.0613176 0
Methanol 67-56-1 90 0.000671236 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00364589 0
Acetic acid 64-19-7 40 0.0018636 0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 0.75625 0
Water 7732-18-5 55 0.013039 0
Water 7732-18-5 45 0.00209655 0
Water 7732-18-5 50 0.0364589 0
Water 7732-18-5 100 0.0213037 0
HVG-1 4.0 FTSI Water gelling agent Listed Below Green Line Listed Below 0 0 0
FE-200A FTSI Iron Control Listed Below Green Line Listed Below 0 0 0
FRW-1450 FTSI Friction Reducer Listed Below Green Line Listed Below 0 0 0
40/70 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 88.2518 56,087,900.0
0.1%-7.5% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
Bactron K-139 FTSI Biocide Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1250985685 2019-4-22 0:00: CT No Violations 1.00
-152691645 2019-6-5 0:00:0 PW No Violations 1.00
-1763156373 2019-3-12 0:00: CT No Violations 0.40
-185257938 2019-1-10 0:00: CT No Violations 1.00
-1974975058 2019-8-19 0:00: PL No Violations 1.00
-412289695 2018-11-7 0:00: DD No Violations 1.00
-575943182 2019-5-7 0:00:0 CT No Violations 1.00
-967218687 2018-10-30 0:00 CS No Violations 1.00
0152691645 2019-06-05 Production Wells No Violations On the day of my inspection I was accompanied by Supervisor Eric Conrad. We witnessed that the pad is currently in flowback operations. There is no tubing in the well and it is producing out of the 5.5 inch diameter casing. The 13.375x9.625 annular pressure is 318 psi and the 9.625x5.5 annular pressure is 796 psi. Production casing has 5677 psi. Permanent production equipment onsite includes four line heaters, four GPUs, eight sand seperators, two 500 barrel steel tanks, and one combustor. Temporary flowback equipment includes two line heaters and two sand vessels.
0185257938 2019-01-10 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on lcoation. They are tied in to this well and the 4H well. At present they are pumping stage 6. PLug was set at 20642, with top perf at 20491 and bottom perf at 20631. 3000 gallons of 7.5% HCl, and 350000 lbs of sand in stage design. Breakdown pressure was 8147. Did not witness entire stage to get clean total, average/max rates or pressures, or initial shut in pressure. Could not read surface annular gauge as there was pressure on the lines. Intermediate annular reads 217 from transducer.
0412289695 2018-11-07 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 577 on location. They have reached total depth of 21559 with an 8.5 inch diameter bit. Mud weight is 14.8. Company man Cecil Lovell said that they circulated and there is no flow on the well. The are going to trip out to run production casing.
0575943182 2019-05-07 Completion Testing No Violations On the day of my inspection I witnessed a CWS stand alone snubbing unit onsite. This well has had all frac plugs drilled out and is awaiting flowback. 13.375x9.625 annular pressure is 500 psi and 9.625x5.5 annular pressure is 200 psi. Company man Gary Seago anticipates moving off of the pad by end of week.
0873131440 2019-02-13 Completion Testing No Violations The inspection revealed the FTS service company is rigging equipment up. Universal well services were on site and there was issue with treating iron and fittings. The frac is currently at stage 48 of 67. I talked to William and Homer Bowman the consultants over the completions. They will call when they are up and running again.
0936194089 2019-04-10 Completion Testing No Violations On the day of my inspection I witnessed CWS stand alone snubbing unit onsite. 13.375 x9.625 annular pressure is 500 psi and 9.625 x5.5 annular pressure is zero psi. 2h, 4h, and 6h wells have been drilled out and are awaiting flowback operations. Contractor are onsite installing production equipment.
0967218687 2018-10-30 Casing String Witnessed No Violations On the day of my inspection I witnessed the rig preparing for the intermediate casing cement job. Patterson 577 drilled a 12.25 inch diameter open hole to a depth of 8690 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1590 feet kb. Wyoming Casing was running 8686 feet of 9.625 inch diameter casing, l-80, 40 lbs/foot. Casing was centralized every joint. Shoe track is 90 feet long. C&J was onsite with 615 sacks of class H lead cement and 615 class H tail cement. Lead cement weighs 13.5 ppg and yield of 1.53. Tail cement weighs 15.3 and yield of 1.13. 20 excess ran in open hole. Dispalcement of first stage is 657 barrels. 50 barrels of 12.5 ppg spacer pumped ahead of cement. DV tool set at 4494.
1250985685 2019-04-22 Completion Testing No Violations On the day of my inspection I witnessed a CWS stand alone snubbing unit onsite. This well has had all frac plugs drilled out and is awaiting flowback. 13.375x9.625 annular pressure is 500 psi and 9.625x5.5 annular pressure is 200 psi.
1537539385 2018-09-21 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 24 inch diameter open hole to a depth of 315 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 308 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot. Shoe track is 24.5 feet long. Cement Baskets were set at 240 feet. Void encountered at 260-272 feet. CJ/O-tex was onsite with 605 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 87 barrels of fresh water. 20 barrels of gel pumped ahead of cement. No cement returned to surface. 5 barrels of cement pumped down backside to set up on basket. An additional 15 barrels of cement was pumped down backside after a 2 hour wait time. An additional 15 barrels of cement was pumped down backside after a 2 hour wait time. Finally 44 barrels pumped on last top out for a total of 79 barrels top out.
1547492898 2019-01-14 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Stage 16 plug is set at 18882 with bottom perfs at 18870 and top perfs at 18730. This is the next stage to frac but they are currently down for maintenance. Stage design includes 350000 lbs of sand and 3000 gallons of 7.5% Hcl. Surface annular pressure is 0 and intermediate annular pressure is 280.
1699551569 2019-05-16 Completion Testing No Violations On the day of my inspection I witnessed the drill out crew is no longer on location. The 13.375x9.625 annular pressure is 500 psi and the 9.625x5.5 annular pressure is 200 psi. Contractors are onsite placing production trees on the wells.
1763156373 2019-03-12 Completion Testing No Violations The well is completed and is waiting on drill-out operations. The surface annulus pressure is at 2,000 psi and the intermediate annular pressure is at 0 psi. The company was told to bring the pressure down.
214749723 2019-10-22 0:00 PW No Violations 1.00
414773143 2020-4-21 0:00: PW No Violations 1.00
873131440 2019-2-13 0:00: CT No Violations 0.20
936194089 2019-4-10 0:00: CT No Violations 1.00

For data sources see[5]

References