If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20768 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-80.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001532 | |
Farm/Lease Name: GORDON SE CRC JF | |
License Status: Producing | |
License Date: 2018-04-27 | |
Spud Date: 2018-05-10 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-06-29 | |
Well Total Depth: 19381.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -80.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-04-27 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/27/2018, Expired Date:4/27/2019, Drilling unit acres:244.454, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-06-29 | |
Correction to Well | 2018-12-21 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2019-04-27 | |
Completion Report Received | 2019-05-30 | |
Record Last Modified | 2019-06-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-06-05 | 19077 | 19180 | 0 |
19077 | 19180 | 0 | |
19077 | 19180 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/30/2018 | 10/23/2018 | 9744 | 28,243,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LD-2850 | Halliburton | Friction Reducer | Listed Below | ||||
MX 5-2402 | Halliburton | Biocide | Listed Below | |||||
Recycled Water | Operator | Base Fluid | Listed Below | |||||
FE-2A | Halliburton | Additive | Listed Below | |||||
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | |||||
FDP-S1296-17 | Halliburton | Corrosion Inhibitor | Listed Below | |||||
SP BREAKER | Halliburton | Breaker | Listed Below | |||||
Ingredients | Listed Above | Listed Above | Listed Below | |||||
SCALECHEK LP-50 | Halliburton | Scale Inhibitor | Listed Below | |||||
Sodium Chloride | 7647-14-5 | 30 | 0.0153917 | 41169 | ||||
pH Buffer | 8055-55-8 | 15 | 0.00007258 | 195 | ||||
Citric acid | 77-92-9 | 60 | 0.00157572 | 4215 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000001 | 1 | ||||
Methonal | 67-56-1 | 100 | 0.000364056 | 974 | ||||
Methanol | 67-56-1 | 30 | 0.00522809 | 13984 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00000875 | 24 | ||||
Propargyl Alchohol | 107-19-7 | 5 | 0.00001820 | 49 | ||||
Water | 7732-18-5 | 100 | 69.4769 | 185,833,000.0 | ||||
Water | 7732-18-5 | 100 | 20.1376 | 53,863,100.0 | ||||
Alcohols C12-16 | 68551-12-2 | 5 | 0.00256528 | 6862 | ||||
Phosphate of a Diamine, Sodium Salt | Proprietary | 30 | 0.00522809 | 13984 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00004839 | 130 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0074896 | 20033 | ||||
Modified Thiourea Polymer | Proprietary | 30 | 0.000109217 | 293 | ||||
Polymer Blend | CAS Not Assigned | 68 | 0.00032905 | 881 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.1917 | 27,260,300.0 | ||||
Ethoxylated Alcohols | Proprietary | 5 | 0.00001820 | 49 | ||||
Hydrotreated light Petroleum Distillate | 64742-47-8 | 30 | 0.0153917 | 41169 | ||||
Sodium Nitrate | 7631-99-4 | 60 | 0.0121449 | 32485 | ||||
Water | 7732-18-5 | 100 | 0.111893 | 299287 | ||||
Ammonium Chloride | 12125-02-9 | 5 | 0.00256528 | 6862 | ||||
9-Octadecenamide | 93-83-4 | 5 | 0.00256528 | 6862 | ||||
MX 8-4543 | Halliburton | Biocide | Listed Below | |||||
Fresh Water | Operator | Base Fluid | Listed Below | |||||
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | |||||
GEL 1100 | Mountain Oilfield Supply & Service | Additive | Listed Below | |||||
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-10-04 | H2O | 0 | 11740 Bbl | 520460 | Halliburton | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Lewis. Last stimulation was stage 7/53. Intermediate annular pressure is 498. Plug set at 18183, with bottom perforation at 17172 and top perforation at 18031. This was a large stage. Total volume was 11740 barrels pumped. 60 barrels of 7.5% HCl pumped. 120340 pounds of 100 mesh sand and 400120 pounds of 40/70 mesh sand pumped. Break down pressure was 9827 at 30 barrels per minute. Ave |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | 1834789 | 0 | 79 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | ASCENT RESOURCES UTICA LLC | Brine | 19784 | 79 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1179110370 | 2018-11-5 0:00: | CT | No Violations | 1.00 |
-1400121568 | 2018-11-15 0:00 | CT | No Violations | 1.00 |
-1573328466 | 2020-1-29 0:00: | UP | No Violations | 1.00 |
0458819837 | 2018-12-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid R252 on location drilling out frac plugs. The rig has drilled the plugs out of this well. Surface annular pressure gauge reads 0 and intermediate annular gauge reads 500. Production equipment includes five GPUs, five line heaters, two sand traps, and two 500 barrel steel tanks in their own containment. |
0491744585 | 2018-10-22 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location tied into the 2h, 4h, and 6h wells. Identified myself to Company men Chris Nunez and Justin. Surface annular pressure is 0 and intermediate is 500. This well is on frac stage 51/53. This stage has plug set at 10483, bottom perforation at 10472, and top perforation at 10331. This stage has not been stimulated. They are pressure testing and will start stimulation soon. |
0593814010 | 2018-06-20 | Urban Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 drilling a 12.25 inch diameter hole at 7464. They air drilling on air. This segment has a 10 degree tangent. Plan to reach total dpeth of 8650 on this section and cement 9.625 inch diameter casing on Friday. Containment is full and nearly overtopping on the southern edge of containment. Company man Josh Delso was informed and he said he would get it sucked out. Containment around produced water tanks also had a hole in it which Josh was informed about as well. He said he would get it taken care of as well. I will follow up in the near future. |
0904872524 | 2018-12-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Hybrid Drilling R252 on location drilling out frack plugs. Plugs have all been drilled out on this well and is awaiting flow back operations. Surface and annular gauges read 0 with valves to gauges closed. |
1113180800 | 2018-10-04 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. I identified myself to company man Lewis. Last stimulation was stage 7/53. Intermediate annular pressure is 498. Plug set at 18183, with bottom perforation at 17172 and top perforation at 18031. This was a large stage. Total volume was 11740 barrels pumped. 60 barrels of 7.5% HCl pumped. 120340 pounds of 100 mesh sand and 400120 pounds of 40/70 mesh sand pumped. Break down pressure was 9827 at 30 barrels per minute. Average rate was 78 barrels per minute and maximum was 80. average pressure was 11325 and maximum was 12087. Initial shut in pressure was 7055 and 5 minute ISIP was 6653. |
1179110370 | 2018-11-05 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain five wells. Identified myself to company man Chuck Davies. Halliburton frac crew is on location. Stimulation is completed on this well. Surface annular pressure was 200 and intermediate annular was 500. |
1307054787 | 2018-05-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Precision spud this well while waiting on cement top outs for other wells on pad. They drilled 15 feet of a 20 inch diameter hole while I was onsite. |
1400121568 | 2018-11-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew on location. This well has been stimulated. Surface annular pressure is 150 and intermediate annular pressure is 470. |
1529049198 | 2018-06-15 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 584 drilled a 17.5 inch diameter open hole to a depth of 1405 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming Casing ran 1408 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 3 foot stick up. Casing was centralized with 13 centralizers. Shoe track is 43 feet long. Schlumberger was onsite with 1485 sacks of class H cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 40% excess ran in open hole. Cement displaced with 206 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 96 barrels of cement returned to surface, and floats held with 1 barrel back. |
1673434698 | 2018-06-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 drilling an 8.75 inch diameter hole at a depth of 17725 feet. Planned total depth of well is 19380 feet. The currently have a small flare burning on location. Drilling with 14.1 ppg oil based mud. Walk around location revealed containment in functioning properly. |
1758647616 | 2019-9-11 0:00: | PW | No Violations | 1.00 |
349526610 | 2019-6-18 0:00: | UL | No Violations | 1.00 |
458819837 | 2018-12-18 0:00 | CT | No Violations | 1.00 |
491744585 | 2018-10-22 0:00 | CT | No Violations | 1.00 |
593814010 | 2018-6-20 0:00: | UD | No Violations | 1.00 |
904872524 | 2018-12-26 0:00 | CT | No Violations | 1.00 |
For data sources see[10]