Well Details

Well ID: 34-081-20751
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Mount Pleasant Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001530
Farm/Lease Name: COLAIANNI SE MTP JF
License Status: Producing
License Date: 2017-12-27
Spud Date: 2018-01-11
Spud Drilling Contractor: XTREME DRILLING
Final Drill Date: 2018-05-14
Well Total Depth: 20922.00 ft
Configuration: Horizontal
Latitude: 40.160000
Longitude: -80.820000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-27 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/27/2017, Expired Date:12/27/2019 12:00:00 PM, Drilling unit acres:296.824, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-05-14
Correction to Well 2018-09-14 TAKE/TARGET AS-DRILLED
Completion Report Received 2019-05-29
Record Last Modified 2019-06-06
Construction Permit Expires 2019-12-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-06-05 10139 10280 0
2019-06-05 20635 20743 0
20635 20743 0
10139 10280 0
10139 10280 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/23/2018 12/15/2018 9778 28,630,100.0 163299

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 APB-1 FTSI Gel breaker Listed Below Green Line Listed Below 0 0 0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 100 0.0238649 0
Water 7732-18-5 92.5 0.407515 0
Water 7732-18-5 45 0.00112975 0
Water 7732-18-5 55 0.014676 0
Water 7732-18-5 50 0.0381706 0
CI-150 FTSI Acid Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
FRW-1450 FTSI Friction Reducer Listed Below Green Line Listed Below 0 0 0
CS-1000 SI FTSI Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
HVG-1 4.0 FTSI Water gelling agent Listed Below Green Line Listed Below 0 0 0
40/70 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 95.6466 238,775,000.0
Cationic Polyacrylamide 9003-05-8 30 0.0229024 0
Orthophosphoric acid 7664-38-2 0.75 0.000200128 0
Sodium Metaborate 7775-19-1 1.4 0.00000122 0
Glutaraldehyde 111-30-8 5 0.00119324 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00381706 0
Raffinates, Sorption Process 64741-85-1 55 0.00357606 0
Isotridecanol, ethoxylated 9043-30-5 2 0.000130039 0
Suspending Agent 1302-78-9 5 0.000325096 0
Phosphorous Acid 10294-56-1 2 0.000533674 0
Quaternary ammonium compound 68424-85-1 10 0.00238649 0
Petroleum Distillate 64742-47-8 55 0.00357606 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0229024 0
Phosphonic Acid, {Nitrilotris (methylene)} Tris 6419-19-8 35 0.0093393 0
Quartz 14808-60-7 4 0.000260077 0
Hydrochloric acid 7647-01-0 0.005 0.00000133 0
Phosphonic Acid, {(Dimethylamino) Methylene} Bis - 29712-30-9 5 0.00133419 0
Hydrogen Chloride 7647-01-0 7.5 0.0330418 0
Acetic acid 64-19-7 40 0.00100423 0
Guar gum 9000-30-0 55 0.00357606 0
Sodium Perborate Tetrahydrate 10486-00-7 98 0.00008550 0
Thiourea-formaldehyde Copolymer 68527-49-1 10 0.00004019 0
Silica, Quartz 14808-60-7 100 2.82001 0
Propargyl Alcohol 107-19-7 5 0.00002009 0
Alcohol Ethoxylate Surfactants Proprietary 10 0.00004019 0
Citric Acid 77-92-9 30 0.00075317 0
Fatty Acids, Tall Oil 61790-12-3 10 0.00004019 0
N-olefins Proprietary 3 0.00001206 0
Methanol 67-56-1 90 0.000361705 0
Silica, Quartz 14808-60-7 100 0.954214 0
Ammonium Persulfate 7727-54-0 100 0.00221437 0
Ethanol 64-17-5 5 0.00119324 0
100 Mesh Sand FTSI Proppant Listed Below Green Line Listed Below 0 0 0
SPB-1 FTSI Breaker Listed Below Green Line Listed Below 0 0 0
0.1%-7.5% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
Bactron K-139 FTSI Biocide Listed Below Green Line Listed Below 0 0 0
FE-200A FTSI Iron Control Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-12-15 H2O 15 9576 Bbl 525969 Frac Tech Services
2018-11-23 H2O 7 4496 Bbl 160300 Frac Tech Services

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC 1572809 0 61

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC Brine 15405 61

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1104034502 2019-1-14 0:00: CT No Violations 1.00
-1246698071 2018-11-15 0:00 CT No Violations 1.00
-143949912 2018-1-23 0:00: DD No Violations 1.00
-1754671215 2018-4-9 0:00:0 DD No Violations 1.00
-1876891734 2018-4-16 0:00: DD No Violations 1.00
-365456079 2018-10-23 0:00 CT No Violations 2.00
-370120939 2018-2-9 0:00:0 CS No Violations 6.00
-636703827 2018-8-29 0:00: PL No Violations
0062504873 2018-11-05 Completion Testing No Violations On the day of my inspection I witnessed this pad contains 3 wells. FTS frac crew is on location. Identified myself to company man Bill Pugh. This well has not had any stimulation yet. Frac is shut down due to close proiximately of active drilling. There are 61 stages on this well. Surfaceand intermediate annular pressures are 0.
0092862713 2018-11-28 Completion Testing No Violations On the day of my inspection I witnessed FTS on location. I was accompanied by inspector Jeff Adams. Identified myself to company man Jeff Whitehair. They just finished perforating stage 12/61. Plug was set at 18866, with bottom perforation at 18854 and top perforation at 18749. Surface annular pressure was 0 and intermediate annular pressure was 250.
0143949912 2018-01-23 Drill / Deepen / Reopen No Violations On the day of my inspection I found pad having two auger-type conductor rigs drilling. Company representative Stuart Schwarts said that this well had a 36 inch diameter hole drilled to 40 feet. It was then grouted to surface. It was again drilled to 30 feet and had wet grout in it. Hole was grouted to surface again. After 48 hours it was drilled with 42 inch diameter bit to a depth of 45 feet. Fiberglass tubing was ran and well was cemented back to surface. This date, the well is being augered with a 36 inch bit.
0365456079 2018-10-23 Completion Testing No Violations On the day of my inspection I witnessed FTS onsite. Identified myself to company man Mike Wiberg. Currently the 2H well is the only well being stimulated. Company man said that is because on proximatey with drilling rig. Surface annular pressure is 0 and intermediate annular pressure is 253.
0370120939 2018-02-09 Casing String Witnessed No Violations On the day of my inspection Falcon Rig 26 had reached total depth in the 24-inch diameter open hole section of the well bore at 326 feet. The 18.625-inch diameter casing was ran to total depth. A cement basket was placed at a depth of 327 feet on the 18.625-inch diameter casing. The number 8-A coal was encountered from 257 feet to 263 feet. A void was encountered at 280 feet to 287 feet. O-Tex cementing was on site to provide cementing procedures for the casing job. A safety meeting was held prior to cementing operations to ensure safety and go over the cementing procedures. O-Tex pumped 35 barrels of gel sweep ahead of the cement followed by 127 barrels of Class A cement that was weight checked on the scale for accuracy. The cement weight was 15.8 pound per gallon with a yield of 1.17. Cement additives included 3 percent Calcium Chloride and .2 percent X-AIRP. Cementing procedures did not produce cement to surface and another cementing procedure ensued to retain cement to surface.
0636703827 2018-08-29 Preliminary Restoration No Violations On the day of my inspection I found this pad to contain 3 unlabeled wellheads. These wells have not been stimulated. Weld inspector is onsite x-raying the pipeline to the pad. Surface and intermediate gauges are in cellar, underwater, and unable to be read. 5 frac tanks are on location and no other equipment. Pad is stable and vegetated. Site meets requirements of OAC 1509.072A for preliminary restoration.
0654813180 2018-05-08 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 803 was drilling their lateral at 17326 feet. Lazy flare is burning 2-3 feet, intermittently. Walked around location with Company man Van and pointed out minor things I would like to see cleaned up on and around the containment. Pad drains are shut and problem areas were cleaned up before I left location.
1104034502 2019-01-14 Completion Testing No Violations On the day of my inspection I witnessed Hybrid R252 on location. They have already drilled out frac plugs on this well. Surface and intermediate annular gauges are shut and read 0.
1192258552 2018-04-24 Drill / Deepen / Reopen No Violations On the day of my inspection I wintessed Xtreme 803 was drilling a 12.25 inch diameter hole at 5146 feet. This is a new rig and will be using oil base mud for the first time in the next few days. I informed Company man Ted Snelling to be careful and alert to any leaks of mud onto location as it is a new system that has not had fluid in it before.
1196799272 2018-02-11 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1667 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 323 feet. Wyoming Casing ran 1660.3 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot with a 3.3 foot stick up. Casing was centralized with 14 centralizers. Shoe track is 44 feet long. O-tex was onsite with 1315 sacks of class H cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 40% excess ran in open hole. Cement displaced with 245 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 50 barrels of cement returned to surface, and floats held with 1.5 barrels back.
1246698071 2018-11-15 Completion Testing No Violations On the day of my inspection I wintessed a Univeral frac crew on location. They are stimulating the 2h well and have not opened this well yet. Surface annular pressure is 0 and intermediate annular pressure is 350.
1517331417 2018-01-25 Casing String Witnessed No Violations On the day of my inspection I was accompanied by Engineer Technician Jerry Smith. We witnessed Express had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18 50% percent excess ran. Cement was displaced with 75 barrels of fresh water. 10 barrels of cement returned to surface. Had to wait on water trucks for each conductor witnessed.
1544465362 2018-12-05 Completion Testing No Violations On the day of my inspection I witnessed a frac tech crew on location. Identifed myself to company man Doug Wilson. They finished pumping stage 30/61 on this well during my inspection. Plug was set at 15716, with bottom perforation at 15704 and top perforation and 15564. FTS pumped 2000 gallons of 7.5% HCl, 11559 barrels of clean fluid, and 525298 lbs of sand. 120440 lbs of 100 mesh and 404858 lbs of 40/70 mesh. Breakdown pressure was 9263 at 22.9 barrels per minute (BPM). Max rate was 86.2 bpm and average rate was 84.4 bpm. Max pressure was 11882 and average pressure was 11006. Initial shut in pressure (ISIP) was 6760 and 5 minute ISIP was 6268.Surface annular pressure was 0 and intermediate annular pressure was 0.
1754671215 2018-04-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found the Xtreme 803 is on location partially rigged up. The rig is waiting on a piece of substructure and plans to spud in the next 10 days.
1848936494 2018-10-30 Completion Testing No Violations On the day of my inspection I found FTS onsite tied in to all 3 wells on the pad. I identified myself to company men Bill Pugh and Brady Allen. Surface annular pressure was 0 and intermediate annular pressure was 170. This well has not been stimulated.
1876891734 2018-04-16 Drill / Deepen / Reopen No Violations On the day of my inspection Xtreme 803 was still rigging up and Company Man Ted Snellings hopes to spud later this week.
209764307 2019-6-17 0:00: PL No Violations 1.00
62504873 2018-11-5 0:00: CT No Violations 1.00
654813180 2018-5-8 0:00:0 DD No Violations 1.00
92862713 2018-11-28 0:00 CT No Violations 1.00