If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20748 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-80.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Mount Pleasant Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001528 | |
Farm/Lease Name: ELITE W MTP JF | |
License Status: Producing | |
License Date: 2018-02-05 | |
Spud Date: 2018-01-02 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-04-12 | |
Well Total Depth: 21045.00 ft | |
Configuration: Horizontal | |
Latitude: 40.180000 | |
Longitude: -80.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-13 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/13/2017, Expired Date:12/13/2019 12:00:00 PM, Drilling unit acres:227.06, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2018-02-05 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/5/2018, Expired Date:2/5/2020 12:00:00 PM, Drilling unit acres:556.204, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-04-12 | UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE. |
Correction to Well | 2019-04-26 | UPDATE TARGET/TAKE AS-DRILLED PLAT |
Record Last Modified | 2019-06-05 | UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE. |
Construction Permit Expires | 2020-02-05 | UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-31 | 9967 | 10108 | 0 |
2018-10-31 | 20812 | 20916 | 0 |
20812 | 20916 | 0 | |
9967 | 10108 | 0 | |
9967 | 10108 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/09/2018 | 08/05/2018 | 9639 | 14,121,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unislick CST-LA | UPP | Friction reducer | Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000501516 | 670.756 |
CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0125379 | 16768.9 | ||||
Water | 7732-18-5 | 55 | 0.0275834 | 36891.6 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00100303 | 1341.51 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0125379 | 16768.9 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00752275 | 10061.3 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00150455 | 2012.27 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00150455 | 2012.27 | ||||
I-7L | UPP | Iron Control | Ethylene glycol | 107-21-1 | 20 | 0.00102282 | 1367.98 | |
Hydroxyacetic acid | 79-14-1 | 5 | 0.000255706 | 341.995 | ||||
Ammonium glycolate | 35249-89-9 | 20 | 0.00102282 | 1367.98 | ||||
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.1092 | 117,842,000.0 | |
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0701653 | 93843 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000501516 | 670.756 | |
Sodium Chloride | 7647-14-5 | 15 | 0.00752275 | 10061.3 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000382978 | 512.216 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.00102282 | 1367.98 | ||||
Methanol | 67-56-1 | 5 | 0.00003830 | 51.222 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000766 | 10.244 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.00100303 | 1341.51 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000255706 | 341.995 | ||||
DETA phosphonate | 15827-60-8 | 5 | 0.00109889 | 1469.71 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0125379 | 16768.9 | ||||
Thiourea | 62-56-6 | 1 | 0.00000766 | 10.244 | ||||
Water | 7732-18-5 | 44.3 | 0.0090333 | 12081.6 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00150455 | 2012.27 | ||||
Water | 7732-18-5 | 55 | 0.0275834 | 36891.6 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00150455 | 2012.27 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.0101956 | 13636.1 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00109889 | 1469.71 | ||||
Unihib G | UPP | Acid inhibitor | Thiourea | 62-56-6 | 1 | 0.00000766 | 10.244 | |
Butyl diglycol | 112-34-5 | 75 | 0.000574467 | 768.324 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000382978 | 512.216 | ||||
Methanol | 67-56-1 | 5 | 0.00003830 | 51.222 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000766 | 10.244 | ||||
K-Bac 1005 | UPP | Biocide | Polyethylene glycol | 7732-18-5 | 50 | 0.0101956 | 13636.1 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.00117453 | 1570.88 | ||||
Water | 7732-18-5 | 44.3 | 0.0090333 | 12081.6 | ||||
Scale Inhibitor E | UPP | Scale Inhibitor | Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.00439555 | 5878.85 | |
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00109889 | 1469.71 | ||||
DETA phosphonate | 15827-60-8 | 5 | 0.00109889 | 1469.71 | ||||
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 10.8246 | 14,477,500.0 | |
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00320536 | 4287.02 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-04 | H2O | 15 | 5032 Bbl | 231764 | Universal Well Services Inc. | STAGE 63/63
STAGES 2-62 SEE IMAGES |
2018-06-02 | H2O | 15 | 6027 Bbl | 231079 | Universal Well Services Inc. | STAGE 1/63
STAGES 2-62 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 3151991 | 0 | 115 |
2019 | ASCENT RESOURCES UTICA LLC | 1778519 | 0 | 67 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 20417 | 115 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 12321 | 67 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1064815321 | 2018-2-2 0:00:0 | CS | No Violations | 4.00 |
-1549019831 | 2018-8-6 0:00:0 | CT | No Violations | 1.00 |
-1569388674 | 2018-8-29 0:00: | PW | No Violations | 1.00 |
-1864101991 | 2018-8-22 0:00: | CT | No Violations | 1.00 |
-467289152 | 2018-8-15 0:00: | CT | No Violations | 1.00 |
-554146396 | 2018-5-25 0:00: | DD | No Violations | 0.50 |
-728343938 | 2018-4-2 0:00:0 | CS | No Violations | 1.00 |
0467289152 | 2018-08-15 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well rig 11 was on location. ID to company man James Edwards. Surface annular pressure was 700 psi and intermediate annular pressure was 700 psi. Frac plugs have not been drilled out. |
0554146396 | 2018-05-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found a crew cleaning up the pad. Patterson 584 has moved off location. Company man Tony Shepard onsite. |
0562468077 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company men Bub Rucker and Brady. Universal frac crew is onsite and pumping on this well. Intermediate annular pressure is 470 psi. Stage 52/63 has plug set at 12044, bottom perforation at 12033, and top perforation at 11892. Perforated with 5 guns, 4 shots, on 35 foot spacing. |
0728343938 | 2018-04-02 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the end of intermediate casing run. Patterson 584 drilled a 12.25 inch diameter open hole to a depth of 8947 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1625 feet. Wyoming Casing ran 8940 feet of 9.625 inch diameter casing, j-55, 40 lbs/foot. Last joint had to be washed down. Shoe track is 89 feet long. DV tool set at 4507 for two stage cement job. |
0832427883 | 2018-04-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 584 running a clean up cycle on the hole. They reached a total depth of 21,045 feet with an 8.5 inch diameter hole. 5.5 inch diameter production casing job is estimated to be early Wednesday morning, 4/11. |
1064815321 | 2018-02-02 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the mine string cement job. Falcon 26 drilled a 24 inch diameter open hole to a depth of 324 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming Casing ran 316 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot with 4 foot stick up. Shoe track is 24 feet long. Cement Baskets were set at 243 feet. Void/coal encountered at 256-275 feet. O-Tex was onsite with 630 sacks of class H cement. 70% excess ran in open hole. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. Cement displaced with 89 barrels of fresh water. 35 barrels of gel and 10 barrels of water pumped ahead of cement. No returns throughout job. Bumped plug and held with .5 barrel back to truck. Top out job required an additional 312 barrels of class H cement to reach surface. Top out was not witnessed as it was finished 19 hours after the plug bumped. |
1265859349 | 2018-06-28 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew onsite preparing to begin stimulations on this pad. This well has 63 stages. The stimulation should start today with this well. Intermediate annular pressure is 500 psi. 1st stage will be opening the 3 toe sleeves on this well from 20911 to 20818 feet. |
1319075678 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I found Universal frac crew on location. This well is on stage 28 out of 63. Plug is at 16244, bottom perforation at 16233, and top perforation is at 16092. Surface annular pressure is 650 and intermediate is 700. Currently fracking the 3H well. |
1515084860 | 2018-01-04 | Casing String Witnessed | No Violations | Pad address is 640 TOWNSHIP ROAD 107A DILLONVALE 43917. On the day of my inspection I witnessed Express had augured a 36 inch diameter hole to a depth of 100 feet. 100 feet of 30 inch diameter conductor casing was run. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. . Cement was displaced with 74 barrels of fresh water. 15 barrels of cement returned to surface. |
1517849042 | 2018-02-05 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1633 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 312 feet. Wyoming Casing ran 1627 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 2 foot stick up. Casing was centralized with 14 centralizers. Shoe track is 41 feet long. O-tex was onsite with 1370 sacks of class H cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 241 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 70 barrels of cement returned to surface, and floats held with 1 barrel back. |
1549019831 | 2018-08-06 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal Frac crew onsite. Stimulation has been completed on this pad. Wireline was in the 5H well setting a kill plug. First kill plug in this well is at 9657. Second kill plug has not been set but company man Brady estimates it will be approximately 150 feet above the first plug. |
1569388674 | 2018-08-29 | Production Wells | No Violations | On the day of my inspection I identified myslef to Construction Consultant Denny Bird. This pad has 3 wells on it. Activity onsite includes building of flowlines and setting production equipment. Wells do not have gauges on surface or intermediate annuli at this time. They are working on bring the above grade. Production equipment includes two 500 barrel steel tanks in their own containment, three GPUs,three line heaters and six sand traps. Wells do not have tubing and will produce through production casing. Flowlines are plumbed from both sides on the wellheads. |
1639977781 | 2018-07-03 | Completion Testing | No Violations | On the day of my inspection I found Universal frac crew rigged up to this well, as well as permits 20749 and 20750. They just completed stimulation on stage 6 of this well. Plug is at 20094. Perforations from 19949-20082. five guns with four shots each. Break down pressure was 9066 psi at 15 barrels per minute. 230000 pounds of sand was pumped. Surface annular pressure is 650 psi and intermediate pressure is 930 psi. |
1822713823 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew onsite. Currently the wireline and frac companies are shut down for maintenance. Stage 38/63 is next for this well. Surface annular pressure is 700 and intermeidate annular pressure is 530. |
1864101991 | 2018-08-22 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone 15 rig on location. ID to company man James Edwards. All of the frac plugs have been driled out of this well and they shut it in on 8-15. At that time the 5.5 inch diameter casing had 3700 psi on it. This well will be produced through the casing and they did not run tubing. At this time there is no production casing pressure gauge on the well. Surface annular pressure is 700 psi and intermediate annular pressure is 600 psi. |
357704460 | 2019-8-14 0:00: | PL | No Violations | 1.00 |
562468077 | 2018-8-1 0:00:0 | CT | No Violations | 1.00 |
832427883 | 2018-4-9 0:00:0 | DD | No Violations | 1.00 |
For data sources see[10]