Well ID: 34-081-20747
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001521
Farm/Lease Name: MINGO W CRC JF
License Status: Producing
License Date: 2017-12-08
Spud Date: 2017-12-19
Spud Drilling Contractor:
Final Drill Date: 2018-04-17
Well Total Depth: 19131.00 ft
Configuration: Horizontal
Latitude: 40.320000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-08 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/8/2017, Expired Date:12/8/2019 12:00:00 PM, Drilling unit acres:253.042, Proposed Well Type:OG, Proposed Well Class:EOUT
Construction Permit Expires 2018-12-08
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
18918 19026 0
9998 10149 0
9998 10149 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/14/2018 10/02/2018 9568 11,211,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (15%) UPP Acidizing Hydrochloric Acid 7647-01-0 15 0.00424441 4508.15
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0370871 39391.7
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 88.083 93,556,300.0
Scale Hib PE-18 UPP Scale Inhibitor Proprietary Scale Inhibitor Proprietary 30 0.0136362 14483.5
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.2715 11,971,900.0
K-Bac 1005 UPP Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000813416 863.96
Polyethylene glycol 7732-18-5 50 0.0070609 7499.65
Water 7732-18-5 44.3 0.00625596 6644.69
I-7L UPP Iron Control Ammonium glycolate 35249-89-9 20 0.000545576 579.477
Ethylene glycol 107-21-1 20 0.000545576 579.477
Hydroxyacetic acid 79-14-1 5 0.000136394 144.869
Unihib G UPP Acid inhibitor Butyl diglycol 112-34-5 75 0.000306886 325.956
Thiourea 62-56-6 1 0.00000409 4.346
Formaldehyde 50-00-0 1 0.00000409 4.346
Methanol 67-56-1 5 0.00002046 21.73
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000204591 217.304
Other Chemical(s) Listed Above See Trade Name(s) List Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00146141 1552.22
Polyethylene glycol 7732-18-5 50 0.0070609 7499.65
Formaldehyde 50-00-0 1 0.00000409 4.346
Thiourea 62-56-6 1 0.00000409 4.346
Methanol 67-56-1 5 0.00002046 21.73
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000204591 217.304
Hydroxyacetic acid 79-14-1 5 0.000136394 144.869
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000487137 517.407
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0121784 12935.2
Water 7732-18-5 55 0.0267925 28457.4
Sodium Chloride 7647-14-5 15 0.00730706 7761.1
Ammonium Chloride 12125-02-9 2 0.000974274 1034.81
Oleic Acid Diethanolamide 93-83-4 3 0.00146141 1552.22
Ethylene glycol 107-21-1 20 0.000545576 579.477
Water 7732-18-5 44.3 0.00625596 6644.69
Unislick CST-LA UPP Friction reducer Oleic Acid Diethanolamide 93-83-4 3 0.00146141 1552.22
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0121784 12935.2
Sodium Chloride 7647-14-5 15 0.00730706 7761.1
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00146141 1552.22
Water 7732-18-5 55 0.0267925 28457.4
Ammonium Chloride 12125-02-9 2 0.000974274 1034.81
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000487137 517.407
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0121784 12935.2

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 1005480 0 51
2019 ASCENT RESOURCES UTICA LLC 2081597 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 12220 51
2019 ASCENT RESOURCES UTICA LLC Brine 10918 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1354670533 2018-7-18 0:00: CT No Violations 1.00
-1735715266 2018-8-7 0:00:0 CT No Violations 1.00
-1793145944 2017-12-19 0:00 CS No Violations 11.20
-1870351042 2018-3-20 0:00: DD No Violations 1.00
-1981885787 2018-8-28 0:00: CT No Violations 1.00
-610156939 2018-4-5 0:00:0 DD No Violations 1.00
-864277597 2018-9-25 0:00: CT No Violations 1.00
-952213308 2018-9-12 0:00: CT No Violations 1.00
0048778300 2017-12-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found Falcon rig 26 onsite. Derrick is stood up but rig is not ready to drill. They will not spud until 1-2-18. This date they are setting the pad up.
0610156939 2018-04-05 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 was drilling their 12.25 inch diameter hole at a depth of 8000 feet. 9.625 inch diameter cement job anticipated for Friday 4/6.
0726055013 2018-04-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Xtreme 802 reached total depth, cemented production casing, and was skididng to the next well. Location is clean and well kept, with pad drains shut.
0731886701 2018-10-22 Completion Testing No Violations On the day of my inspection I found Deep Well snub #11 onsite. I identified myself to company man James Edwards. This well has had frac plugs drilled out and is awaiting flowback. Surface annular pressure is 500 and intermediate is 450. Production casing pressure was 3100 after drill out. James anticipates moving off of this pad late in the week.
0864277597 2018-09-25 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men David and Gonzo. This well is stimulated and awaiting drill out operations. Surface annular pressure is 0 and intermediate is 750.
0865687641 2018-09-18 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. Frac is completed on this well. Intermediate annualr pressure is 750 psi. Surface gauge not viewed as there was pressure on the lines for frac.
0924179235 2018-07-26 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. No frac crew is onsite yet. Miscellaneous equipment onsite such as aboveground storage tank and several frac tanks. Surface annular pressure is 0 and intermediate annular is 450.
0952213308 2018-09-12 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company man Gonzo. This well has been stimulated and kill plugs were set at 9402 and 9545. Stimulation was finsihed up on 9-11. Surface annular pressure is 0 and intermediate annular pressure is 650.
1026053240 2018-02-23 Preliminary Restoration No Violations On the day of my inspection I found this pad containg four labeled wells. Wells have surface casing set in them and are awaiting a larger rig to finish. The pad is fenced, gated, and locked. All disturbed area is heavily mulched and doing well with all the rain the area has received over the past 2 weeks. Leas road also in good shape. Pad drains are shut. Site meets requirements of ORC 1509.072A for preliminary restoration.
1157257885 2018-10-04 Completion Testing No Violations On the day of my inspection I identified myself to company man Justin. Frac crew has moved off of location and they are cleaning up the containment in preperation for drill out. 2 kill plugs set in well at 9400 and 9545. Surface annular pressure is 0 and intermediate annular pressure is 800.
1354670533 2018-07-18 Completion Testing No Violations On the day of my inspection I met with Company man Duke Landry. Frack stacks are on wells, an aboveground storage tank, and two frac tanks are onsite. Universal will be coming to this location after finishing the Elite pad. Surface annular pressure is 0 and the intermediate annular pressure is 475.
1520880426 2018-03-12 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Xtreme rig 802 is moving onto location. Compnay man Heath believes they wont be spudding for probably 2 weeks.
1523298642 2018-04-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found Xtreme 802 drilling an 8.5 inch diameter hole at a depth of 10142 feet. Kick off point for their curve was 8924 and it was landed at 10023.
1586959492 2018-08-22 Completion Testing No Violations On the day of my inspection I witnessed Universal has a frac crew on location. ID to company man Chris Telford. This well has not had a stage done on it yet. They are waiting until to rig is off of the neighboring gordon pad. Surface annular pressure is 0 and intermediate annular pressure is 600.
1735715266 2018-08-07 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew moving onto location. ID to Company Man Bub Ruckert. Mr. Ruckert believes they will likely start stimulation operations on Saturday. There is an aboveground storage tank onsite. Not all equipment is onsite this date. Surface annular pressure is 0 and intermediate annular pressure is 450.
1793145944 2017-12-19 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 400 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 70.5 barrels of water, leaving 15 feet of cement in the casing. Approximately 13 barrels of cement returned to surface and remained static. Ascent will top out with grout to achieve the 18 inch floor in the cellar they need after the cement sets up.
1824485985 2018-08-14 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. ID to company men Brady and Wendall. They are beginning stage 1 frac of the 6H well during my inspection. This well has no been stimulated yet. Surface annular pressure is 0 and intermediate annular pressure is 280.
1870351042 2018-03-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 802 is onsite rigging up. Company man John Wilson believes they should start drilling in the next few days. Pad has already had top holes done.
1981885787 2018-08-28 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myslef to company men Wendall Brady and Chris Telford. Well has not been stimulated.Well has 52 stages. Stage 1 perforations will be at 19026 and top perforations at 18918. Surface annular pressure is 0 and intermediate annular pressure is 300.
48778300 2017-12-27 0:00 DD No Violations 1.00
628629466 2019-12-10 0:00 UL No Violations 1.00
726055013 2018-4-17 0:00: DD No Violations 1.00
731886701 2018-10-22 0:00 CT No Violations 1.00
865687641 2018-9-18 0:00: CT No Violations 1.00
924179235 2018-7-26 0:00: CT No Violations 1.00

For data sources see[9]