34-081-20739

Well Details

Well ID: 34-081-20739
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001515
Farm/Lease Name: NOLAN S CRC JF
License Status: Producing
License Date: 2017-10-13
Spud Date: 2017-10-31
Spud Drilling Contractor:
Final Drill Date: 2018-01-03
Well Total Depth: 18530.00 ft
Configuration: Horizontal
Latitude: 40.300000
Longitude: -80.750000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-13 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:631.959, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2018-01-03
Correction to Well 2018-03-30 CORRECTION TO TARGET AND TAKE-POINT INFORMATION FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2018-10-13
Completion Report Received 2018-10-26
Record Last Modified 2018-11-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-31 10193 10334 0
2018-10-31 18283 18384 0
18283 18384 0
10193 10334 0
10193 10334 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/15/2018 07/15/2018 9592 10,270,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.49814 1,462,410.0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.6427 85,552,000.0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
GEL 1100 Mountain Supply & Service Additive Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
Acrylic acid 79-10-7 0.01 0.00000237 3
Fatty acids, tall oil Proprietary 30 0.00032338 316
Crystalline silica, quartz 14808-60-7 100 10.82 10,561,900.0
Methanol 67-56-1 60 0.000678194 663
Emulsifier 9002-92-0 10 0.00003284 33
Ethylene glycol 107-21-1 60 0.0142272 13888
Sodium polyacrylate 9003-04-7 1 0.00023712 232
Sodium persulfate 7775-27-1 100 0.00001024 10
Citric acid 77-92-9 60 0.00450812 4401
Polymer Blend Proprietary 68 0.000223335 219
Inorganic salt Proprietary 30 0.0161284 15744
Modified thiourea polymer Proprietary 30 0.00032338 316
Phosphoric acid 7664-38-2 0.1 0.00002245 22
Ethoxylated alcohols Proprietary 30 0.00032338 316
Propargyl alcohol 107-19-7 10 0.000107793 106
Telmer Proprietary 10 0.0023712 2315
Ethanol 64-17-5 1 0.000224526 220
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00112263 1096
Sodium sulfate 7757-82-6 0.1 0.00000001 1
Olefins Proprietary 5 0.000129352 128
Acrylamide acrylate polymer Proprietary 30 0.0161284 15744
Hydroteated light petroleum distillate 64742-47-8 30 0.0161284 15744
Hydrochloric acid 7647-01-0 7.5 0.107139 104583
pH Buffer 8055-55-8 15 0.00004926 49
Glutaraldehyde 111-30-8 30 0.00673578 6576

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-06-27 H2O 15 243089 Gal 248810 Halliburton STAGE 1/47

STAGES 2-46 SEE IMAGES

2018-07-12 H2O 15 215180 Gal 226465 Halliburton DTSGE 47/47

STAGES 2-46 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 2899813 0 129
2019 ASCENT RESOURCES UTICA LLC 1333515 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 20997 129
2019 ASCENT RESOURCES UTICA LLC Brine 6376 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1152485951 2017-12-12 0:00 DD No Violations 2.30
-1300810154 2018-4-17 0:00: CT No Violations 1.00
-1525757704 2018-7-12 0:00: CT No Violations 1.00
-1894857213 2018-7-18 0:00: CT No Violations 1.00
-1910230924 2018-8-1 0:00:0 CT No Violations 1.00
-1918224241 2019-12-10 0:00 UL No Violations 1.00
-35615811 2017-10-31 0:00 CS No Violations 2.50
-773490009 2018-7-26 0:00: CT No Violations 1.00
0035615811 2017-10-31 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 111 feet and ran 111 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 390 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 80 barrels of water, leaving 13 feet of cement in the casing. Good cement returned to surface and remained static. Approximately 20 barrels of cement returned to surface, Ascent left approximately 18 inches of cement in the cellar as a seal.
0773490009 2018-07-26 Completion Testing No Violations On the day of my inspection I witnessed Deep Well Snub 11 onsite. Rig is drilling out on the 2H well. This well has been drilled out. Surface annular pressure is 450 and intermediate annular pressure is 650.
1152485951 2017-12-12 Drill / Deepen / Reopen No Violations On the date of my inspection I found a well maintained lease road with an unlocked gate. The pad is surrounded by an earthen dike with healthy vegetation and a fence with an unlocked gate. Ascent is currently rigging up Patterson Drilling rig 795 on this well. The company man expects that they should be ready to spud on 12/16/17.
1300810154 2018-04-17 Completion Testing No Violations On the day of my inspection I found Weir and Cameron on location putting on the tubing heads and valves respectively. The pad has not been stimulated and they are preparing for Halliburton frack crew.
1325367512 2018-06-15 Completion Testing No Violations On the day of my inspection I witnessed a halliburton frac crew was onsite. Surface annular pressure is 450 psi and intermediate pressure is 550 psi. This well is not rigged up for fracking yet. Currently rigged up on 1h, 2h, and 3h wells.
1514382599 2018-01-03 Drill / Deepen / Reopen No Violations On the day of my inspection I found Patterson 795 drilling the 8.5 inch diameter hole section at 10,139 feet. Company man Russ White stated that the wellbore is not making any fluid and there is currently no flare burning. Containment is functioning as designed. Air temperature is 4 degrees and any water on ground is frozen. Pad drains are shut. 9.625 inch diameter casing cemented on 12-25.
1514904876 2018-01-02 Casing String Witnessed No Violations On the day of my inspection I witnessed Patterson 795 had a drilled an 8.5 inch diameter hole to a depth of 18530. Wyoming casing ran 18535 feet of 5.5 inch diameter production casing, j-55, #/ft with a 5 foot stick up. Halliburton onsite with 3265 sacks of lead cement, with a yield of 1.09 and weight of 15.0. 10% excess ran. Bumped plug, floats held, no cement to surface.
1525757704 2018-07-12 Completion Testing No Violations On the day of my inspection I witnessed Halliburton was rigged up to this well. They started the last stage, 47/47 but the agiator is bent and they cannot pump sand. Top perforation is at 10193 and bottom perforation is at 10334. Perforated with 5 guns having 4 shots each on 35 foot spacing. Surface annular pressure is 475 and intermediate annular pressure is 565. Well is currently shut in until they get agitator fixed and can resume frac. Breakdown pressure was 9305 at 30 barrels per minute.
1678173955 2018-06-29 Completion Testing No Violations On the day of my inspection wireline was coming out of the well after shooting perforations for stage 4. Frac plug is at 17913 feet. Halliburton is onsite but blender broke down and they are waiting on repairs. Intermediate annular pressure is 711 psi.
1809293653 2018-10-26 Preliminary Restoration No Violations On the day of my inspection I witnessed this contain contains five properly labeled producting wells. Wells do not have tubing in them and are produced on natural reservoir pressure through the 5.5 inch diameter casing. All wells on the pad are producing from each side of the wellhead. Production equipment includes 10 GPUs, 10 sand seperators, 2 500 barrel steel tanks in their own containment, and 1 combustor. Surface annular pressure is 24 and intermediate annular pressure is 366. Site meets requirements of OAC 1509.072A for preliminary restoration.
1894857213 2018-07-18 Completion Testing No Violations On the day of my inspection I found Deep Well Snub 11 rig moving onto location. Pad has been fracked and rig will drill out plugs. Surface annular pressure is 0 and intermediate annular pressure is 600.
1910230924 2018-08-01 Completion Testing No Violations On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man David Rapattoni. Deep Well Snub 11 rig onsite and set up on the 3H well. Surface annular pressure is 400 and intermediate annular pressure is 650 psi. Drill out has been completed on this well.
1933074215 2020-4-20 0:00: PW No Violations 1.00

For data sources see[10]