34-081-20709

Well Details

Well ID: 34-081-20709
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001490
Farm/Lease Name: FERGUSON SW SMF JF
License Status: Drilling
License Date: 2017-02-17
Spud Date: 2017-05-22
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.230000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/17/2017, Expired Date:2/17/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Record Last Modified 2018-05-17 ONLY CONDUCTOR SET AS OF MARCH 2018
Construction Permit Expires 2019-02-17 ONLY CONDUCTOR SET AS OF MARCH 2018

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-25044676 2018-3-14 0:00: DD No Violations 1.00
0025044676 2018-03-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found this pad to contain 3 wells. This well has only the conductor set and has not been drilled any deeper according to previous inspection reports. Production equipment includes two line heaters, two gas production units, four sand seperators, and two 500 barrel steel tanks. There is pipeline activity next to the pad. Per ORC 1509.072A this permit is not eligible for a preliminary restoration until it is drilled to total depth. The pad is stable and vegetated.
1212326459 2017-08-22 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 292 moving onto the location. Currently only the living quarters, frac tanks, and drill pipe have been staged on the pad. The pad is surrounded by healthy vegetation and the pad drains are in the closed position. The rig will be rigging up on permit 34-081-2-0711 first. This well currently only has a conductor set, Ascent did not drill the surface portion of this well when they drilled the other 2. As of right now, they do not plan to drill this well until a later date.
1393347941 2017-05-22 Casing String Witnessed No Violations Upon arrival on location I found the crew had drilled a 36 inch diameter hole and installed 30 inch diameter casing to a depth of 100 feet. Circulation was established and 76 bbl. of cement was displaced with 70 bbl. of fresh water leaving around 10 feet of cement inside of the casing. 29 bbl. of good cement was circulated to surface.
1488995933 2017-03-08 Drill / Deepen / Reopen No Violations On the date of my inspection I found the pad and access road for this permit number to be under construction. The gravel base has been placed on the pad is currently being added to the access road.