X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20704

Well Details

Well ID: 34-081-20704
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Warren Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001463
Farm/Lease Name: HARR W MTP JF
License Status: Producing
License Date: 2017-04-14
Spud Date: 2017-03-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2017-08-22
Well Total Depth: 20923.00 ft
Configuration: Horizontal
Latitude: 40.160000
Longitude: -80.760000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-14 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/14/2017, Expired Date:2/14/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-04-14 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/14/2017, Expired Date:4/14/2019 12:00:00 PM, Drilling unit acres:506.588, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-08-22
Completion Report Received 2018-02-27
Record Last Modified 2018-03-28
Correction to Well 2018-03-30 UPDATE TAKE/TARGET PER AS-DRILLED PLAT
Construction Permit Expires 2019-04-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-03-19 9200 30
2018-03-19 20652 20706 18
9200 30
20652 20706 18
9200 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/02/2017 12/08/2017 9200 5,404,100.0 43987

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Supplied by Operator Base Fluid Water 7732-18-5 100 90.1849 45,070,200.0
SI-680 FTSI Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
Fatty amino compound salt Proprietary 30 0.000180209 0
Sodium Chloride 7647-14-5 5 0.00131928 0
Ammonium Chloride 12125-02-9 1 0.000428006 0
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0107002 0
Isotridecanol, ethoxylated 9043-30-5 2 0.00000625 0
Oleic Acid Diethanolamide 93-83-4 2 0.000856012 0
Ethoxylated Alcohol Proprietary 10 0.00006007 0
Suspending Agent 1302-78-9 5 0.00001563 0
Copolymer of 2-Propenamide 69418-26-4 30 0.0128402 0
Alkoxylated fatty amine Proprietary 5 0.00003003 0
Methanol 67-56-1 0.1 0.00000060 0
Silica, Quartz 14808-60-7 100 0.783343 0
Sodium Hydroxide 1310-73-2 23 0.00379226 0
Ammonium Persulfate 7727-54-0 100 0.00003746 0
ORGANICPHOSPHONIC ACIDS SALTS Trade Secret 20 0.00527711 0
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,

3, 5-thiadiazine-2-thione.

533-74-4 24 0.00395714 0
Hydrogen Chloride 7647-01-0 7.5 0.050686 0
Methyl Alcohol 67-56-1 15 0.00395783 0
Petroleum Distillate 64742-47-8 55 0.000171949 0
Guar gum 9000-30-0 55 0.000171949 0
Silica, Quartz 14808-60-7 100 8.26547 0
Ethoxylated fatty alcohol Proprietary 30 0.000180209 0
Isopropanol 67-63-0 60 0.000360418 0
Quartz 14808-60-7 4 0.00001251 0
Citric Acid 77-92-9 30 0.00115536 0
Raffinates, Sorption Process 64741-85-1 55 0.000171949 0
Aromatic aldehyde Proprietary 8 0.00004806 0
Acetic acid 64-19-7 40 0.00154048 0
Alcohol Ethoxylate Surfactants Trade Secret 2 0.000856012 0
CI-150 FTSI Acid Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
0.1%-7.5% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
APB-1 FTSI Gel breaker Listed Below Green Line Listed Below 0 0 0
100 Mesh Sand FTSI Proppant Listed Below Green Line Listed Below 0 0 0
FRW-920 FTSI Friction Reducer - Zwitter ionic Listed Below Green Line Listed Below 0 0 0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 0.625128 0
Water 7732-18-5 50 0.0214003 0
Water 7732-18-5 30 0.000180209 0
Water 7732-18-5 45 0.00173304 0
Water 7732-18-5 80 0.0211084 0
Water 7732-18-5 55 0.00906846 0
ICI-3240 FTSI Biocide Listed Below Green Line Listed Below 0 0 0
40/70 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
FE-200A FTSI Iron Control Listed Below Green Line Listed Below 0 0 0
HVG-1 4.0 FTSI Water gelling agent Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-19 H2O 15 7028 Bbl 321199 BJ Services Company STAGE 1/60

STAGES 2-59 SEE IMAGES

2017-12-09 H2O 8 6231 Bbl 350879 Frac Tech Services STAGE 60 OF 60

STAGES 2-59 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 6723735 0 356
2019 ASCENT RESOURCES UTICA LLC 675387 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 37728 356
2019 ASCENT RESOURCES UTICA LLC Brine 562 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2112417943 2017-3-8 0:00:0 DD No Violations 0.50
-249933230 2017-8-15 0:00: DD No Violations 2.50
-252153153 2018-3-14 0:00: PL No Violations 1.00
-927121156 2017-8-3 0:00:0 DD No Violations 2.50
0249933230 2017-08-15 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 714 drilling the production string of this well at 18267 feet. Ascent expects to reach their total depth by 8/17/17. All of the chemicals on site are within containment. Any fuel tanks or light generators are within separate containment. I did not see any visible tears or punctures in the containment. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
0252153153 2018-03-14 Preliminary Restoration No Violations On the day of my inspection I found this pad to contain 3 properly labeled producing wells. Well is equipped with christmas tree style wellhead. Gauges on wellhead read 700 psi surface, 1300 psi intermediate, 3800 psi tubing, and 2200 production. Production equipment includes three line heaters, three gas production units, two 500 barrel steel tanks, and 6 sand seperators. Pad is stable and vegetated. Site meets requirements of ORC 1509.072A for preliminary restoration.
0345957758 2017-10-16 Completion Testing No Violations On the date of my inspection I found a BJ Services crew rigging up on all three wells on this pad in preparation for hydraulic fracturing operations. They are currently rigging up the frac stacks on the wells and moving in pump trucks. Allied Horizontal wireline services it the wireline contractor. Ascent anticipates operations to begin on 10/18/17 if setup continues to go smoothly. The pad is surrounded by a fenced earthen berm that is covered with healthy vegetation. The pad drain valves are in the closed position. The hillside that had been scorched by a large flare during the drilling process has healthy vegetation growing on it again.
0873732410 2017-03-13 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Rocky Mountain Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex pumped 400 sacks of class A cement, 1.2 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.75 pound per sack flow seal. I witnessed approximately 15 barrels of good cement return to surface. A vac truck was used to remove the excess cement, leaving approximately 18 inches of good cement in the cellar.
0927121156 2017-08-03 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 714 drilling the intermediate string of this well at 8500 feet toward approximately 9250 feet. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. A metal cross over has been placed on the area near the mixing house to prevent the containment from being compressed. The pad drain valves are in the closed position and do not appear to be leaking.
1135285449 2017-04-20 Casing String Witnessed No Violations Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1720 feet. Wyoming Casing set 1706 feet of 13.375 inch diameter 61# casing through 316 feet of 18.675 inch diameter 87.5# mine string. 13 centralizers were ran. OTEX onsite to cement with 1470 sacks of class H cement with a yield of 1.2 and weight of 15.6 pounds per gallon. Displacement of 246.6 barrel water will leave an 85.25 foot shoe track. 50% excess cement is calculated for open hole. Hole was loaded prior to starting job and 80 barrel cement returns to surface. Floats held.
1492095150 2017-04-13 Casing String Witnessed No Violations Onsite with Inspector Scott Scheiner to witness a mine string. See his report dated this date for further information.
1492431845 2017-04-13 Casing String Witnessed No Violations I am on site today to witness the re-grouting of the backside of the 18.625 inch casing. It was determined that before the top out job on 4/12, approximately 30 barrels of cement mixed with sugar entered the annulus through the cellar when O-Tex washed up from the incomplete cement job. When Falcon 26 went to cut off the casing to begin to drill out the cement, they noticed the backside had no set up. They tagged hard cement at approximately 100 feet below the bad cement. Ascent arranged for O-Tex to pump 200 sacks of class H, 15.6 pounds per gallon, 1.2 yield cement through 100 feet of 1 inch tremie pipe to displace the contaminated cement. I witnessed approximately 20 barrels of cement circulated to surface.
1510066900 2017-11-07 Completion Testing No Violations On the date of my inspection I found a BJ Services crew rigged up on all 3 wells on the pad for hydraulic fracturing operations. While I was on site I witness BJ Services pump the frac job for stage 33 of 60 on this well. They are currently on stage 32 of 49 on permit 34-081-2-0702, and stage 32 of 56 on permit 34-081-2-0703. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position.
1645044495 2017-04-14 Drill / Deepen / Reopen No Violations On the day of my inspection I viewed a hydrostatic test on the recently set mine string casing. Mine string casing is 18.625 inch diameter. The fluid level dropped approximately 14 inches in height during the 30 minutes that I watched it.
1767899461 2017-09-20 Completion Testing No Violations On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 wells that have been drilled. The wellheads are surrounded by cement barriers. Currently there are 7 frac tanks and the walls for an above ground storage tank being stored onsite. Ascent plans to begin frac operations on these wells within the next month. The hillside on the east side of the pad where the ground bad been scorched by a large flare during the drilling process has healthy vegetation now growing on it. The chain link fence on the eastern side of the pad has partially bent over towards the pad. This occurred while the drilling rig was onsite due fastening containment onto the fence to prevent overspray from leaving the pad.
1998030613 2017-04-12 Casing String Witnessed No Violations I am on site today to witness the running and cementing of 18.625 inch mine casing. Falcon Drilling rig 26 drilled a 24 inch diameter hole to a depth of 321 feet and set 318 feet of 18.625 inch, 87.5 pound per foot casing. O-Tex pumped 660 sacks of class H cement, 1.2 yield, 15.6 pound per gallon, 2 percent Calcium Chloride. A coal seam was identified from 262 feet to 272 feet and two baskets were set at 253 feet and 249 feet. The cement locked up 110 barrels into the job. O-Tex could not get the cement to move had to shut down. Approximately 11 barrels was pumped into the annulus through the casing before the cement locked up which is approximately 49 feet on the backside of the casing. Casing was set 46 feet below the mine which would indicate that the annulus below the mine has been cemented. O-Tex pumped 6 barrels of class H, 1.2 yield, 15.6 pound per gallon cement mixed with calcium chloride and baro-seal through approximately 240 feet of tremie pipe on the backside of the 18.625 inch casing to set the basket. The cement levels kept rising. O-Tex pumped 200 sacks until cement returned to surface and remained static.
2112417943 2017-03-08 Drill / Deepen / Reopen No Violations On the date of my inspection I found Rocky Mountain Drilling setting the cellars on the pad for this permit number. Ascent is planning to move a conductor rig onto the site and begin drilling by 3/10.
345957758 2017-10-16 0:00 CT No Violations 1.00
873732410 2017-3-13 0:00: CS No Violations 4.50

For data sources see[10]

References