X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20693

Well Details

Well ID: 34-081-20693
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001478
Farm/Lease Name: STONE NE CRC JF
License Status: Producing
License Date: 2017-07-26
Spud Date: 2017-04-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-08-12
Well Total Depth: 19570.00 ft
Configuration: Horizontal
Latitude: 40.340000
Longitude: -80.690000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-16 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/16/2017, Expired Date:2/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-07-26 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:7/26/2017, Expired Date:7/26/2019 12:00:00 PM, Drilling unit acres:501.275, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-08-12
Correction to Well 2018-03-30 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Construction Permit Expires 2018-07-26
Completion Report Received 2019-01-17
Record Last Modified 2019-01-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-01-23 9742 9883 0
2019-01-23 19295 19395 0
19295 19395 0
9742 9883 0
9742 9883 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/06/2018 03/07/2018 9200 19,742,400.0 194810

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-150 FTSI Acid Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
APB-1 FTSI Gel breaker Listed Below Green Line Listed Below 0 0 0
0.1%-7.5% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
HVG-1 4.0 FTSI Water gelling agent Listed Below Green Line Listed Below 0 0 0
30/50 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 89.096 164,652,000.0
ICI-3240 FTSI Biocide Listed Below Green Line Listed Below 0 0 0
Silica, Quartz 14808-60-7 100 1.45699 0
Hydrogen Chloride 7647-01-0 7.5 0.0569359 0
Methanol 67-56-1 90 0.00062327 0
Citric Acid 77-92-9 30 0.00129782 0
Petroleum Distillate 64742-47-8 55 0.00220613 0
Propargyl Alcohol 107-19-7 5 0.00003463 0
Isotridecanol, ethoxylated 9043-30-5 2 0.00008022 0
Quartz 14808-60-7 4 0.000160446 0
N-olefins Proprietary 3 0.00002078 0
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0169813 0
ORGANICPHOSPHONIC ACIDS SALTS Trade Secret 20 0.00713626 0
Copolymer of 2-Propenamide 69418-26-4 30 0.0203775 0
Guar gum 9000-30-0 55 0.00220613 0
Sodium Hydroxide 1310-73-2 23 0.0113337 0
Oleic Acid Diethanolamide 93-83-4 2 0.0013585 0
Silica, Quartz 14808-60-7 100 6.62501 0
Hydrocarbon Proprietary 3 0.00002078 0
Alcohol Ethoxylate Surfactants Trade Secret 2 0.0013585 0
Silica, Quartz 14808-60-7 100 1.90045 0
Alcohol Ethoxylate Surfactants Proprietary 10 0.00006925 0
Fatty Acids, Tall Oil 61790-12-3 10 0.00006925 0
Acetic acid 64-19-7 40 0.00173043 0
Methyl Alcohol 67-56-1 15 0.00535219 0
Sodium Chloride 7647-14-5 5 0.00178406 0
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,

3, 5-thiadiazine-2-thione.

533-74-4 24 0.0118264 0
Thiourea-formaldehyde Copolymer 68527-49-1 10 0.00006925 0
Raffinates, Sorption Process 64741-85-1 55 0.00220613 0
Ammonium Chloride 12125-02-9 1 0.00067925 0
Suspending Agent 1302-78-9 5 0.000200558 0
Ammonium Persulfate 7727-54-0 100 0.000450773 0
FE-200A FTSI Iron Control Listed Below Green Line Listed Below 0 0 0
40/70 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
100 Mesh Sand FTSI Proppant Listed Below Green Line Listed Below 0 0 0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 55 0.0271022 0
Water 7732-18-5 50 0.0339625 0
Water 7732-18-5 45 0.00194673 0
Water 7732-18-5 92.5 0.702209 0
Water 7732-18-5 80 0.028545 0
FRW-920 FTSI Friction Reducer - Zwitter ionic Listed Below Green Line Listed Below 0 0 0
SI-680 FTSI Scale Inhibitor Listed Below Green Line Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-02 H2O 15 6969 Bbl 351728 Frac Tech Services STAGE 1/55

STAGES 2-54 SEE IMAGES

2018-03-08 H2O 15 8916 Bbl 351440 Frac Tech Services STAGE 1/55

STAGES 2-54 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 4297160 0 256
2019 ASCENT RESOURCES UTICA LLC 752463 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 34042 256
2019 ASCENT RESOURCES UTICA LLC Brine 1842 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-509241456 2019-7-22 0:00: UL No Violations 1.00
-52284820 2017-12-13 0:00 CT No Violations 0.30
-855741901 2017-8-2 0:00:0 DD No Violations 2.00
-885647321 2020-1-15 0:00: PW No Violations 1.00
0052284820 2017-12-13 Completion Testing No Violations On the date of my inspection I found a well maintained access road with a locked gate. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. There are 4 recently drilled wells on the pad surrounded by concrete barriers. The wells have not been hydraulically fractured yet. Containment for frac operations has been placed around the wellheads. There are currently 8 frac tanks, a trailer, a forklift, and walls for an above ground storage tank onsite. The two 500 barrel tanks for production have been installed and are within a metal dike.
0217867445 2018-02-23 Preliminary Restoration No Violations On the day of my inspection I witnessed Fractech was onsite under direction of Ascent Company man Larry Jennings. This pad is splitting water with the Giusto pad, and the other pad is currently receiving water for frac. Stage 35 is finished. Received call from Mr. Niece (ODOT aviation) on 2/21 in regards to crane not having a permit from ODOT. Pad is within 10000 feet of jefferson airpark and ODOT has permits for erections that close to airport. A temporary light was installed on crane. Permanent light is supposed to arrive on location today or tomorrow. Outslope of pad is vegetated and stable. Lease road is stable. Site meets requirements of ORC 1509.072A for preliminary restoration.
0855741901 2017-08-02 Drill / Deepen / Reopen No Violations On the date of my inspection I found Patterson drilling rig 577 drilling the intermediate section of this well at approximately 8480 feet. Ascent anticipates reaching their total depth for this string today and running casing this afternoon. During my inspection I found multiple punctures and tears in the containment near the catwalk. I also found 4 pallets of chemicals out of containment. I spoke with the Ascent company man about the issues and he indicated that he would call the containment contractor out to repair the damaged areas today and would have the chemicals moved immediately. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking.
1496393037 2017-06-02 Casing String Witnessed No Violations I am on site to witness the running and cementing of 13.375 inch surface casing. Falcon Rig 26 drilled a 17.5 inch diameter hole to a depth of 1415 feet and set 1404 feet of 13.375 inch 61 pound per foot casing. O-Tex established circulation with fresh water, pumped 1510 sacks of class A cement, 1.19 yield and 15.6 pound per gallon, 2 percent calcium chloride, 0.25 pound cello flake per sack. Approximately 77 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1150 psi for 5 minutes.
217867445 2018-2-23 0:00: PL No Violations 1.00

For data sources see[10]

References