34-081-20594

Well Details

Well ID: 34-081-20594
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001450
Farm/Lease Name: PIERGALLINI SMF JF
License Status: Producing
License Date: 2017-03-03
Spud Date: 2017-03-17
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2017-06-26
Well Total Depth: 17820.00 ft
Configuration: Horizontal
Latitude: 40.270000
Longitude: -80.810000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-08-31 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/31/2015, Expired Date:8/30/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2016-09-02 CHANGE TO LEASE NAME AND WELL NUMBER PER OWNER REQUEST.
APP 2017-02-24 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/24/2017, Expired Date:2/24/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-03 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/3/2017, Expired Date:3/3/2019 12:00:00 PM, Drilling unit acres:632.473, Proposed Well Type:OG, Proposed Well Class:EOUT
Original Spud 2017-04-04
Reached Total Depth 2017-06-26
Completion Report Received 2018-02-26
Record Last Modified 2018-03-09
Construction Permit Expires 2019-03-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-03-08 9793 9934 6
2018-03-08 17533 17639 6
17533 17639 6
9793 9934 6
9793 9934 6

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/08/2017 07/29/2017 9414 9,923,840.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.206 10,621,000.0
Other Chemical(s) Listed Above See Trade Name(s) List dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00026974 255.657
Citric acid 77-92-9 40 0.00273385 2591.12
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00126972 1203.43
didecyldimethylammonium chloride 7173-51-5 8 0.00167184 1584.56
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00013487 127.829
quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 5.3 0.00111386 1055.71
Ethoxylated alcohol 68131-39-5 10 0.00013487 127.829
Water 7732-18-5 85 0 0
copolymer of 2-propenamide Proprietary 10 0.0063486 6017.16
oleic acid diethanolamide 93-83-4 2 0.00126972 1203.43
Water 7732-18-5 92.5 1.17606 1,114,660.0
Cinnamaldehyde 104-55-2 10 0.00013487 127.829
propan-2-ol 67-63-0 5 0.00006743 63.914
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00645649 6119.42
formic acid 64-18-6 10 0.00013487 127.829
KWG-111LS Keane Gel Guar gum 9000-30-0 55 0.00645649 6119.42
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00645649 6119.42
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Water 7732-18-5 92.5 1.17606 1,114,660.0
Hydrochloric Acid 7647-01-0 7.5 0.0953565 90378.2
KSI-19 Keane Scale Inhibitor Methanol 67-56-1 30 0.0125721 11915.8
MBC-516 Keane Biocide quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 5.3 0.00111386 1055.71
glutaral 111-30-8 26.7 0.00560077 5308.37
didecyldimethylammonium chloride 7173-51-5 8 0.00167184 1584.56
KAI-13 Keane Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00013487 127.829
Cinnamaldehyde 104-55-2 10 0.00013487 127.829
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00013487 127.829
ethanediol 107-21-1 40 0.000539479 511.315
formic acid 64-18-6 10 0.00013487 127.829
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.00026974 255.657
propan-2-ol 67-63-0 5 0.00006743 63.914
KWBO-2 Keane Breaker Sodium persulfate 7775-27-1 99 0.000154591 146.52
KFEAC-30 Keane Iron Control Citric acid 77-92-9 40 0.00273385 2591.12
acetic acid 64-19-7 60 0.00410077 3886.68
KFR-23 Keane Friction Reducer copolymer of 2-propenamide Proprietary 10 0.0063486 6017.16
oleic acid diethanolamide 93-83-4 2 0.00126972 1203.43
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0285687 27077.2
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00126972 1203.43
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 87.3761 82,814,500.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-07-08 H2O 8 11277 Bbl 332585 Keane Frac STAGE 1/45

STAGES 2-44 SEE IMAGES

2017-07-29 H2O 8 7399 Bbl 236147 Keane Frac STAGE 45/45

STAGES 2-44 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC 1982953 0 108
2018 ASCENT RESOURCES UTICA LLC 4084991 0 352
2019 ASCENT RESOURCES UTICA LLC 621351 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC Brine 10685 108
2018 ASCENT RESOURCES UTICA LLC Brine 28837 352
2019 ASCENT RESOURCES UTICA LLC Brine 2614 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2057951866 2017-9-15 0:00: PW No Violations 0.90
-560790394 2017-8-24 0:00: CT No Violations 0.30
-630783103 2017-3-17 0:00: CS No Violations 2.50
-902912154 2017-4-21 0:00: DD No Violations 1.50
0072106415 2017-07-14 Completion Testing No Violations On the date of my inspection I found Keane Frac in the process of hydraulically fracturing all three wells on this pad. I spoke with the Ascent company man who indicated that the operations were going smoothly and that they have completed stage 12 of 46 frac stages for this well. He indicated that they should be on this location for approximately 2 more weeks. All hazardous materials are within double containment which is in good condition. The containment around the hydrochloric acid tanker has a few punctures that the company man said he would have fixed as soon as possible. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. The company man indicated that any water that accumulates within the containment is removed using a vac truck then transferred into the water holding tank on site and used for the fracturing process.
0560790394 2017-08-24 Completion Testing No Violations On the date of my inspection I found SEI Oilfield Services onsite assembling the production equipment for this pad. They are currently assembling the flowlines and gas production units. This pad has 3 wells that are currently shut in, awaiting flowback operations. I could not find an Ascent representative onsite to determine when flowback operations would begin. The pad is surrounded by healthy vegetation and the pad drains are in the closed position and do not appear to be leaking.
0630783103 2017-03-17 Casing String Witnessed No Violations I am on site today to witness the cementing of 24 inch conductor casing. Precision Drilling drilled a 30 inch diameter hole to a depth of 125 feet and ran 125 feet of 24 inch diameter 96 pound per foot conductor casing. A 10 foot mine void was found from 70 to 80 feet, a basket was ran at approximately 55 feet. O-Tex pumped 230 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.25 pound per sack flow seal to set the shoe. 1 bag of calcium chloride, 1 bag of cotton seed hulls, and 1 bag of gravel were poured down the backside of the 24 inch casing into the basket. O-Tex ran 10 feet of hose down the hole on one side of the casing to pump cement and ran another hose down the other side to pour approximately 10 gallons of Sodium Silicate to flash set the cement in the basket. O-Tex pumped approximately 130 sacks of cement until it returned to within 10 feet of surface and remained static. Ascent will come back and top out with ready-mix.
0902912154 2017-04-21 Drill / Deepen / Reopen No Violations On the date of my inspection I found Pioneer 77 moving onto the pad. Ascent is expecting to being drilling the intermediate section of this permit number during the week of 4/24/17. Currently only the living quarters have been staged on site.
0934759848 2018-01-10 Preliminary Restoration No Violations On the day of my inspection I found this pad equipped with 3 producing wells. Production equipment includes three gas production units, three vertical sand seperators, and two 400 barrel produced water tanks. Produced water tanks are in steel containment and there are also two frac tanks in temporary containment. There is also Mark West pipeline equipment onsite. Production numbers were submitted for 2017. Surface casing has 100 psi and intermediate casing has 2609 psi. Site meets requirements of ORC 1509.072A for preliminary restoration.
1097003013 2017-06-14 Drill / Deepen / Reopen No Violations I am onsite to perform a general site inspection. Pioneer drilling rig 77 is currently running their 9.625 inch intermediate casing. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. The area near the half round that tested high for chlorides on 5/9/17, 5/15/17, and 5/30/17 remains contaminated. The contaminated area has changed slightly as the rig has skidded from one well to the next. Presently the area between the Mathena air separator system containment and the pad berm are saturated with fluid that tests for greater than 6412 parts per million chlorides using Quantabs. The area adjacent to the chemical storage containment is also saturated with fluid that tested for greater than 6412 parts per million chloride. The Ascent company man, Matt, was with me during the field test and indicated that they had no intent to clean up the contamination or fix the leak until after the rig moved off location. Note: The previous inspection on 5/30/17 said that the owner was Chesapeake. This was a mistake, this is an Ascent leased location.
1183772125 2019-10-24 0:00 PW No Violations 1.00
1347787120 2017-11-20 Production Wells No Violations
1491298950 2017-04-04 Drill / Deepen / Reopen No Violations I am onsite today to witness the hydrostatic test for the 24 inch diameter conductor mine string combination. Falcon Drilling rig 26 drilled to 145 feet, 15 feet beyond the last total depth of 125 feet. Ascent noted that while drilling out the cement in the conductor, they hit a void during the last 6 to 8 feet of the conductor. This void was likely do to the windows that are cut in the conductor to allow for circulation. Fresh water was pumped into the 24 inch casing and brought to the top and remained static for 30 minutes.
1501767179 2017-08-03 Completion Testing No Violations On the date of my inspection I found the Keane Frac has finished stimulating the well and has removed all of their equipment from the pad. Currently there are containment crews on site patching holes in the containment in preparation for Deep Well Services. Deep Well Services is moving a work over rig onto the pad to drill out the 3 wells on the pad in preparation for production. The Ascent company man estimates drill out to take approximately 3 days per well. Falcon EFS flow back services is also currently on site rigging up. Pressure gauges on the surface and intermediate casing both show 0 pounds per square inch.
2057951866 2017-09-15 Production Wells No Violations
72106415 2017-7-14 0:00: CT No Violations 1.20
934759848 2018-1-10 0:00: PL No Violations 1.00

For data sources see[10]