X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20562

Well Details

Well ID: 34-081-20562
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Wayne Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000918
Farm/Lease Name: PUGGLE E WYN JF
License Status: Producing
License Date: 2020-02-11
Spud Date: 2014-11-07
Spud Drilling Contractor:
Final Drill Date: 2020-03-29
Well Total Depth: 21474.00 ft
Configuration: Vertical
Latitude: 40.310000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-30 Proposed Formations:TRENTON, Issued Date:10/30/2014, Expired Date:10/29/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Change of Owner 2015-11-06 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
Construction Permit Expires 2016-10-29
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
9699 21349 0
9699 21349 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1019740970 2020-3-15 0:00: CS No Violations 3.00
-1328488174 2020-3-26 0:00: DD No Violations 1.00
-149708551 2020-6-2 0:00:0 PL No Violations 1.00
-1538477164 2018-1-18 0:00: PL No Violations 1.00
-170764855 2020-5-14 0:00: CT No Violations 1.00
-724683283 2014-11-8 0:00: CS No Violations 3.00
-800688219 2020-4-30 0:00: CT No Violations 1.00
0724683283 2014-11-08 Casing String Witnessed No Violations On the date of inspection I am on site to witness the conductor cement job. I was informed by American Energy Utica consultant, Jerry Bright, that Precision Rathole Inc had drilled a 36 inch diameter hole to a depth of 100 feet. Precision ran 100 feet of 30 inch diameter, 118.64lbs.ft casing to bottom. Express Energy Services pumped fresh water ahead until fluid began to rise in the annular space, then pumped 275sk of Class A Cement, 2% CaCl, 0.50lbs/sk of celloflake, 15.6ppg, 1.18 yield. Express displaced cement with 75bbl of fresh water, no cement returned to surface, fluid level was at approximately 20 feet below the cellar. The hole was topped off the following day with 6 cubic yards of ready mix.
1490926020 2020-3-18 0:00: DD No Violations 1.00
1538477164 2018-01-18 Preliminary Restoration No Violations On the day of my inspection I found the pad has 4 properly labeled producing wells equipped with christmas tree style wellheads, 4 sand separators, 4 vertical separators, 4 line heaters and pipeline equipment. On a separate fenced area north of the well pad there are 2 shared 500 barrel tanks within a metal dike, a large vertical separator, and a gas production unit. The pad also has two steel plates covering cellars with set conductos south of the producing wells. Site meet requirements of ORC 1509.072A for prelininary restoration. This well has not been drilled below conductor according to previous report and cellar is not labeled as far as I can tell with snow cover.
197026138 2020-5-6 0:00:0 CT No Violations 1.50
419789405 2019-9-11 0:00: DD No Violations 1.00

For data sources see[4]

References