34-081-20528

Well Details

Well ID: 34-081-20528
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000515
Farm/Lease Name: NAC
License Status: Plugged Back
License Date: 2012-04-30
Spud Date: 2012-07-22
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2012-09-16
Well Total Depth:
Configuration: Vertical
Latitude: 40.300000
Longitude: -80.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-30 Proposed Formations:POINT PLEASANT, Issued Date:4/30/2012, Expired Date:4/30/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2012-09-16
Reached Total Depth 2012-09-16
Completion Report Received 2012-11-13
Construction Permit Expires 2013-04-30
End of Confidential Data 2013-09-16
Change of Owner 2014-07-24 Operator changed from 8514, HESS OHIO RESOURCES LLC to 9193, AMERICAN ENERGY UTICA LLC
Change of Owner 2015-08-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
Record Last Modified 2015-10-08

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/16/2013 11/20/2013 9720 5,735,310.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GasFlo G, 330 gal tote Baker Hughes Surfactant Oxyalkylated Amine Trade Secret 3 0.00004400 24.689
Oxyalkylated Alkylphenol (2) Trade Secret 10 0.0001465 82.2966
Methanol 67-56-1 30 0.0004395 246.89
Oxyalkylated Alkylphenol (1) Trade Secret 10 0.0001465 82.2966
Polyoxyalkylene Trade Secret 10 0.0001465 82.2966
MaxPerm-20A, 265 gallon tote Baker Hughes Friction Reducer Polyacrylate Trade Secret 60 0.220272 123738
Sodium Chloride 7647-14-5 3 0.0110136 6186.88
Oxyalkylated Alcohol Trade Secret 5 0.018356 10311.5
Petroleum Distillates 64742-47-8 30 0.110136 61868.8
CI-14 Baker Hughes Corrosion Inhibitor Fatty Acids Trade Secret 10 0.0002555 143.55
Olefin Trade Secret 5 0.0001278 71.775
Polyoxyalkylenes Trade Secret 30 0.0007666 430.65
Propargyl Alcohol 107-19-7 5 0.0001278 71.775
Methanol 67-56-1 100 0.0025554 1435.5
Sand, White, 30/50 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 10.5008 5,898,840.0
Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60 0.0066663 3744.78
Water Operator Carrier Water 7732-18-5 100 85.1265 47,819,900.0
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium Chloride 10043-52-4 5 0.0011322 635.999
Ethylene Glycol 107-21-1 30 0.006793 3815.99
HCl, 5.1 - 7.5% Baker Hughes Acidizing Water 7732-18-5 92.5 1.46555 823272
Hydrochloric Acid 7647-01-0 7.5 0.118828 66751.8
Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 2.19339 1,232,140.0
Other Chemicals Potassium Chloride 7447-40-7 0 0.00001130 6.36
Hydrochloric Acid 7647-01-0 0 0.00002560 14.355
Sodium Chloride 7647-14-5 0 0.00000680 3.816
Polyacrylate Trade Secret 0 0.0045287 2544
Copolymer Trade Secret 0 0.0005723 321.467
Water 7732-18-5 0 0.18413 103435
Modified Thiorea Polymer 68527-49-1 0 0.0001789 100.485
Formaldehyde 50-00-0 0 0.00002560 14.355
Oleate Ester 1338-43-8 0 0.0110136 6186.88
Polysorbate 9005-65-6 0 0.0110136 6186.88
NE-900, tote Baker Hughes Non-emulsifier Nonyl phenyl polyethylene glycol ether 9016-45-9 10 0.0001431 80.3668
Methanol 67-56-1 30 0.0004292 241.1
GBW-5 Baker Hughes Breaker Ammonium persulphate 7727-54-0 100 0.0037116 2085

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HESS OHIO RESOURCES LLC 114912 0 51

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 HESS OHIO RESOURCES LLC Brine 3152 8
2014 AMERICAN ENERGY UTICA LLC Brine 790 131
2015 ASCENT RESOURCES UTICA LLC Brine 168 118
2016 ASCENT RESOURCES UTICA LLC Brine 12799 359
2017 ASCENT RESOURCES UTICA LLC Brine 7084 317
2018 ASCENT RESOURCES UTICA LLC Brine 5431 262
2019 ASCENT RESOURCES UTICA LLC Brine 1151 89

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-105168712 2018-6-20 0:00: UL No Violations 1.00
-1313925121 2015-5-5 0:00:0 PW No Violations 1.00
-1403960600 2019-12-10 0:00 UL No Violations 1.00
-1886815136 2017-12-13 0:00 PW No Violations 0.30
-1935622874 2017-6-21 0:00: PW No Violations 0.50
-2061836404 2020-1-29 0:00: PW No Violations 1.00
-319176030 2013-11-12 0:00 DD No Violations 2.00
-626882422 2013-11-16 0:00 DD No Violations 8.00
-638989115 2013-12-9 0:00: DD No Violations 1.00
-794320563 2013-11-16 0:00 DD No Violations 8.00
-802923017 2013-3-25 0:00: PW No Violations 3.00
-850247331 2012-8-14 0:00: PB No Violations 2.50
-997063854 2012-8-7 0:00:0 DD No Violations
0105168712 2018-06-20 UrbanPreliminary Restoration No Violations On the date of my inspection I found this pad to contain three properly identified producing wells and one open cellar with an unidentified wellhead (permit 20499.) There are also three sand separators, two vertical separators, three line heaters, and a 400 barrel steel tank within a metal dike. Surface annular pressure is 20 psi, Intermediate annular pressure is 5 psi, production casing is 1500 psi and tubing pressure is 1100 psi. Production is up to date. Pad outslopes are well vegetated and site meets requirements of OAC 1509.072A for preliminary restoration.
0196324988 2016-09-20 Production Wells No Violations
0201809561 2013-07-10 Production Wells No Violations I was onsite to check the status of the production wells on this location. The location has the production facilities completely finished and the wells are being sold into a poly line, causing the wells to be choked back from full production at this time. I also checked the annulus gauges of the wells and this well showed 225 psi on the 13 3/8 annulus. There are no violations at this time.
0319176030 2013-11-12 Drill / Deepen / Reopen No Violations Currently they are preparing to test the casing liner that was set in the well in order to cover the perforations done to squeeze the well and stop backside pressure buildups. They tested the liners to 11,000psi and there was no pressure falloff. They plan to begin the first stage of the hydraulic fracturing Saturday.
0399914936 2013-05-01 Production Wells No Violations
0414305131 2013-11-06 Drill / Deepen / Reopen No Violations
0487904238 2016-11-30 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
0626882422 2013-11-16 Drill / Deepen / Reopen No Violations Today I witnessed the first stage of the NAC 3h-20 Frac job. The stage was successful without any issues. Pressures on all the annuli were monitored without any increases. The injection pressures were kept below 10,600psi (casing liners tested to 11,000psi) and injection rates at 80bpm. The job did have to be shut down twice due to them running out of water in their frac tanks. Normally they can heat 80bpm of water to 80F for the jobs but they had to run 100F water in this job so that the casing liners would not shrink due to the colder temperatures and compromise borehole integrity. They could only heat at 46bpm and they also used a new sand mixing system to reduce dust onsite which increased water flow line length and limited their withdrawal limits. The issues were fixed for the following stages. They plan on being down with the 16 stages by Sunday.
0638989115 2013-12-09 Drill / Deepen / Reopen No Violations I was on location to check the status of the rigging down of the completions crew. Currently the flare stack is being rigged down and moved off location. The frac wellhead is still on the well but the well has been shut in. The well has been turned over to production personnel at this time. There was about 600psi of pressure seen on the backside of the 5.5 casing according to the flow back crew, but it was bleed off and did not build back up before my arrival. There are no violations at the time of inspection.
0656206684 2013-11-21 Drill / Deepen / Reopen No Violations The last stage of the NAC hydraulic fracturing has been complete. The 15 stages of the well job went well and they are currently preparing to drill out the plugs on the well with the coiled tubing unit. They will be moving the operation to the Smithfield well in Jefferson County following the completion of this job.
0720063046 2013-04-16 Production Wells No Violations I was onsite to check the annular pressures of this well to monitor the effectiveness of the remedial cement work completed. The annular pressures were 0psi and 105psi. The pressure is bleed off daily and the pressures monitored at all times.
0764440172 2013-03-25 Production Wells No Violations
0794320563 2013-11-16 Drill / Deepen / Reopen No Violations Today I witnessed the first stage of the NAC 3h-20 Frac job. The stage was successful without any issues. Pressures on all the annuli were monitored without any increases. The injection pressures were kept below 10,600psi (casing liners tested to 11,000psi) and injection rates at 80bpm. The job did have to be shut down twice due to them running out of water in their frac tanks. Normally they can heat 80bpm of water to 80F for the jobs but they had to run 100F water in this job so that the casing liners would not shrink due to the colder temperatures and compromise borehole integrity. They could only heat at 46bpm and they also used a new sand mixing system to reduce dust onsite which increased water flow line length and limited their withdrawal limits. The issues were fixed for the following stages. They plan on being down with the 16 stages by Sunday.
0802923017 2013-03-25 Production Wells No Violations
0850247331 2012-08-14 Plug / Plug Back No Violations I was on site because H&P Drilling Rig # 287 lost the 12 1/4 hammer down the hole. They were drilling at 5546 when they lost the hammer. They made three attempts to fish the hammer out of the hole, but lost it every time they started back out of the hole. The top of the hammer is at 5541 so they tripped drill pipe back into the hole to the top of the hammer. Halliburton pumped a 483 sack plug (densecem 16.8 density and 1.02 yield) through the 5 drill pipe. Rig pulled 10 stands and pumped a ball through the drill pipe to clean the iside of the drill pipe. They advised that they would use this as a kick-plug and kick out around the lost hammer. My inspection revealed no violations at this time.
0907312205 2014-07-24 Production Wells No Violations Met with AEU representatives Kevin Eshbaugh and Corey McNutt to gain access to site. This well is currently producing. AEU reps stated that they are unable to flow the wells on this pad simultaniously due to pipeline restrictions and that they are alternating production on the wells. Large texas style wellhead with 1 400bbl tank, 3 phase seperator, line heater, and dehydrator are onsite.
0997063854 2012-08-07 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 13 3/8 casing. My inspection reveled that H&P Drilling Rig # 287 ran 1843 of 13 3/8 casing into the wellbore with
1089299675 2013-10-11 Preliminary Restoration No Violations I was on location to pass preliminary restoration for this well. The well has had a squeeze performed on it to address an annular gas migration problem for the well. The well is currently waiting to be hydraulically fractured but is on a well pad with several other wells that have had preliminary restoration approved. This well, if and when is completed will use the existing equipment on location. At this time preliminary restoration can be passed.
1176437808 2012-11-02 Drill / Deepen / Reopen No Violations I was onsite to check the status of the remediation of the annulus pressure problems of the well. A service rig was onsite and was currently in the act of being erected. I talked with Mr. Marcus Attaway, completions supervisor, regarding the schedule. The plan is to set a packer in the 5 1/2 casing today. After changing the wellhead iron, installing the BOPs for the workover rig and completing the pressure testing required for those processes tubing will be ran into the well to spot a cement plug above the packer. The cementing is set to start tomorrow noon to mid-day.
1313925121 2015-05-05 Production Wells No Violations
1343793770 2012-07-31 Drill / Deepen / Reopen No Violations I was on site to check the status of H&P Drilling Rig. My inspection revealed that they are still in the process of rigging up. I met with Ryan Gonzales and Armando Rodriguez (safety personel). Armando Rodriguez gave me Hess safety training and we discussed Hess safety policies/ procedures, personal protective equipment (PPEs), and sign in and out protocol. I advised him that they might encounter hydrogen sulfide gas while drilling this well. He advised that they have a guy on site that is qualified to train / instruct on issues dealing with hydrogen sulfide. They also advised that they would like all visitors to sign in at the guard house and the safety building prior to going on site. They advised me that they should be spudded sometime tomorrow morning. My inspection revealed no violations at this time.
1343987807 2012-08-02 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 surface casing. My inspection revealed that H&P Rig # 287 was still running the 20 casing when I arrived on site. They were having trouble getting the casing to thread together so the decided that they should weld each joint after they got them threaded into the collar. They had to call a welder and he advised that it would be at least an hour before he could arrive on location. I talked with Bill Calabreeze (Rig Consultant) and we figured it would be at least 4 or 5 hours before they would have casing ran into the wellbore. I advised him that I was going to leave the site and return later tonight. I also advised him that I would call Ruben Perez (Night Rig Consultant) and advise him to call me when they got casing on bottom. I departed the site at approximately 10:00pm and went to my residence.
1352316982 2012-11-05 Drill / Deepen / Reopen No Violations On 11/5/2012, I arrived on location at 8:00PM with ODNR Inspector Fred Romeo to witness the cement squeeze procedure on the CROSS CREEK NAC 3H-20. Halliburton was to be on location to start the process by 9:00 PM. When we arrived on location at 8:20 PM they were still running 8200 of 2 7/8 tubing, they finished running tubing at 10:00 PM, at that time Marcus Attaway Company Representative from Hess informed us that Halliburton would not be on location for at least 4 to 5 hours, a miss communication at Halliburton Office. I called Deputy Chief Robert Worstall about the time, it is 102 miles from my house to the location, he ask if I could stay to witness the job I agreed to do so. When Halliburton arrived they began to rig up there equipment start mixing there resin mixture and cement, Safety meeting, job procedure meeting . The 1st stage was completed at 12:00PM hrs. I returned home at 2:00Pm. See ODNR Inspector Fred Romeos job report for summary.
1353093389 2012-11-16 Drill / Deepen / Reopen No Violations I was onsite to check the status of the three remediation squeezes that were conducted on this well. Currently the 9 5/8 inch casing is showing 73.41psi and the 13 3/8 inch is showing 133.76psi. I was informed by a Hess employee that these pressures are currently declining and not showing increase. There are no violations at this time.
1354031505 2012-11-05 Work Over Reconditioning No Violations
1354050522 2012-11-05 Work Over Reconditioning No Violations
1354399632 2012-11-30 Work Over Reconditioning No Violations
1367508979 2013-05-01 Production Wells No Violations
1368021427 2013-05-06 Production Wells No Violations I was on location to check and see when the workover rig was going to be on location to perform some work on this well. The previous week I was told a workover rig would be on location by the weekend, this time period has been extended and they are not sure when the rig is officially coming onsite. There are no violations at this time.
1381522981 2013-10-11 Preliminary Restoration No Violations I was on location to pass preliminary restoration for this well. The well has had a squeeze performed on it to address an annular gas migration problem for the well. The well is currently waiting to be hydraulically fractured but is on a well pad with several other wells that have had preliminary restoration approved. This well, if and when is completed will use the existing equipment on location. At this time preliminary restoration can be passed.
1383855442 2013-11-06 Drill / Deepen / Reopen No Violations
1410414520 2013-08-07 Drill / Deepen / Reopen No Violations I was onsite to check annular pressures of the wells on this location. This remediated well is currently awaiting completions due to high annular pressures seen after the well was drilled. The backside of the 5.5 casing is showing 250psi of pressure and does not seem to be rising since the last inspection. Periodic inspections of this well are needed to document and track the pressures and remediation work done on this well.
1709337285 2013-11-12 Drill / Deepen / Reopen No Violations Currently they are preparing to test the casing liner that was set in the well in order to cover the perforations done to squeeze the well and stop backside pressure buildups. They tested the liners to 11,000psi and there was no pressure falloff. They plan to begin the first stage of the hydraulic fracturing Saturday.
1832932519 2013-11-21 Drill / Deepen / Reopen No Violations The last stage of the NAC hydraulic fracturing has been complete. The 15 stages of the well job went well and they are currently preparing to drill out the plugs on the well with the coiled tubing unit. They will be moving the operation to the Smithfield well in Jefferson County following the completion of this job.
1886815136 2017-12-13 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
1898862602 2012-08-20 Drill / Deepen / Reopen No Violations I was on site to check the status of the 9 5/8 casing job to determine an approximate time for the cement job. My inspection revealed that H&P Drilling Rig # 287 and Franks Casing Crew had approximately 20 to 25 joints of casing left to run into the well bore. Ruben Perez (company man) advised that they should be ready to start cementing sometime after 6:00pm. I advised that I would call him sometime before 6:00pm to see if they were still on schedule to start cementing after 6:00pm. My inspection revealed no violations at this time.
1935622874 2017-06-21 Production Wells No Violations On the date of my inspection I found a well maintained lease road with a fence and gate. The pad has 3 properly identified producing wells, one open cellar with an unidentified wellhead (Permit 34-081-2-
1951530146 2013-12-09 Drill / Deepen / Reopen No Violations I was on location to check the status of the rig down of the completions crew. Currently the flair stack is being rigged down and moved off location. The frac wellhead is still on the well but the well has been shut in. The well has been turned over to productions at this time. There was about 600psi of pressure seen on the backside of the 5.5 casing but it was bleed off and did not build back up. There are no violations at the time of inspection.
196324988 2016-9-20 0:00: PW No Violations 0.50
201809561 2013-7-10 0:00: PW No Violations 3.00
399914936 2013-5-1 0:00:0 PW No Violations 2.50
414305131 2013-11-6 0:00: DD No Violations 3.00
487904238 2016-11-30 0:00 PW No Violations 0.30
656206684 2013-11-21 0:00 DD No Violations 4.00
720063046 2013-4-16 0:00: PW No Violations 2.00
764440172 2013-3-25 0:00: PW No Violations 3.00
907312205 2014-7-24 0:00: PW No Violations 0.50

For data sources see[8]