34-075-20513

Well Details

Well ID: 34-075-20513
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Hardy Township
Operator Name: W H PATTEN DRILLING CO
Well Pad ID:
Farm/Lease Name: UHL JACOB & SONS
License Status: Final Restoration
License Date: 2014-06-02
Spud Date: 1952-08-18
Spud Drilling Contractor:
Final Drill Date: 1952-11-12
Well Total Depth: 3550.00 ft
Configuration: Vertical
Latitude: 40.580000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1952-08-18
Completed 1952-11-12
Reached Total Depth 1952-11-12
APP 2014-06-02 Proposed Formations:CLINTON, Issued Date:6/2/2014, Expired Date:6/1/2016 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-10-20
Construction Permit Expires 2016-06-01
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3478 3547 0
3478 3547 0
3478 3547 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 150 Qts 0 26 BBLS. 0 IN 24 HRS & 52M.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 W H PATTEN DRILLING CO 0.00 565.00 0
1995 W H PATTEN DRILLING CO 0.00 158.00 96
1996 W H PATTEN DRILLING CO 0.00 95.00 365
1997 W H PATTEN DRILLING CO 0.00 41.00 365
1998 W H PATTEN DRILLING CO 0.00 79.00 365
1999 W H PATTEN DRILLING CO 0.00 41.00 365
2000 W H PATTEN DRILLING CO 0.00 38.00 365
2001 W H PATTEN DRILLING CO 0.00 0.00 0
2002 W H PATTEN DRILLING CO 0.00 0.00 0
2003 W H PATTEN DRILLING CO 0.00 0.00 365
2004 W H PATTEN DRILLING CO 0.00 0.00 365
2005 W H PATTEN DRILLING CO 0.00 0.00 365
2006 W H PATTEN DRILLING CO 0.00 40.00 365
2007 W H PATTEN DRILLING CO 0.00 0.00 365
2008 W H PATTEN DRILLING CO 0.00 0.00 365
2009 W H PATTEN DRILLING CO 0.00 0.00 365
2010 W H PATTEN DRILLING CO 0.00 0.00 365
2011 W H PATTEN DRILLING CO 0.00 0.00 365
2012 W H PATTEN DRILLING CO 0.00 9.00 366
2013 W H PATTEN DRILLING CO 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 W H PATTEN DRILLING CO Brine 0 0
1995 W H PATTEN DRILLING CO Brine 0 96
1996 W H PATTEN DRILLING CO Brine 0 365
1997 W H PATTEN DRILLING CO Brine 0 365
1998 W H PATTEN DRILLING CO Brine 0 365
1999 W H PATTEN DRILLING CO Brine 0 365
2000 W H PATTEN DRILLING CO Brine 0 365
2001 W H PATTEN DRILLING CO Brine 0 0
2002 W H PATTEN DRILLING CO Brine 0 0
2003 W H PATTEN DRILLING CO Brine 0 365
2004 W H PATTEN DRILLING CO Brine 0 365
2005 W H PATTEN DRILLING CO Brine 0 365
2006 W H PATTEN DRILLING CO Brine 0 365
2007 W H PATTEN DRILLING CO Brine 0 365
2008 W H PATTEN DRILLING CO Brine 0 365
2009 W H PATTEN DRILLING CO Brine 0 365
2010 W H PATTEN DRILLING CO Brine 0 365
2011 W H PATTEN DRILLING CO Brine 60 365
2012 W H PATTEN DRILLING CO Brine 0 366
2013 W H PATTEN DRILLING CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1151818615 2014-10-8 0:00: PB No Violations
-1427570160 2014-10-21 0:00 PB No Violations
-1639507067 2014-11-3 0:00: FR No Violations
-1673381421 2014-9-25 0:00: PB No Violations
-1988446236 2014-10-17 0:00 PB No Violations
-2067741738 2014-9-26 0:00: PB No Violations
-404687542 2014-10-1 0:00: PB No Violations
-448987080 2011-10-12 0:00 PW No Violations
-574389420 2014-9-29 0:00: PB No Violations
-847544931 2014-10-14 0:00 PB No Violations
0302950631 2014-09-23 Plug / Plug Back No Violations Tagged the bottom cement plug where is was spotted. Pulled the tubing.
0404687542 2014-10-01 Plug / Plug Back No Violations Could not get back on the 7 with the steel die nipple. After repeated attempts, a full joint of 7 was run in the hole and they were able to screw back into the collar. They were unable to pull the 7 casing. Rigged up to rip the 7 casing and shut down until Monday.
0448987080 2011-10-12 Production Wells No Violations This well is in production. No problems noted.
0474591042 2013-06-27 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0574389420 2014-09-29 Plug / Plug Back No Violations The rig is pulling the 5-1/2 casing.
0672185163 2014-10-20 Plug / Plug Back No Violations The top plug was at 75. Called out a grout truck and filled the well back to the surface with 1.5 cu yards of 9 sack grout. The plug stayed up. The operator was contacted to cut the casing off and proceed with the reclamation of the location.
0847544931 2014-10-14 Plug / Plug Back No Violations The 8-5/8 casing was parted. Pulled 210 of 8-5/8 casing.
1146446037 2015-09-25 Final Restoration No Violations Good hay growth on the location. Final restoration is passed.
1151818615 2014-10-08 Plug / Plug Back No Violations The rig pulled the 7 casing.
1313331928 2014-10-09 Plug / Plug Back No Violations The rig is running 1-1/2 tubing to 1700 thru which to set the rip and Berea cement plugs.
1326660252 2014-09-22 Plug / Plug Back No Violations Petroset spotted a 400 cement plug thru the tubing. Pulled out of the cement, cleared the tubing and shut down til morning. This is a shot hole completion and we will check to see if the plug is there in the morning.
1412765832 2014-10-06 Plug / Plug Back No Violations The rig ripped the 7 at 1704, pulled 2 joints and shut down for the night.
1427570160 2014-10-21 Plug / Plug Back No Violations The grout dropped only 16. The well will be cut off and the location reclaimed.
1639507067 2014-11-03 Final Restoration No Violations The well has been cut off and buried and the pit has been emptied and filled in. The location is back to original grade. A house line needs moved and buried to complete the reclamation.
1673381421 2014-09-25 Plug / Plug Back No Violations Cut down the 10and 8 casing and unscrewed the 7 so the 5 was accessible. Pulled stretch on the 5. The 5 is ready to be shot off.
1988446236 2014-10-17 Plug / Plug Back No Violations Petroset Cementing set plugs from 475 - 320 and 260 - 0. The top plug fell back. It was decided to let the plug set up and check the depth and then fill it back to surface with grout or clay.
2000601274 2014-09-30 Plug / Plug Back No Violations Pulled the balance of the 5-1/2 casing. Rigging up the ripping tools and the changing the tongs in proparation to rip and pull 7 casing.
2067741738 2014-09-26 Plug / Plug Back No Violations Timco shot off the 5-1/2 lapweld casing at 1800 after trying several times at 2500.
302950631 2014-9-23 0:00: PB No Violations
474591042 2013-6-27 0:00: PW No Violations
672185163 2014-10-20 0:00 PB No Violations

For data sources see[9]

References