34-067-21560

Well Details

Well ID: 34-067-21560
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Archer Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001585
Farm/Lease Name: DAVIS TRUST 19-11-5
License Status: Producing
License Date: 2018-10-30
Spud Date: 2018-10-31
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-12-21
Well Total Depth: 23150.00 ft
Configuration: Horizontal
Latitude: 40.300000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-10-30 Proposed Formations:POIONT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:346.14, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-12-21
Record Last Modified 2019-03-25
Construction Permit Expires 2020-10-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
22897 22900 0
9007 9128 0
9007 9128 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-192562119 2019-6-5 0:00:0 CT No Violations 1.00
-2024454925 2019-4-24 0:00: CT No Violations 1.00
-2037240094 2019-5-6 0:00:0 CT No Violations 1.00
-407720062 2019-6-19 0:00: CT No Violations 1.00
-44541209 2018-10-31 0:00 DD No Violations 1.00
-479899442 2019-5-14 0:00: CT No Violations 1.00
0044541209 2018-10-31 Drill / Deepen / Reopen No Violations PAD ADDRESS:83690 Bargar Road, Cadiz On the day of my inspection I witnessed Express Energy was drilling this hole with a 24 inch auger at 70 feet. Identified myself to Superintenant David Newman.
0138647682 2019-04-08 Completion Testing No Violations On the day of my inspection I met with Blake James, Eric Visky, and Dan Imlay, all consultants for Encino. Profrac is onsite tied into the 5H well and the 201H well. This well has not been opened up for frac yet.13.375x9.625 annular pressure is 0 and 9.625 x 5.5 annular pressure is 30.
0192562119 2019-06-05 Completion Testing No Violations On the day of my inspection I was accompanied by Supervisor Eric Conrad. During the inspection we witnessed Stone Rig 15 onsite. This well has not been opened up for drill out. The 13.375x9.625 annular pressure was zero and the 9.625x5.5 annular pressure is 250 psi
0479899442 2019-05-14 Completion Testing No Violations On the day of my inspection I was accompanied by Inspector Jeff Adams. A Profrac frac crew is on location tied into the 1H, 3H, and 201H wells. Profrac is pumping stage 42/94. Stage 42 plug set at 16846 feet, with bottom perforation at 16828 feet and top perforation at 16708 feet. Profrac pumped 71.4 barrels of 7.5% HCl, 9677.6 barrels of clean fluid, 198740 lbs of 100 mesh sand, and 132320 lbs of 40/70 mesh sand. Total sand pumped was 331060 lbs. Maximum treating pressure was 10391 psi and average treating pressure was 9780 psi. Maximum rate was 96.7 barrels per minute (BPM) and average rate was 94.6 bpm. Break down pressure was 6226 psi. Initial shut in pressure (ISIP) was 5508. Frac gradient of 1.11 psi/ft. The 13.375x9.625 annular pressure is 20 psi and the 9.625x5.5 annular pressure is 5 psi.
1028690862 2019-04-15 Completion Testing No Violations On the day of my inspection I witnessed Procfrac on location tied into the 5H and the 201H. This well has not been opened up yet. 13.375x9.625 annular pressure is 20 psi and the 9.625x5.5 annular pressure is 310 psi.
1073537667 2019-05-23 Completion Testing No Violations
1317320385 2018-12-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 571 drilling an 8.5 inch diameter hole at 20091 feet. Aestimated total depth is 23145 feet. Company man Neil Brown says their mud weight is 11.1 but will be 11.2 at total depth. 13.375 casing was set at 687 and 9.625 was set at 2010. They drilled an 8.75 inch diameter hole to 7254. kick off pint was 7536 with 8.5 inch diameter bit and landing point was 8903.
138647682 2019-4-8 0:00:0 CT No Violations 2.00
1544541713 2018-12-10 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 571 drilled a 17.5 inch diameter open hole to a depth of 699 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet. Wyoming Casing ran 691.6 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot. Shoe track is 44 feet long. Halliburton was onsite with 697 sacks of class H neocem cement. Cement weighed with mudscale at 17 ppg and yield of 1.071. Cement displaced with 99 barrels of fresh water. 30 barrels of gel and 15 barrels of water pumped ahead of cement. 27 barrels of cement returned to surface weighing 16.5 ppg, and floats held with 1 barrel back.
1941036446 2019-05-23 Completion Testing No Violations On the day of my inspection I was accompanied by Inspector Jeff Adams. We witnessed a Profrac frac crew onsite tied into the 1H, 3H, and 201H wells. Stage 74/82 is undergoing frac. Stage 74 plug set at 12007, with bottom perforation at 11992 and top perforation at 11876. They pumped approximately 1600 barrels of produced water on this stage. Stage design is 330000 lbs of sand and ~10000 barrels of fluid. Full stage not witnessed. Twelve 350 barrel steel produced water tanks are on location, within their own containment. Tanks had <50 barrels each remaining in them.
2024454925 2019-04-24 Completion Testing No Violations On the day of my inspection I witnessed Profrac crew on location tied into the 201H and the 5H well. 3/94 stages are completed on this well. Profrac was having valve issues on another well and rigged up to this well negate down time. They are no longer tied into this well and will return once the 5h and the 201h are completed. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 215 psi.
2037240094 2019-05-06 Completion Testing No Violations On the day of my inspection I witnessed a Profrac frac crew onsite. Profrac is currently tied into the 1H, 3H, 5H and the 201H wells. Wireline is coming out of wellbore. Stage 20/94 plug set at 20161 feet, with bottom perforation at 20150 feet and top perforation at 20030 feet. . The 13.375x9.625 annular pressure was 0 psi and the 9.625x5.5 annular pressure was 88 psi.
2111977807 2019-9-17 0:00: PL No Violations 1.00
306898806 2019-6-25 0:00: CT No Violations 1.00

For data sources see[4]

References