If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21556 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Monroe Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001416 | |
Farm/Lease Name: OUR LAND CO 20-13-6 | |
License Status: Producing | |
License Date: 2018-08-31 | |
Spud Date: 2018-09-26 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-11-25 | |
Well Total Depth: 15373.00 ft | |
Configuration: Horizontal | |
Latitude: 40.400000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-08-31 | Proposed Formations:POINT PLEASANT, Issued Date:8/31/2018, Expired Date:8/30/2020 12:00:00 PM, Drilling unit acres:592.83, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2018-09-14 | CORRECTION TO TARGET FOOTAGE PER APPLICANT REQUEST |
Reached Total Depth | 2018-11-25 | |
Correction to Well | 2019-04-08 | PLAT CHANGE TARGET/TAKE |
Record Last Modified | 2019-04-08 | |
Construction Permit Expires | 2020-08-30 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
15146 | 15244 | 0 | |
8003 | 8123 | 0 | |
8003 | 8123 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/14/2019 | 03/28/2019 | 7692 | 11,929,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ProFE 105 | ProFrac | Iron Control | Citric Acid | 77-92-9 | 100 | 0.00395842 | 4636.98 |
ProCheck 100 | Nalco | Scale Inhibitor | Amine Triphosphate | PROPRIETARY | 30 | 0.00553679 | 6485.92 | |
Sodium Phosphate | 7601-54-9 | 5 | 0.000922799 | 1080.99 | ||||
Ethlene Glycol | 107-21-1 | 5 | 0.000922799 | 1080.99 | ||||
Sand (40/70 White Proppant) | ProFrac | Proppant | Silica Substrate | 14808-60-7 | 100 | 5.5228 | 6,469,520.0 | |
ProHib 100 | ProFrac | Acid Inhibitor | 2-Propyn-1-ol compound w/ methyloxirane | 38172-91-7 | 15 | 0.000494803 | 579.623 | |
Hydrochloric Acid (7.5%) | FSTI | Acidizing | Water | 7732-18-5 | 85 | 0.923056 | 1,081,290.0 | |
Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 37 | 0.401801 | 470678 | ||||
BIOC11139A | Nalco | Biocide | Glutaraldehyde | 111-30-8 | 10 | 0.00167135 | 1957.85 | |
Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride | 68424-85-1 | 30 | 0.00501404 | 5873.55 | ||||
Ethanol | 64-17-5 | 5 | 0.000835673 | 978.926 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Ethlene Glycol | 107-21-1 | 5 | 0.000922799 | 1080.99 | |
Water | 7732-18-5 | 85 | 0.923056 | 1,081,290.0 | ||||
Inorganic salt | PROPRIETARY | 10 | 0.00453893 | 5317 | ||||
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00226947 | 2658.5 | ||||
Sodium Phosphate | 7601-54-9 | 5 | 0.000922799 | 1080.99 | ||||
Ethanol | 64-17-5 | 5 | 0.000835673 | 978.926 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000453893 | 531.7 | ||||
Glutaraldehyde | 111-30-8 | 10 | 0.00167135 | 1957.85 | ||||
Sand (100 Mesh Proppant) | ProFrac | Proppant | Silica Substrate | 14808-60-7 | 100 | 8.32184 | 9,748,380.0 | |
ProSlick 710 | Nalco | Friction Reducer | Hydrotreated Light Petroleum Disitilate | 64742-47-8 | 30 | 0.0136168 | 15951 | |
Oxyalkylated alcohol | PROPRIETARY | 5 | 0.00226947 | 2658.5 | ||||
Inorganic salt | PROPRIETARY | 10 | 0.00453893 | 5317 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000453893 | 531.7 | ||||
Water | Range Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.9816 | 99,549,300.0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1843562010 | 2019-8-30 0:00: | PL | No Violations | 1.00 |
0144035491 | 2019-04-08 | Completion Testing | No Violations | On the day of my inspection I met with company men Willard Scott, Wallace Bossert, and Bub Ruckert. Stone rig #15 is onsite. They have finished drilling out the frac plugs in this well and have already ran 7907 feet of 2.375 inch diameter production tubing. Annular pressures on the 13.375 x 9.625 and the 9.625 x 5.5 are both zero psi. |
144035491 | 2019-4-8 0:00:0 | CT | No Violations | 1.00 |
1538402271 | 2018-09-28 | Casing String Witnessed | No Violations | PAD ADDRESS: 34355 BOWERS RD., BOWERSTON 44695. On the day of my inspection I witnessed Express had augured a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. CJ/Otex was onsite with 180 sacks of class A cement. They brought 30% excess for a 100 foot conductor. Company Man Neil Brown decided to displace to 115 and leave a 5 foot shoe. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. Mix water tested 67 degrees Fahrenheit, pH of 7 and 140 ppm chlorides. Cement was displaced with 40.8 barrels of fresh water. No cement returned to surface. David Newman said they tagged cement at 26 feet below cellar floor on 9/28. It was then grouted to surface. |
2046384803 | 2018-11-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 580 tripping out of hole to pick up 8.5 inch bit for curve and lateral. They drilled an 8.75 inch diameter hole to 6991 feet. 13.375 inch diameter surface casing was set at 637 feet. 9.625 inch diameter intermediate casing was set at 2025. Intermediate section was drilled with water and bentonite gel. Other wells on pad made significant water in this section while drilling on air. Estimated total depth is 15442 |
For data sources see[5]