34-067-21546

Well Details

Well ID: 34-067-21546
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Nottingham Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001548
Farm/Lease Name: RH SPARGER W NTG HR
License Status: Producing
License Date: 2018-03-22
Spud Date: 2018-03-28
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-08-09
Well Total Depth: 22587.00 ft
Configuration: Horizontal
Latitude: 40.250000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-22 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/22/2018, Expired Date:3/21/2020 12:00:00 PM, Drilling unit acres:550.22, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-08-09
Correction to Well 2018-12-21 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Record Last Modified 2019-06-11
Construction Permit Expires 2020-03-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
22285 22394 0
8246 8377 0
8246 8377 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/02/2018 12/13/2018 7932 22,017,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 K-Bac 1005 UPP Biocide Water 7732-18-5 44.3 0.00393124 8210.3
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.00051115 1067.52
Polyethylene glycol 7732-18-5 50 0.00443707 9266.7
FR-11 UPP Friction reducer Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00177214 3701.08
Sodium Chloride 7647-14-5 15 0.00886072 18505.4
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000590715 1233.69
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0147679 30842.3
Ammonium Chloride 12125-02-9 2 0.00118143 2467.39
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0147679 30842.3
Water 7732-18-5 55 0.0324893 67853.1
Oleic Acid Diethanolamide 93-83-4 3 0.00177214 3701.08
I-7L UPP Iron Control Ethylene glycol 107-21-1 20 0.000883922 1846.05
Ammonium glycolate 35249-89-9 20 0.000883922 1846.05
Hydroxyacetic acid 79-14-1 5 0.000220981 461.512
Scale Hib PE-18 UPP Scale Inhibitor Ethylene glycol 107-21-1 40 0.011038 23052.6
Proprietary Scale Inhibitor Proprietary 30 0.00827852 17289.5
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0628627 131287
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.066 23,111,000.0
Unihib G UPP Acid inhibitor Formaldehyde 50-00-0 1 0.00000665 13.892
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000332586 694.596
Methanol 67-56-1 5 0.00003326 69.46
Butyl diglycol 112-34-5 75 0.000498878 1041.89
Thiourea 62-56-6 1 0.00000665 13.892
HCL Acid (15%) UPP Acidizing Hydrochloric Acid 7647-01-0 15 0.00144288 3013.43
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 87.9745 183,732,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Hydrotreated Petroleum Distillate 64742-47-8 25 0.0147679 30842.3
Ethylene glycol 107-21-1 40 0.011038 23052.6
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000590715 1233.69
Methanol 67-56-1 5 0.00003326 69.46
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00177214 3701.08
Oleic Acid Diethanolamide 93-83-4 3 0.00177214 3701.08
Polyethylene glycol 7732-18-5 50 0.00443707 9266.7
Hydroxyacetic acid 79-14-1 5 0.000220981 461.512
Water 7732-18-5 44.3 0.00393124 8210.3
Sodium Chloride 7647-14-5 15 0.00886072 18505.4
Ammonium Chloride 12125-02-9 2 0.00118143 2467.39
Formaldehyde 50-00-0 1 0.00000665 13.892
Thiourea 62-56-6 1 0.00000665 13.892
Ethylene glycol 107-21-1 20 0.000883922 1846.05
Water 7732-18-5 55 0.0324893 67853.1
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000332586 694.596

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC 113223 24165 34

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC Brine 5160 34

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1133306011 2020-1-28 0:00: PL No Violations 1.00
-1715420783 2018-3-29 0:00: CS No Violations 1.00
-2041410180 2018-11-16 0:00 CT No Violations 1.00
-2102468955 2018-12-4 0:00: CT No Violations 1.00
-768076619 2018-7-26 0:00: DD No Violations 1.00
-921093200 2018-11-27 0:00 CT No Violations 1.00
-993702867 2018-7-31 0:00: DD No Violations 1.00
0317549905 2018-08-06 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 803 running a clean up cycle on the wellbore. They reached total depth of 22587 with an 8.5 inch diameter bit. ID to company man Matt Miller. 5.5 inch diameter production casing is onsite. Schluberger is also onsite loading cement silos. No flare during my inspection. Mud weight was 10.6 ppg.
0768076619 2018-07-26 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 803 was drilling a 12.25 inch diameter hole at 5430 feet. They are drilling on air. Company man Van Dietrich said they have 120 units of gas and that he cant tell if the hole is making any water. They had a 5 degree tangent down to 3450 at which point the started coming back to 0. Planned total depth of this section is 7200 feet. Walk around location revealed an area that appears that the liner may have a puncture as the gravel appears moist. Van is going to have the mats picked up and hole located and repaired.
0921093200 2018-11-27 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They just finished stimulating stage 87/87. Plug was set at 9434, with bottom perforation at 9423 and top perforation at 9303. Universal pumped 5047 barrels of clean water and 3010 gallons of 7.5% HCl. 250,448 lbs of sand was pumped, 41354 lbs of 100 mesh and 209094 of 40/70 mesh. Break down pressure was 7850, average pressure was 8555, max pressure was 9768, average rate was 76 barrels per minute (BPM), max rate was 83.9 BPM, initial shut in pressure (ISIP) was 5016, and 5 minute ISIP was 4576. Surface and Intermediate annular pressure was 0.
0993702867 2018-07-31 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 803 was on location and just performed a formation integrity test. They are preparing to start drilling their curve. Hole is currently at 7276 and kick off point is at 7335. 9.625 inch diameter shoe at 7192. Pad received rain this afternoon and several areas of the containment are nearly full of water. Compnay mna Matt Miller was notified.
1032920809 2018-04-11 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1280 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 1273 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Casing was centralized with 10 centralizers. Shoe track is 43 feet long. C&J/O-tex was onsite with 1340 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 187 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 47 barrels of cement (15.5 ppg) returned to surface, and floats held with 0.5 barrels back. Company man Randy Shepard and cement supervisor Grant Hughes onsite.
1545378531 2018-12-20 Drill / Deepen / Reopen No Violations On the day of my inspection I was accompanied by Geologist Tammy Richards. Universal frac crew is on location. Operations are down for maintenance and the company men could not be located during my inspection. Surface annular pressure is 0 psi and intermediate is 500 psi.
1715420783 2018-03-29 Casing String Witnessed No Violations On the day of my inspection I witnessed Express had augered a 36 inch diameter hole to 100 feet and set 100 feet of 30 inch diameter conductor casing, 118 pounds per foot. CJ/otex was onsite with 330 sacks of Class A cement. Cement weighed 15.6 with pressurized mudscale and a yield of 1.2. 50% excess ran in open hole. Cement displaced with 71 barrels of fresh water to 85 feet. 20 barrels of cement returned to surface. Cement supervisor was Kris Casas (Chili) and Ascent company men Tony Shepard and Sean Fox were onsite.
1761297486 2019-01-14 Completion Testing No Violations On the day of my inspection I witnessed Fortis Rig 1069 on location. They have just completed drilling out plugs on this well and are tripping out of wellbore. They will be running production tubing tomorrow. Surface annular pressure is 0 and intermediate is 1100. Well pressure is 1000. I asked Company man Dave Rapatoni about potential communication between 5.5 and 9.625 annular and he showed me their pressure readings showing that wellbore was up to 4000 psi and intermediate annular was hanging around 1200 psi indicating that the pressures did not mirror each other.
2020377373 2018-07-17 Drill / Deepen / Reopen No Violations On the day of my inspection I was accompanied by DOGRM Emergency Operations Coordinator Jason Blocker. Complete Energy Services llc was moving Xtreme 803 onto location. Spoke with company man Mike Atkinson. They wont be raising the derrick until later tonight.
2041410180 2018-11-16 Completion Testing No Violations On the day of my inspection I found a Universal frac crew on location. They are zipper fracking the 1 and 5 wells. They are preapring to frac on stage 42/94 on this well. Surface annular pressure is 0 and intermediate annular pressure is 250. Stage 42 plug set at 16229, with bottom perforation at 16219 and top perforation at 16098.
2102468955 2018-12-04 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men Malcolm Trahan and Bill Pugh. Stimulation was completed on this well on 11-29-18. There were 86 stages completed. Kill plug set at 7033 Surface annular pressure is 0 and intermediate pressure is 500.
317549905 2018-8-6 0:00:0 DD No Violations 1.00

For data sources see[9]