If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21545 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: German Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001533 | |
Farm/Lease Name: PICKENS 21-11-4 | |
License Status: Producing | |
License Date: 2018-01-24 | |
Spud Date: 2018-03-15 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-04-16 | |
Well Total Depth: 22919.00 ft | |
Configuration: Horizontal | |
Latitude: 40.410000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-01-24 | Proposed Formations:POINT PLEASANT, Issued Date:1/24/2018, Expired Date:1/24/2020 12:00:00 PM, Drilling unit acres:342.256, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2018-03-09 | CHANGE TO UNIT SIZE, TAKE-POINT AND TARGET INFORMATION |
Reached Total Depth | 2018-04-16 | |
Correction to Well | 2018-08-24 | TAKE TARGET AS-DRILLED |
Completion Report Received | 2018-11-07 | |
Record Last Modified | 2018-11-14 | |
Construction Permit Expires | 2020-01-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-13 | 9091 | 9252 | 0 |
2018-11-13 | 22687 | 22785 | 0 |
22687 | 22785 | 0 | |
9091 | 9252 | 0 | |
9091 | 9252 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/11/2018 | 08/06/2018 | 8594 | 16,681,600.0 | 1,250,750.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00013 | 0 |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.3668 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 9.88036 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0 | 0 | |
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 13.6754 | 0 | |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00148 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00025 | 0 | ||||
FE-2A | HALLIBURTON | Iron Control Agent | Citric Acid | 000077-92-9 | 60 | 0.00392 | 0 | |
OptiKleen-WF | HALLIBURTON | Breaker | Sodium perborate tetrahydrate | 010486-00-7 | 100 | 0.00262 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 75.1272 | 0 | |
FDP-S1320-18, FE-2A, FightR EC-1, HAI-OS, OptiKleen-WF | HALLIBURTON | Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Enter Chemical Name... | Not Assigned | 0 | 0 | 0 | ||||
Not Provided | Not Assigned | 100 | 0.05886 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-06 | H2O | 15 | 5549 Bbl | 195100 | Halliburton | STAGE 1/69
STAGES 2-68 SEE IMAGES |
2018-08-06 | H2O | 15 | 5119 Bbl | 334890 | Halliburton | STAGE 69/69
STAGES 2-68 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 2130248 | 0 | 115 |
2019 | CHESAPEAKE EXPLORATION LLC | 1151959 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 25046 | 115 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 3494 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1351762755 | 2020-2-26 0:00: | PW | No Violations | 1.00 |
-1823734023 | 2018-7-18 0:00: | CT | No Violations | 1.00 |
-1985634982 | 2018-8-20 0:00: | CT | No Violations | 1.00 |
-2007805698 | 2018-8-9 0:00:0 | CT | No Violations | 1.00 |
0030921447 | 2018-03-16 | Drill / Deepen / Reopen | No Violations | Pad address is 46800 Annapolis Rd., Hopedale, Ohio. On the day of my inspection I witnessed Express had augered a 26 inch diameter hole to a depth of 125 feet. They then ran 120 feet of 20 inch diameter casing weighing 89 pounds per foot. Express was also onsite to cement the casing with 230 sacks of class A cement with a yield of 1.18. Additives include 2% cacl and .5 pound/sack celloflake. Cement weighed 15.6 pounds per gallon with pressurized mudscale. Cement displaced with 39 barrels of fresh water. 10 barrels of cement circulated to surface. |
0089728962 | 2018-04-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Patterson 795 had reached total depth with an 8.5 inch diameter hole at 22919 feet. Wyoming casing is on location and just started running the 5.5 inch diameter production casing. Cement job anticipated early morning Wednesday. |
0304805340 | 2018-07-13 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac crew on location. Surface annular pressure is 0 and intermediate annular pressure is 0. Stage 6 has been stimulated on this well. |
0641353872 | 2018-06-20 | Completion Testing | No Violations | On the day of my inspection I found this pad contained 3 unlabeled wells that have been drilled and not stimulated. Wells do not have well heads or frac stacks installed yet, only night caps. Production equipment includes three 400 barrel steel tanks inside steel containment, three sand seperators, and four GPUs (two are mislabeled as schiappa trust). Pad is vegetated and stable. |
1065152854 | 2018-12-31 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain 3 properly labeling producing wellheads. This well is producing out of the 5.5 inch diameter production casing using natural reservoir pressure, from both sides of the wellhead. Production equipment includes 6 GPUs, 6 sand seperators, 6 line heaters (not plumbed), and 3 400 barrel steel tanks in their own containment. Surface annular pressure is 0 intermediate annular pressure is 500. Site meets requirements of 1509.072A for preliminary restoration. |
1471013856 | 2019-9-20 0:00: | PW | No Violations | 1.00 |
1491385445 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company men Jacob Peiffley and Matt Wood. Halliburton frac crew is onsite. Surface and intermediate annular pressures are 0 psi. 10H is currently being stimulated and this well is next. Wireline is in the 8H. Stage 53/69 plug set at 12472, bottom perforation at 12452, and top perforation at 12291. Perforated with 5 guns, 6 shots, on 40 foot spacing. |
1532609656 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew was on location. No stimulation was occurring during this inspection as there was not sufficient water onsite for the job. Surface and intermediate annular pressures are both zero at this time. Stage 35/69 is next stage for stimulation on this well was perforated from 16052-15891. Plug set at 16072. 5 guns with 6 shots on 40 spacing used to perforate. |
1823734023 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac crew on location. Stage 17: Plug is at 19672, bottom perforation is at 19652, and top perforation is at 19491. 5 guns with 6 shots each are used to perforate on 40 foot spacing. Surface annular pressure is 0 and the intermediate annular pressure is 0. this is the enxt well to be fracked. |
1985634982 | 2018-08-20 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone Rig 15 on location. ID to company man Wallace Bossert. This well has been drilled out and is awaiting flow back operations. Surface and annular pressures are zero and 600 respectively. Asked company man to clean up along the eastern berm on the inside of pad. There is orange stained limestone in places along the berm. |
2007805698 | 2018-08-09 | Completion Testing | No Violations | On the day of my inspection I witnessed that Halliburton has moved off of location. An aboveground storage tank and other miscellaneous tank remain. Badger Daylighting is on location cleaning tanks. Surface annular pressure is zero and intermediate annular pressure is 400. Wells have been stimulated but not had frac plugs drilled out. |
304805340 | 2018-7-13 0:00: | CT | No Violations | 1.00 |
30921447 | 2018-3-16 0:00: | DD | No Violations | 3.00 |
641353872 | 2018-6-20 0:00: | CT | No Violations | 1.00 |
89728962 | 2018-4-17 0:00: | DD | No Violations | 1.00 |
For data sources see[10]