34-067-21542

Well Details

Well ID: 34-067-21542
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Archer Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000597
Farm/Lease Name: BUELL 10-11-5
License Status: Producing
License Date: 2017-12-04
Spud Date: 2017-12-08
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-01-26
Well Total Depth: 23348.00 ft
Configuration: Horizontal
Latitude: 40.350000
Longitude: -81.010000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-01 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/1/2017, Expired Date:8/1/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2017-09-15 CORRECTION TO EXPIRATION DATE.
APP 2017-12-04 Proposed Formations:POINT PLEASANT, Issued Date:12/4/2017, Expired Date:12/4/2019 12:00:00 PM, Drilling unit acres:1142.55, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-01-26
Correction to Well 2018-06-01 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT
Completion Report Received 2018-10-24
Record Last Modified 2018-11-01
Construction Permit Expires 2019-12-04

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-31 9654 9775 0
2018-10-31 23120 23215 0
23120 23215 0
9654 9775 0
9654 9775 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/17/2018 07/07/2018 8612 23,743,900.0 1,689,130.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 0.3 0.00365 0
FE-2A, FightR EC-1, HAI-OS, OptiKleen-WF HALLIBURTON Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent Not Provided Not Assigned 1 0.00037 0
Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
FE-2A HALLIBURTON Iron Control Agent Citric Acid 000077-92-9 0.6 0.00004000 0
Excelerate PS-2 HALLIBURTON Friction Reducer Inorganic salt Trade Secret 0.3 0.00014 0
Petroleum Distillate Hydrotreated Light 064742-47-8 0.3 0.00014 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.8042 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.12985 0
OptiKleen-WF HALLIBURTON Breaker Sodium perborate tetrahydrate 010486-00-7 1 0.00006000 0
HAI-OS HALLIBURTON Corrosion Inhibitor Methanol (Methyl Alcohol) 000067-56-1 0.6 0.00001000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.1 0 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 0.02 0 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.05262 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-06 H2O 15 221468 Gal 322787 Halliburton STAGE 93/93

STAGES 2-92 SEE IMAGES

2018-05-17 H2O 15 186613 Gal 197900 Halliburton STAGE 1/93

STAGES 2-92 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 1636941 9501 147
2019 CHESAPEAKE EXPLORATION LLC 1309838 2016 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 20070 147
2019 CHESAPEAKE EXPLORATION LLC Brine 5774 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1331643449 2018-1-9 0:00:0 CS No Violations 3.00
-1331761973 2018-7-18 0:00: CT No Violations 1.00
-1369618537 2018-7-24 0:00: CT No Violations 1.00
-1478323055 2020-7-21 0:00: PW No Violations 1.00
-2063443976 2018-1-2 0:00:0 DD No Violations 1.00
-437107752 2017-12-27 0:00 DD No Violations 5.50
-445669266 2018-1-16 0:00: DD No Violations 1.00
-631712618 2018-8-23 0:00: PW No Violations 1.50
0437107752 2017-12-27 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that a Mid East Trucking crane had lost control of the topdrive section of derrick while trying to rig up. The section of the derrick landed over top of the 1h, 3h, and 5h wells that were previously producing. Chesapeake had set bridge plugs in these wells around 7000 feet and loaded above the plug. A needle valve was knocked off of the 3h well and the 1h and 5h were not touched. Pressure was released from the 3h well however according to Company man Danny Lambert no LEL readings registered on their monitoring equipment. This all happened around 22:30 on 12/26. On 12/27 at around 16:00, the crane which toppled over was released from the top drive section of the derrick. The Topdrive section was stabilized with another crane, cribbing, a tandem winch truck, and a pole truck. At around 17:30 the derrick was lifted off of the wells and laid safely off to the side. Replacement wellhead cages are already onsite and Chesapekae production personal were onsite to remove the cap with broken needle valve and replace it. 2 men were in a man lift that was struck by the falling derrick but walked away from the incident.
0445669266 2018-01-16 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 571 tripping out to the Clinton at 7000 feet to load hole with oil base mud and start their curve. Hole is currently drilled to a depth of 8513 with 8.5 inch diameter bit.
0631712618 2018-08-23 Production Wells No Violations Well has been drilled, stimulated, and drilled out. Well has not been flowed back yet. ID to facilities foreman Trevor Joilet. Current activity on pad is production equipment construction and installation. Drilling of 4 new wells on this pad started in december of 2017. They have not been flowed back yet. Call to Chris Huey production foreman stated that flowback should start on 8-30 for the 4 new wells and he hopes to bring the 5 existing wells back online around mid september. Production equipment includes four line heaters, 4 sand seperators, and 4 GPUs for the new wells. Existing wells have 5 sand seperators, 5 GPUs, 2 combustors, 3 compressors, and 7 400 barrel steel tanks in their own containment. All nine wells on the pad are shut in. Surface annular pressure is 0 and intermediate annular pressure is 620.
0687610064 2018-07-12 Completion Testing No Violations On the day of my inspection I witnessed Stone rig 15 drilling out plug number 56 of 94. Surface annular pressure is 0 and intermediate annular pressure is 50 psi. South and east of the wellheads some crystalization was noted on the pad. David Reese and Blake Riley are company men for Chesapeake. They were informed of the potential containment issue and said that would get it fixed and cleaned up right away. The area is dry and does not appear to have been a large volume of fluid that escaped primary containment.
1331643449 2018-01-09 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 571 drilled a 17.5 inch diameter open hole to a depth of 679 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet. Wyoming Casing ran 654 feet of 13.375 inch diameter casing, j-55, 54.5lbs/foot and a 4 foot stickup. Casing was centralized with 15 centralizers. Shoe track is 39 feet long. Sclumberger was onsite with 96 sacks of class A scavenger cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.8. They also had 662 sacks of cemcrete tail cement weighing 17 ppg and a yield of 1.08. 50% excess ran in open hole. Cement displaced with 95 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 55 barrels of cement returned to surface, and floats held with 0.5 barrels back.
1331761973 2018-07-18 Completion Testing No Violations On the day of my inspection I witnessed Stone rig 15 onsite. They have drilled all plugs in this wellbore. Surface annular pressure is 0 and intermediate annular pressure is 150. Containment has been repaired from last weeks inspection and contaminated gravel was removed.
1369618537 2018-07-24 Completion Testing No Violations On the day of my inspection I witnessed Stone rig #15 in onsite. This well has had all plugs drilled out. Surface annular pressure is 30, intermediate annular pressure is 210, and production casing pressure is 2100.
2063443976 2018-01-02 Drill / Deepen / Reopen No Violations On the day of my inspection I am accompanied by ODNR emergency responder Jason Blocker. This is a follow-up inspection to the crane incident from last week. Patterson 571 has not gotten the damaged derrick back. They are currently setting the air package on location. Wellhead cages have been replaced with new, undamaged ones.
2143553583 2018-05-14 Completion Testing No Violations On the day of my inspection I found halliburton rigged up to the 6H, 206H, 10H, and the 210H. This well has had 0 out of 93 stages fracked. The 9.625 inch diameter annular pressure is 117 psi. The 13.375 inch diameter annular pressure is zero. Frack is currently shut down due to lighting strikes within 10 miles.
687610064 2018-7-12 0:00: CT No Violations 1.00
788743727 2019-10-11 0:00 PL No Violations 1.00

For data sources see[10]