If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21541 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.35,"lon":-81.01,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000597 | |
Farm/Lease Name: BUELL 10-11-5 | |
License Status: Producing | |
License Date: 2017-12-12 | |
Spud Date: 2017-12-09 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-03-04 | |
Well Total Depth: 20805.00 ft | |
Configuration: Horizontal | |
Latitude: 40.350000 | |
Longitude: -81.010000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-08-01 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/1/2017, Expired Date:8/1/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-12-12 | Proposed Formations:POINT PLEASANT, Issued Date:12/12/2017, Expired Date:12/12/2019 12:00:00 PM, Drilling unit acres:308.15, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-03-04 | |
Correction to Well | 2018-06-01 | UPDATE ACREAGE/TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-16 | |
Record Last Modified | 2018-10-20 | |
Construction Permit Expires | 2019-12-12 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 9093 | 9212 | 0 |
2018-10-19 | 20491 | 20492 | 0 |
20491 | 20492 | 0 | |
9093 | 9212 | 0 | |
9093 | 9212 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/12/2018 | 07/01/2018 | 8643 | 23,242,600.0 | 1,631,580.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | OptiKleen-WF | HALLIBURTON | Breaker | Sodium perborate tetrahydrate | 010486-00-7 | 1 | 0.00004000 | 0 |
FE-2A, FightR EC-1, HAI-OS, OptiKleen-WF | HALLIBURTON | Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Not Provided | Not Assigned | 1 | 0.00024 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.04261 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 0.02 | 0 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.81383 | 0 | |
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.13207 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 0.3 | 0.0031 | 0 | |
Excelerate PS-2 | HALLIBURTON | Friction Reducer | Inorganic salt | Trade Secret | 0.3 | 0.00018 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 0.3 | 0.00018 | 0 | ||||
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.1 | 0 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 0.6 | 0.00001000 | 0 | ||||
FE-2A | HALLIBURTON | Iron Control Agent | Citric Acid | 000077-92-9 | 0.6 | 0.00003000 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-12 | H2O | 15 | 237360 Gal | 271070 | Halliburton | STAGE 1/78
STAGE 2-77 SEE IMAGES |
2018-07-01 | H2O | 15 | 247633 Gal | 335900 | Halliburton | STAGE 78/78
STAGES 2-77 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 1700184 | 25865 | 147 |
2019 | CHESAPEAKE EXPLORATION LLC | 1331310 | 9601 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 12332 | 147 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 3896 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1848227410 | 2018-7-24 0:00: | CT | No Violations | 1.00 |
-2135315025 | 2018-7-2 0:00:0 | CT | No Violations | 1.00 |
-400809377 | 2018-8-23 0:00: | PW | No Violations | 1.50 |
-651806298 | 2019-10-11 0:00 | PL | No Violations | 1.00 |
0400809377 | 2018-08-23 | Production Wells | No Violations | Well has been drilled, stimulated, and drilled out. Well has not been flowed back yet. ID to facilities foreman Trevor Joilet. Current activity on pad is production equipment construction and installation. Drilling of 4 new wells on this pad started in december of 2017. They have not been flowed back yet. Call to Chris Huey production foreman stated that flowback should start on 8-30 for the 4 new wells and he hopes to bring the 5 existing wells back online around mid september. Production equipment includes four line heaters, 4 sand seperators, and 4 GPUs for the new wells. Existing wells have 5 sand seperators, 5 GPUs, 2 combustors, 3 compressors, and 7 400 barrel steel tanks in their own containment. All nine wells on the pad are shut in. Surface annular pressure is 0 and intermediate annular pressure is 350. |
1200444215 | 2018-03-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I wintessed Patterson 571 drilling their 8.5 inch diameter hole at a depth of 11459 feet. Kick off point of curve is 8316 and landed at 9195 feet. Walk around location revealed pad drains are closed and containment is functioning properly. |
1349386672 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone rig 15 onsite. They have not drilled any plugs in this wellboore. Surface annular pressure is 0 and intermediate annular pressure is 250. Containment has been repaired from last weeks inspection and contaminated gravel was removed. |
1519187495 | 2018-02-20 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Patterson 571 drilled a 17.5 inch diameter open hole to a depth of 668 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet. Wyoming Casing ran 655 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot. Casing was centralized with 14 centralizers. Shoe track is 43 feet long. Schlumberger was onsite with 670 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 50% excess ran in open hole. Cement displaced with 94 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 45 barrels of cement returned to surface, and floats held with 0.5 barrels back. |
1519392311 | 2018-02-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 571 drilling their 12.25 inch diameter hole at 757 feet. VES is onsite taking 2 surveys every 30 feet drilled. The surface casing was set at a 2.58 degree deviation when it was supposed to be zero degrees. Wellbore is 15 feet from another wellbore down hole and they are monitoring progress to avoid any down hole collisions. |
1691698086 | 2018-05-14 | Completion Testing | No Violations | On the day of my inspection I found halliburton rigged up to the 6H, 206H, 10H, and the 210H. This well has had 3 out of 78 stages fracked. The 9.625 inch diameter annular pressure is 77 psi. The 13.375 inch diameter annular pressure is zero. Frack is currently shut down due to lighting strikes within 10 miles. |
1792238162 | 2018-07-12 | Completion Testing | No Violations | On the day of my inspection I found Stone rig 15 on location to drill out frac plugs. Current surface annular pressure is 0 and intermediate annular pressure is 140 psi. Currently drilling out on permit 1542. South and east of the wellheads some crystalization was noted on the pad. David Reese and Blake Riley are company men for Chesapeake. They were informed of the potential containment issue and said that would get it fixed and cleaned up right away. The area is dry and does not appear to have been a large volume of fluid that escaped primary containment. |
1848227410 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone rig #15 in onsite. The rig is currently drilling plug 40/79. Surface annular pressure is 0 and intermediate annular pressure is 250. |
1982565483 | 2020-7-21 0:00: | PW | No Violations | 1.00 |
2135315025 | 2018-07-02 | Completion Testing | No Violations | On the day of my inspection I found a Halliburton frac crew rigged up to this as well as permits 21540 and 21067. The surface casing annulus is 0 and intermediate casing annulus is 19 psi. stage 78 of 78 was just completed. Well needs one more kill plug placed in the well. |
For data sources see[10]