X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21470

Well Details

Well ID: 34-067-21470
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: North Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001251
Farm/Lease Name: HARTLEY 2-13-6
License Status: Producing
License Date: 2017-07-10
Spud Date: 2017-07-21
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-09-20
Well Total Depth: 22898.00 ft
Configuration: Horizontal
Latitude: 40.410000
Longitude: -81.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-04-29 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:4/29/2015, Expired Date:4/28/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2017-04-14 CHANGE TO WELL NUMBER PER OWNER REQUEST.
APP 2017-05-10 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:5/10/2017, Expired Date:5/10/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-07-06 Proposed Formations:POINT PLEASANT, Issued Date:7/6/2017, Expired Date:7/6/2019 12:00:00 PM, Drilling unit acres:379.01, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-07-10 Proposed Formations:POINT PLEASANT, Issued Date:7/10/2017, Expired Date:7/10/2019 12:00:00 PM, Drilling unit acres:379.01, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-09-20
Correction to Well 2018-02-16 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-03-06
Record Last Modified 2018-03-17
Construction Permit Expires 2019-07-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-03-19 8400 8521 30
2018-03-16 22650 22771 30
22650 22771 30
8400 8521 30
8400 8521 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/25/2017 11/29/2017 7779 17,130,000.0 1,719,690.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01331 0
Proprietary Inorganic Salt Trade Secret 30 0.01331 0
BA-40L HALLIBURTON pH Adjusting Agent Potassium Carbonate 000584-08-7 60 0.00021 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00021 0
BA-40L, BC-140 X2, FE-1A, FR-76,

HAI-OS, OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Polyacrylamide copolymer Trade Secret 30 0.0162 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00016 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 16.4008 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00027 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00165 0
BC-140 X2 HALLIBURTON Cross Linker Ethylene Glycol 000107-21-1 30 0.01445 0
Monoethanolamine borate 026038-87-9 60 0.0289 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Hydrochloric Acid 007647-01-0 8 0.09118 0
Water 007732-18-5 93 1.12457 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 66.9494 0
FE-1A HALLIBURTON Iron Control Agent Acetic Anhydride 000108-24-7 100 0.0061 0
Acetic acid 000064-19-7 60 0.00366 0
OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.00053 0
Ammonium Persulfate 007727-54-0 100 0.00176 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 13.7508 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.09106 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00062 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-25 H2O 10 4903 Bbl 359664 Halliburton STAGE 1/96

STAGES 2-95 SEE IMAGES

2017-11-29 H2O 10 3719 Bbl 333740 Halliburton STAGE 96/96

STAGES 2-95 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 979684 128157 354
2019 CHESAPEAKE EXPLORATION LLC 147946 17066 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 59631 354
2019 CHESAPEAKE EXPLORATION LLC Brine 2617 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1813808201 2018-4-10 0:00: PL No Violations 1.00
-2046503067 2017-9-14 0:00: DD No Violations 1.00
-80923220 2016-2-23 0:00: ND No Violations 0.50
0080923220 2016-02-23 Not Drilled No Violations On the day of my inspection accompanied by inspector Mark Moreland, I witnessed the well location has been constructed but the permitted wells have not been drilled and no conductor or tin horn has been set. The pad is fenced and all man doors were locked. The lease road was in adequate condition.
0090389048 2017-09-06 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 580 drilled a 17.5 inch diameter open hole to a depth of 676 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 94 feet. Wyoming Casing ran 676 feet of 13.375 inch diameter casing, j-55, 54.5lbs/foot. Casing was centralizer with 6 centralizers. Shoe track is 47 feet long. Schlumberger was onsite with 615 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 97 barrels of fresh water. 20 barrels of geland 10 barrels of water pumped ahead of cement. 37 barrels of cement returned to surface, and floats held with .75 barrel back. Mix water has pH of 7, <38 ppm chlorides and 69 degrees Fahrenheit.
1020166870 2018-11-06 Preliminary Restoration No Violations On the day of my inspection I witnessed this pad containing 3 producing wells. This well is producing off of natural reservoir pressure through tubing. Surface annular pressure is 31 and intermediate annular is 65. Intermediate annular is plumbed into flowline. Production equipment includes 3 GPUs, 3 sand seperators, 2 compressors, a combustor, and 10 400 barrel steel tanks in their own containment. Six tanks are condensate and four are produced water. Site meets requirements of OAC 1509.072A for preliminary restoration.
1500899320 2017-07-24 Casing String Witnessed No Violations On the day of my inspection I witnessed Express energy services had augured a 26 inch diameter hole to 110 feet. Hole and cellar were both comletely full of water. Water was sucked out of cellar. 110 feet of 20 inch diameter conductor casing was run on 7-22-17. Express energy services was onsite with 210 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack floseal. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 35.5 barrels of fresh water. 15 barrels of cement returned to surface. Job was scheduled at 9 am and water trucks did not arrive on location until 11am.
153339106 2020-6-22 0:00: PW No Violations 1.00
1813808201 2018-04-10 Preliminary Restoration No Violations On the day of my inspection I found this pad containing 3 properly labeled well that are producing on natural reservoir pressure. All wells have christmas tree style wellheads. Pressure gauges read as follows: Surface 43 psi, Intermediate 7.5 psi, Production 1129 psi, and Tubing 680 psi. Intermediate annulus is plumbed to buried flowline with dump valve. Blind side of casing hanger is also plumbed into a buried flow line but is currently shut in. Production equipment includes ten 400 barrel steel tanks within their own steel containment, two compressors, two line heaters, three sand separators, three GPUs, two heater treaters, a vapor recovery stack, and a combustor. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A.
1992298965 2019-10-23 0:00 PW No Violations 1.00
2046503067 2017-09-14 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 580 was drilling a 8.5 inch diameter hole at 11,317 feet into the curve. Walk around pad location to view containment and no spills, leaks or hole were noted. Pad drains are shut in.
90389048 2017-9-6 0:00:0 CS No Violations 3.00

For data sources see[10]

References