X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21302

Well Details

Well ID: 34-067-21302
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Athens Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000889
Farm/Lease Name: CHARLEY ATH HR
License Status: Producing
License Date: 2014-03-10
Spud Date: 2014-05-22
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2014-11-26
Well Total Depth: 18164.00 ft
Configuration: Horizontal
Latitude: 40.220000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-10 Proposed Formations:POINT PLEASANT, Issued Date:3/10/2014, Expired Date:3/9/2016 12:00:00 PM, Drilling unit acres:934.305, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-11-26
Correction to Well 2015-02-06 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-11-19
Construction Permit Expires 2016-03-09
Change of Owner 2018-10-15 Operator changed from 8870, HESS OHIO DEVELOPMENTS LLC to 9520, ASCENT RESOURCES UTICA LLC
Correction to Well 2018-10-19 CHANGE IN WELL NAME AND NUMBER (PREVIOUS: ATHENS C #2H-19)
Record Last Modified 2018-10-19

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/05/2015 06/25/2015 8708 13,301,800.0 623291

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Hess Corporation Base Fluid Water 7732-18-5 100 90.4771 110,937,000.0
AI-301 U.S. Well Services, LLC Acid Corrosion Inhibitors Coco amine 61791-14-8 5 0.00004000 43.3513
Methenamine 100-97-0 20 0.0002 250.684
Polyethylene polyamine 68603-67-8 10 0.00008000 94.9017
Diethylene Glycol 111-46-6 30 0.00026 316.37
Hydrogen Chloride 7647-01-0 10 0.00009000 109.321
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00233 2855.95
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00408 4999.95
SI-1100 U.S. Well Services, LLC Scale Inhibitor Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 10 0.00106 1298.16
bis (hexamethylene) tramine penta

(methylene phosphonic acid) - phosphate acid

40623-75-4 10 0.0009 1105.84
hexamethylenediamine tetra (methylene phosphonic acid) 38820-59-6 10 0.00098 1202
Ethylene Glycol 107-21-1 40 0.00354 4346.44
Copolymer of Maleic and Acrylic acid 26677-99-6 10 0.00093 1134.69
Di Water 7732-18-5 80 0.00627 7692.82
Acrylic polymer 52255-49-9 5 0.00039 480.801
2-Phosphonobutane 1,2,4 tricarboxylic salt 37971-36-1 10 0.00101 1240.47
HCL Acid (3% to 7.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 7.5 0.06332 77637.1
Water 7732-18-5 97 0.70526 864743
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 8.56716 10,504,500.0
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.00426 5224.18
Water 7732-18-5 87.5 0.01784 21870.6
WFRA-405 U.S. Well Services, LLC Friction Reducer Anionic Polyacrylamide Proprietary 40 0.04061 49789.8
Water 7732-18-5 40 0.04061 49789.8
Ethoxylated alcohol blend Proprietary 5 0.00508 6223.73
Sodium Chloride 7647-14-5 20 0.0203 24894.9
Petroleum Distillates 64742-47-8 20 0.01634 20040.4
HVFR-Bx3 U.S. Well Services, LLC Friction Reducer Polyacrylamide 9003-05-8 50 0.01184 14517.9
Ethoxylated Alcohol Blend Proprietary 6 0.00099 1219.5
Suspending Agent 14808-60-7 3 0.00076 929.143
Petroleum Distillate 64742-47-8 50 0.00639 7839.64

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-04-28 H2O 8 7289 Bbl 264780 US Well Services Inc STAGE 2/26

36 SHOTS STAGES 3-25 SEE IMAGES

2015-05-06 H2O 8 7856 Bbl 276000 US Well Services Inc STAGE 26/26

36 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 HESS OHIO DEVELOPMENTS LLC 800107 16572 115
2016 HESS OHIO DEVELOPMENTS LLC 1965786 12503 366
2017 HESS OHIO DEVELOPMENTS LLC 1021831 2359 363
2018 ASCENT RESOURCES UTICA LLC 540220 731 332
2019 ASCENT RESOURCES UTICA LLC 127257 59 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 HESS OHIO DEVELOPMENTS LLC Brine 4779 115
2016 HESS OHIO DEVELOPMENTS LLC Brine 8863 366
2017 HESS OHIO DEVELOPMENTS LLC Brine 4754 363
2018 ASCENT RESOURCES UTICA LLC Brine 2259 332
2019 ASCENT RESOURCES UTICA LLC Brine 628 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-140543314 2019-10-8 0:00: PW No Violations 1.00
-1945631599 2015-1-9 0:00:0 DD No Violations 1.00
-2004310876 2014-6-5 0:00:0 CS No Violations 1.50
-250070265 2014-9-15 0:00: DD No Violations 0.50
-723968851 2014-6-4 0:00:0 CS No Violations 4.00
0250070265 2014-09-15 Drill / Deepen / Reopen No Violations I am on site today to meet with Hess Ohio Drilling Superintendent Bob Mcspadden and John Mode because of the pressure on the annulus of the 9-5/8 inch diameter casing string. This well has 700 PSI on the annulus of the deep intermediate casing string. It has a depth of 7900 ft. I advised that a plan be submitted for approval on how to remediate the annulus pressure before the well can be placed into production.
0723968851 2014-06-04 Casing String Witnessed No Violations I am on site today to witness the running and cementing of the 18-5/8 inch diameter casing string. HAD Drilling Rig # 618 drilled a 22.5 inch diameter hole to 540 ft and set 502 ft of casing. Halliburton Energy cemented with 510 sacks of class A cement at 15.6 lbs and 1.2 yield. Had cement returns to surface.
0891749697 2017-08-31 Preliminary Restoration No Violations On the day of my inspection I found the Athens C pad seperated between a production equipment pad and a wellhead pad. Six properly labeled chritsmas tree style welheads are on location. Production equipment includes four 400 barrel steel condensate tanks, one 400 barrel brine tank, six line heaters, one seperator, flare, and vapor recovery system. Production equipment is fenced and locked and access the wellheads is also restricted by fence. Production records are current in RBDMS. Site passes preliminary restoration according to ORC 1509.072A.
0945221902 2014-12-05 Drill / Deepen / Reopen No Violations I am on site today to check on the chloride drainage to the left corner of the well pad. The sump is in place and the readings are down after several days of rain. The operator has continued to pump the sump back into a tank and will continue to do so until the readings drop further.
1416168092 2014-11-16 Drill / Deepen / Reopen No Violations I received a call from Hess Ohio, Mike Roberts to inform me of a chloride spill which has occurred on the Athens C Pad. Mike said that the left corner has 1 bbl. Of 1300 PPM chloride running into a small sump. I arrived to find that the H & P Drilling Rig # 284 is drilling at 10,670 ft. I met with Mike Roberts and Hess Safety people. They said that the leak has just began within the last 2 days. It is around a bbl. a day. They do regular walks around the location and discovered that fluid is running out of the corner sump. The sump is being pumped into a tank and is not leaving the pad. After looking at the pad I advised that a deeper sump be excavated and that they should begin to monitor the entire drilling system until a point of origin has been determined. I ask for the as built plans to discover where the French drains are located so that not only a point of origin is found but also discover how much of a spill has occurred.
1416403435 2014-11-18 Drill / Deepen / Reopen No Violations Today I am meeting with Jason Simmerman and Anthony Carson to review the site construction plans and the on going chloride leak. We did walk the site and check the plans but could not determine the source of the chlorides. The southeast corner was to have a sump excavated and a liner installed but that has not occurred. I spoke to the Company Man on site and he said he is still waiting on call before you dig response. The leak in the corner is flowing at the same rate as before even though the temp is down to 9 and most everything else is frozen. They did spot a tank which they are using to pump the fluid that makes it into the duck pond.
1945631599 2015-01-09 Drill / Deepen / Reopen No Violations The sump remains in place but there is no fluid running into it or being pumped out today because it is frozen. The chlorides have continued to decline and the fact that everything is frozen means they are low.
2004310876 2014-06-05 Casing String Witnessed No Violations The pressure test did not pass and they were going to run tubing in and cement but changed that after I arrived. Now they will move the HAD rig to the # 6 well permit # 1306. The cement job will be done by Patterson 284
2138130298 2014-11-17 Drill / Deepen / Reopen No Violations I am on site today to check on the brine leak in the southeast corner of the pad. The as built plans are being forwarded to me today. The leak has not increased or decreased in flow and is about 1 bbl. Or more each day. Samples were collected Sunday by Enviro Track and the results copied to ODNR. The sump has not been added as they are waiting on Before you dig response. The site is snow covered today and the temperature should drop to 9 or 10 and limit the fluids flowing on site.
891749697 2017-8-31 0:00: PL No Violations 1.00
945221902 2014-12-5 0:00: DD No Violations 1.50

For data sources see[9]

References