If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21284 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000887 | |
Farm/Lease Name: MADZIA UNIT | |
License Status: Producing | |
License Date: 2016-04-19 | |
Spud Date: 2014-05-19 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-07-27 | |
Well Total Depth: 14764.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-30 | Proposed Formations:POINT PLEASANT, Issued Date:1/30/2014, Expired Date:1/30/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-02-19 | Proposed Formations:POINT PLEASANT, Issued Date:2/19/2014, Expired Date:2/19/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-07-27 | |
Correction to Well | 2015-06-19 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
APP | 2016-04-19 | Proposed Formations:POINT PLEASANT, Issued Date:4/19/2016, Expired Date:4/19/2018 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:TI |
Completion Report Received | 2016-12-27 | |
Construction Permit Expires | 2017-04-19 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/27/2016 | 09/16/2016 | 8185 | 13,294,000.0 | 78500 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.549402 | 702468 |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.6089 | 110,739,000.0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00002659 | 34 | ||||
Olefins | Proprietary | 5 | 0.000220553 | 282 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.8393 | 16,416,400.0 | ||||
Ethylene oxide | 75-21-8 | 0.1 | 0.00000078 | 1 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00054669 | 699 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0823312 | 105269 | ||||
Methanol | 67-56-1 | 60 | 0.0010926 | 1397 | ||||
Acetic acid | 64-19-7 | 60 | 0.000333176 | 426 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00054669 | 699 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00054669 | 699 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000159549 | 204 | ||||
Glycerine | 56-81-5 | 5 | 0.00002659 | 34 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00018223 | 233 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.000553729 | 708 | ||||
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HCL >10% | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-09-12 | H2O | 15 | 428069 Gal | 444036 | Halliburton | STAGE 38/38
36 SHOTS |
2016-08-27 | H2O | 15 | 325644 Gal | 453098 | Halliburton | STAGE 1/38
45 SHOTS STAGES 2-37 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 228555 | 33387 | 87 |
2017 | ECLIPSE RESOURCES I LP | 990261 | 68655 | 364 |
2018 | ECLIPSE RESOURCES I LP | 538456 | 12651 | 362 |
2019 | ECLIPSE RESOURCES I LP | 101063 | 1828 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 10563 | 87 |
2017 | ECLIPSE RESOURCES I LP | Brine | 20918 | 364 |
2018 | ECLIPSE RESOURCES I LP | Brine | 10078 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1730 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1005157214 | 2019-12-17 0:00 | PW | No Violations | 1.00 |
-1026916586 | 2020-9-30 0:00: | PW | No Violations | 0.20 |
-1376406859 | 2014-3-3 0:00:0 | CS | No Violations | 1.00 |
-1803305514 | 2016-12-15 0:00 | PL | No Violations | 1.00 |
-438173487 | 2014-7-22 0:00: | DD | No Violations | 2.00 |
0438173487 | 2014-07-22 | Drill / Deepen / Reopen | No Violations | On the date of inspection I spoke with Eclipse Resources Company Man Chad Rice. The Nomac 245 rig is drilling ahead at a depth of 13472 at the time of my inspection. Chad Rice expects to reach Total Depth late today 7/22/14 or early tomorrow 7/23/14. The construction contractor Whipstock is continuing to work along the access road dumping aggregate into the ditch line and installing culverts and sumps. |
0720815914 | 2014-05-19 | Casing String Witnessed | No Violations | On arrival on location Rig crew was running 13 3/8 inch casing to the depth of 389 feet. Halliburton Energy services was prepairing to cement casing to serface. Circulated 9 bbls of cement to surface. |
1244471071 | 2014-07-11 | Drill / Deepen / Reopen | No Violations | On the date of inspection I witnessed that the Nomac 245 was rigging up on the Madzia Unit 10H well. I spoke to the Eclipse Company Man on site for a status update. Nomac 245 plans to re-spud late tonight or early tomorrow morning. The 9.625 inch casing has been set and the rig will begin drilling an 8.75 inch hole for 5.5 inch production casing. |
1342322170 | 2018-10-18 | Production Wells | No Violations | |
1376406859 | 2014-03-03 | Casing String Witnessed | No Violations | Butches Rat hole Service drilled a 30 inch diameter hole to 110 ft and set 110 ft of 24 inch diameter casing. Halliburton Cementing Service c/w 290 sks of class A cement 15.6 and 1.22 with good returns. Pick up cement info this day for the job which was set 03/01/2014 when I was out of hours. |
1400595879 | 2014-05-20 | Non Well | No Violations | Eclipse Resources called to inform me that an 18 wheel tractor trailer had overturned leaving their lease road. The truck was hauling drill cuttings from the intermediate section of the well bore. The depth of that sections is from 400 ft to 1500 ft. Inspector Akins was on site and collected photos and tested the cuttings for chlorides. The cuttings were sampled using a quantab titration test strip. It did not register any chlorides. I met with Eclipse Resources Bruce Carpenter and Bill Radford and went over the cleanup details. They are to try and hydrate the cuttings and vacuum them up. The material which can not be vacuumed away will be slowed from release by absorbent booms which are in place. |
1400597203 | 2014-05-20 | Non Well | No Violations | I received a phone call from Josh Angleline with Eclipes Resources that a Waste Management truck hauling drill cutting had overturned at the bottom of the their lease road and the county road. On arrival of location, I found several booms had already been installed in the little stream that travels under the lease road. Bruce Carpenter from the Eclipes environmental department , and Steven Milles with Weavertown environmental group was on site. The drill cuttings were from the intermediate string section, 389 feet to 1560 feet. All fluids from the truck were contained around the truck and no fluids made it to the stream. I took a water sample about 50 feet from the end of the culvert, using Quantab low range and chlorides were not detected. There were no injuries. The truck is being removed and clean up is to begin. |
1400615708 | 2014-05-20 | Casing String Witnessed | No Violations | On arrival of the location I found Aplhia-Hunter rig #9 running 9 5/8 inch casing to the depth of 1547 feet. Halliburton Energy Services will do the cementing. Established circulation, and circulated 25 bbls of cement to the surface. Good returns. |
1405352351 | 2014-07-14 | Drill / Deepen / Reopen | No Violations | On the date of my inspection, I spoke with the Eclipse Resources Company Man on site Ryan Bartholomew. The Nomac 245 rig re-spudded on 7/13/14. The rig is drilling ahead with a 8.75 inch bit at a depth of 5823 feet at the time of my inspection. |
1407246458 | 2014-08-01 | Drill / Deepen / Reopen | No Violations | On the date of inspection I spoke with Eclipse Resources Company Man Ryan Bartholomew. The Nomac 245 was drilling a 8.75 inch hole at a depth of 13,636 feet at the time of my inspection. |
1803305514 | 2016-12-15 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed the lease road in good repair and the gates to access the location were locked. With my arrival on location I witnesses I witnessed all wells on site are now in producing order. The permitted well bore is utilizing natural reservoir pressure for means of production. The production equipment that is on site consists of the following:
2- 500 barrel production tanks 7- Permitted well bores utilizing natural reservoir pressure 7- Gas production units equipped with internal heaters and sand separators 1- Low pressure separator system The site passed preliminary restoration in accordance with ORC 1509.072 A. |
720815914 | 2014-5-19 0:00: | CS | No Violations |
For data sources see[9]