Well Details

Well ID: 34-067-21284
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Stock Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000887
Farm/Lease Name: MADZIA UNIT
License Status: Producing
License Date: 2016-04-19
Spud Date: 2014-05-19
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-07-27
Well Total Depth: 14764.00 ft
Configuration: Horizontal
Latitude: 40.310000
Longitude: -81.080000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-30 Proposed Formations:POINT PLEASANT, Issued Date:1/30/2014, Expired Date:1/30/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2014-02-19 Proposed Formations:POINT PLEASANT, Issued Date:2/19/2014, Expired Date:2/19/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-07-27
Correction to Well 2015-06-19 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
APP 2016-04-19 Proposed Formations:POINT PLEASANT, Issued Date:4/19/2016, Expired Date:4/19/2018 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:TI
Completion Report Received 2016-12-27
Construction Permit Expires 2017-04-19
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/27/2016 09/16/2016 8185 13,294,000.0 78500

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Ingredients Listed Above Listed Above Water 7732-18-5 100 0.549402 702468
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.6089 110,739,000.0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2 Halliburton Proppant Listed Below Listed Below 0 0 0
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00002659 34
Olefins Proprietary 5 0.000220553 282
Crystalline silica, quartz 14808-60-7 100 12.8393 16,416,400.0
Ethylene oxide 75-21-8 0.1 0.00000078 1
Fatty acids, tall oil Proprietary 30 0.00054669 699
Hydrochloric acid 7647-01-0 15 0.0823312 105269
Methanol 67-56-1 60 0.0010926 1397
Acetic acid 64-19-7 60 0.000333176 426
Ethoxylated alcohols Proprietary 30 0.00054669 699
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.00054669 699
Alcohols, C12-13, ethoxylated 66455-14-9 30 0.000159549 204
Glycerine 56-81-5 5 0.00002659 34
Propargyl alcohol 107-19-7 10 0.00018223 233
Acetic anhydride 108-24-7 100 0.000553729 708
FDP-S1225-15 Halliburton Surfactant Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
HCL >10% Halliburton Solvent Listed Below Listed Below 0 0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-09-12 H2O 15 428069 Gal 444036 Halliburton STAGE 38/38

36 SHOTS

2016-08-27 H2O 15 325644 Gal 453098 Halliburton STAGE 1/38

45 SHOTS STAGES 2-37 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP 228555 33387 87
2017 ECLIPSE RESOURCES I LP 990261 68655 364
2018 ECLIPSE RESOURCES I LP 538456 12651 362
2019 ECLIPSE RESOURCES I LP 101063 1828 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP Brine 10563 87
2017 ECLIPSE RESOURCES I LP Brine 20918 364
2018 ECLIPSE RESOURCES I LP Brine 10078 362
2019 ECLIPSE RESOURCES I LP Brine 1730 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1005157214 2019-12-17 0:00 PW No Violations 1.00
-1026916586 2020-9-30 0:00: PW No Violations 0.20
-1376406859 2014-3-3 0:00:0 CS No Violations 1.00
-1803305514 2016-12-15 0:00 PL No Violations 1.00
-438173487 2014-7-22 0:00: DD No Violations 2.00
0438173487 2014-07-22 Drill / Deepen / Reopen No Violations On the date of inspection I spoke with Eclipse Resources Company Man Chad Rice. The Nomac 245 rig is drilling ahead at a depth of 13472 at the time of my inspection. Chad Rice expects to reach Total Depth late today 7/22/14 or early tomorrow 7/23/14. The construction contractor Whipstock is continuing to work along the access road dumping aggregate into the ditch line and installing culverts and sumps.
0720815914 2014-05-19 Casing String Witnessed No Violations On arrival on location Rig crew was running 13 3/8 inch casing to the depth of 389 feet. Halliburton Energy services was prepairing to cement casing to serface. Circulated 9 bbls of cement to surface.
1244471071 2014-07-11 Drill / Deepen / Reopen No Violations On the date of inspection I witnessed that the Nomac 245 was rigging up on the Madzia Unit 10H well. I spoke to the Eclipse Company Man on site for a status update. Nomac 245 plans to re-spud late tonight or early tomorrow morning. The 9.625 inch casing has been set and the rig will begin drilling an 8.75 inch hole for 5.5 inch production casing.
1342322170 2018-10-18 Production Wells No Violations
1376406859 2014-03-03 Casing String Witnessed No Violations Butches Rat hole Service drilled a 30 inch diameter hole to 110 ft and set 110 ft of 24 inch diameter casing. Halliburton Cementing Service c/w 290 sks of class A cement 15.6 and 1.22 with good returns. Pick up cement info this day for the job which was set 03/01/2014 when I was out of hours.
1400595879 2014-05-20 Non Well No Violations Eclipse Resources called to inform me that an 18 wheel tractor trailer had overturned leaving their lease road. The truck was hauling drill cuttings from the intermediate section of the well bore. The depth of that sections is from 400 ft to 1500 ft. Inspector Akins was on site and collected photos and tested the cuttings for chlorides. The cuttings were sampled using a quantab titration test strip. It did not register any chlorides. I met with Eclipse Resources Bruce Carpenter and Bill Radford and went over the cleanup details. They are to try and hydrate the cuttings and vacuum them up. The material which can not be vacuumed away will be slowed from release by absorbent booms which are in place.
1400597203 2014-05-20 Non Well No Violations I received a phone call from Josh Angleline with Eclipes Resources that a Waste Management truck hauling drill cutting had overturned at the bottom of the their lease road and the county road. On arrival of location, I found several booms had already been installed in the little stream that travels under the lease road. Bruce Carpenter from the Eclipes environmental department , and Steven Milles with Weavertown environmental group was on site. The drill cuttings were from the intermediate string section, 389 feet to 1560 feet. All fluids from the truck were contained around the truck and no fluids made it to the stream. I took a water sample about 50 feet from the end of the culvert, using Quantab low range and chlorides were not detected. There were no injuries. The truck is being removed and clean up is to begin.
1400615708 2014-05-20 Casing String Witnessed No Violations On arrival of the location I found Aplhia-Hunter rig #9 running 9 5/8 inch casing to the depth of 1547 feet. Halliburton Energy Services will do the cementing. Established circulation, and circulated 25 bbls of cement to the surface. Good returns.
1405352351 2014-07-14 Drill / Deepen / Reopen No Violations On the date of my inspection, I spoke with the Eclipse Resources Company Man on site Ryan Bartholomew. The Nomac 245 rig re-spudded on 7/13/14. The rig is drilling ahead with a 8.75 inch bit at a depth of 5823 feet at the time of my inspection.
1407246458 2014-08-01 Drill / Deepen / Reopen No Violations On the date of inspection I spoke with Eclipse Resources Company Man Ryan Bartholomew. The Nomac 245 was drilling a 8.75 inch hole at a depth of 13,636 feet at the time of my inspection.
1803305514 2016-12-15 Preliminary Restoration No Violations On the day of my inspection I witnessed the lease road in good repair and the gates to access the location were locked. With my arrival on location I witnesses I witnessed all wells on site are now in producing order. The permitted well bore is utilizing natural reservoir pressure for means of production. The production equipment that is on site consists of the following:

2- 500 barrel production tanks 7- Permitted well bores utilizing natural reservoir pressure 7- Gas production units equipped with internal heaters and sand separators 1- Low pressure separator system

The site passed preliminary restoration in accordance with ORC 1509.072 A.
720815914 2014-5-19 0:00: CS No Violations

For data sources see[9]

References