X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21269

Well Details

Well ID: 34-067-21269
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Cadiz Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: MILLER-HINES
License Status: Producing
License Date: 2013-12-04
Spud Date: 2014-01-09
Spud Drilling Contractor: PROD. WELL SERVICE
Final Drill Date: 2014-03-03
Well Total Depth: 6720.00 ft
Configuration: Vertical
Latitude: 40.280000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-12-04 Proposed Formations:EHINSTREET, MARCELLUS, CLINTON, Issued Date:12/4/2013, Expired Date:12/4/2015 12:00:00 PM, Drilling unit acres:75.09, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2014-01-10 CORRECTION TO CASING PROGRAM.
Correction to Well 2014-01-17 CORRECTION TO CASING PROGRAM
Reached Total Depth 2014-03-03
Construction Permit Expires 2015-12-04
Change of Owner 2016-07-25 Operator changed from 8844, ECLIPSE RESOURCES I LP to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-12 6476 6549 42
6476 6549 42
6476 6549 42

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-08-11 H2O 15 166205 Gal 121000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES-OHIO LLC 1060.00 142.00 365
2016 ECLIPSE RESOURCES-OHIO LLC 0.00 0.00 365
2017 M & R INVESTMENTS OHIO LLC 0.00 0.00 0
2018 M & R INVESTMENTS OHIO LLC 9585.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES-OHIO LLC Brine 161 365
2016 M & R INVESTMENTS OHIO LLC Brine 0 365
2017 M & R INVESTMENTS OHIO LLC Brine 0 0
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1719214731 2016-7-7 0:00:0 PL No Violations 1.00
-1802902252 2014-3-5 0:00:0 DD No Violations 1.00
-1965967251 2014-4-3 0:00:0 DD No Violations 1.00
-244193170 2014-1-21 0:00: DD No Violations 1.00
0108289662 2014-01-10 Drill / Deepen / Reopen No Violations I am checking on the site today because there was some problems with the casing string information on the permit. It did not have any string being set to cover the Intermediate section of the well. Today the drilling rig is on site and drilling at 245 ft. Should be ready later tonight to set surface casing. I met with the Tool Pusher on site and went over the corrections to the casing string depths and requirements.
0244193170 2014-01-21 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling status of NorthEast Drilling Rig and found that they are on location but are not drilling at this time. They plan to rig down and move so that the next rig can drill the Intermediate Section. No date on the next rig just thinks it will be soon.
0486062364 2014-02-03 Drill / Deepen / Reopen No Violations Northeast Drilling Rig is still on site but is not drilling. They are to move off so another larger rig can drill the next section of the well
108289662 2014-1-10 0:00: DD No Violations 2.00
1108064133 2014-01-30 Drill / Deepen / Reopen No Violations North East Drilling Rig is still on site but is not drilling and will move off so another rig can set the deeper Intermediate casing string.
1461074288 2016-04-19 Preliminary Restoration No Violations This well has two 110 bbl. Production tanks- 1- 50 bbl. plastic brine storage tank and a vertical separator. The well is powered with an electric motor operating an artificial lift that includes a pump jack rods and tubing. The pits are closed and the area has been graded and seeded with vegetation established. This site meets the requirements for the Preliminary Restoration.
1489314291 2019-9-10 0:00: PW No Violations 1.00
1719214731 2016-07-07 Preliminary Restoration No Violations Meets requirements for the approval of the preliminary restoration. Well is being operated using 2 -110 bbl. Production tanks a 50 bbl. brine storage tank along with a standup separator inside a dike. The well is operated with a pump jack rods and 2 3/8 inch diameter tubing.
1802902252 2014-03-05 Drill / Deepen / Reopen No Violations HAD Drilling Rig # 200 has reached total depth at 6720 ft in the 6.5 inch diameter hole and will be running 4-1/2 inch diameter casing and cementing later today.
1863860853 2014-01-13 Drill / Deepen / Reopen No Violations Northeast Drilling Rig # 1 has set and cemented the 9-5/8 inch diameter surface casing and is moving off so the next rig can begin drilling the intermediate section of the well.
1965967251 2014-04-03 Drill / Deepen / Reopen No Violations Pit liner was still in place and intact. Fluid levels were good at 3/4 full.
486062364 2014-2-3 0:00:0 DD No Violations 1.00

For data sources see[9]

References