If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21193 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000710 | |
Farm/Lease Name: WRIGHT 35-11-5 | |
License Status: Producing | |
License Date: 2014-06-19 | |
Spud Date: 2014-12-22 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-01-03 | |
Well Total Depth: 16791.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-24 | Proposed Formations:TRENTON/ BLACK RIVER, Issued Date:5/24/2013, Expired Date:5/24/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-02-27 | Proposed Formations:POINT PLEASANT, Issued Date:2/27/2014, Expired Date:2/27/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-06-19 | Proposed Formations:POINT PLEASANT, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-01-03 | |
Correction to Well | 2015-04-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2015-12-23 | |
Construction Permit Expires | 2016-06-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-12-23 | 8512 | 16540 | 800 |
8512 | 16540 | 800 | |
8512 | 16540 | 800 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/18/2015 | 05/02/2015 | 8061 | 5,957,070.0 | 569582 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 81.3711 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Aliphatic amine polymer | NA | 30 | 0.00796 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.07354 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.0001 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00039 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.09863 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00058 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00029 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00058 | 0 | ||||
Water | 007732-18-5 | 93 | 0.90704 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00029 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.01107 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00059 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00796 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01765 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.56636 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00038 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00882 | 0 | ||||
Water | 007732-18-5 | 85 | 0.06272 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00297 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.7532 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.0051 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.03402 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-04-18 | H2O | 8 | 5356 Bbl | 327101 | Schlumberger | STAGE 1/32
25 SHOTS STAGES 2-31 SEE IMAGES |
2015-05-02 | H2O | 8 | 3989 Bbl | 332030 | Schlumberger | STAGE 32/32
25 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 274185 | 34591 | 102 |
2016 | CHESAPEAKE EXPLORATION LLC | 429221 | 34924 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 236405 | 12790 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 172496 | 9151 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 37076 | 2016 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 13190 | 102 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 12660 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 7304 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 5229 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 703 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1684816749 | 2014-12-30 0:00 | DD | No Violations | 2.00 |
-1912118289 | 2019-11-29 0:00 | PW | No Violations | 1.00 |
0000632009 | 2015-01-06 | Drill / Deepen / Reopen | No Violations | On the date of inspection I was informed by Chesapeake consultant, Rodney Bean, that the 5.5 inch Production Casing was cemented the previous night. This was the last well scheduled to be drilled on the Wright pad. The Patterson 261 rig was in the process of rigging down and will be moving out of Ohio. |
0314100058 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 low pressure separator/ Vapor recovery system 4 compressors 2 NGL tanks The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0827559450 | 2015-05-28 | Preliminary Restoration | No Violations | On this date I am on site to conduct an inspection on the well site for Preliminary Restoration. The well passes for Preliminary Restoration per ORC 1509.072(A). |
1419541974 | 2014-12-23 | Casing String Witnessed | No Violations | On the date of inspection I am on site to witness the surface casing cemented to surface. I was informed by Chesapeake consultant, Gary McKee, that the Patterson 261 rig drilled a 17.5 inch diameter hole to a total depth of 590 feet. Wyoming Casing Service set 13.375 inch casing weighing 54.50lbs/ft to 580 feet. O-Tex Pumping, LLC pumped 540sk of Class H cement, 15.6 pg, 1.2 yield, 2% CaCl2, 0.4% C-41P, and 0.25lbs/sk. O-Tex displaced cement with 82bbl of fresh water, bumped plug, floats held, 24bbl of cement returned to surface and stayed at surface while I was on location. |
1621573128 | 2018-10-18 | Production Wells | No Violations | |
1684816749 | 2014-12-30 | Drill / Deepen / Reopen | No Violations | On the date of inspection I was informed by Chesapeake consultant, Gary McKee, that the Patterson 261 rig was currently drilling ahead in the 8.5 inch diameter horizontal. The rig was at a depth of 10,256 feet. Gary McKee informed me that the rig would most likely reach Total Depth later in the week and would be rigging down to move out of Ohio. |
314100058 | 2016-2-22 0:00: | PL | No Violations | 0.50 |
632009 | 2015-1-6 0:00:0 | DD | No Violations | 1.50 |
827559450 | 2015-5-28 0:00: | PL | No Violations | 0.20 |
For data sources see[10]