If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21188 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000710 | |
Farm/Lease Name: WRIGHT 35-11-5 | |
License Status: Producing | |
License Date: 2014-06-19 | |
Spud Date: 2014-12-03 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-12-18 | |
Well Total Depth: 16256.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-21 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-02-27 | Proposed Formations:POINT PLEASANT, Issued Date:2/27/2014, Expired Date:2/27/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-06-19 | Proposed Formations:POINT PLEASANT, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-12-18 | |
Correction to Well | 2015-04-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2016-01-08 | |
Construction Permit Expires | 2016-06-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-01-08 | 8482 | 16005 | 940 |
8482 | 16005 | 940 | |
8482 | 16005 | 940 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/18/2015 | 05/04/2015 | 8076 | 6,899,210.0 | 671351 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.4862 | 0 |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.61028 | 0 | |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00501 | 0 | |
Ammonium Sulfate | 007783-20-2 | 30 | 0.00809 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00809 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01729 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00059 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 17.0625 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00028 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.0939 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00009000 | 0 | ||||
Water | 007732-18-5 | 93 | 0.86447 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00865 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.07009 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00058 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.58363 | 0 | ||||
Water | 007732-18-5 | 85 | 0.09166 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00058 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00028 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.01618 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00038 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00292 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.0004 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-05-04 | H2O | 0 | 3878 Bbl | 324115 | Performance Technologies | STAGE 38
25 SHOTS |
2015-04-18 | H2O | 0 | 4738 Bbl | 330460 | Performance Technologies | STAGE 1/38
25 SHOTS STAGES 2-37 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 239984 | 30014 | 97 |
2016 | CHESAPEAKE EXPLORATION LLC | 463938 | 36744 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 247674 | 15147 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 175637 | 8823 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 40851 | 1988 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 9733 | 97 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 12083 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3981 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 0 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 631 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1407426351 | 2014-12-4 0:00: | CS | No Violations | 7.00 |
-1537628859 | 2014-7-2 0:00:0 | CS | No Violations | 3.00 |
0406641770 | 2014-12-08 | Drill / Deepen / Reopen | No Violations | On the date of inspection I was on site to speak with the Chesapeake consultant about the complaint that had been issued from an adjacent landowner. Patterson 261 is the rig on site. The landowner, Amy McAfee, had stated that she was able to detect odors of windex and rotten eggs at her home and that there was white dust accumulating on her lawn furniture over the past few months. I spoke with Chesapeake consultant, Rodney Bean. He stated that the white dust could have been from the lime that is used to mix with drill cuttings in order to solidify them and haul them away. It is likely that the wind had carried over small amounts of lime to the adjacent landowners property. Mixing lime with drill cuttings is unavoidable in order to haul drill cuttings away. When I have been on site over the past few months for inspections, I had not noticed any odors outside of the normal operations. Rodney Bean informed me that they had not had any H2S alarms go off over the course of drilling. I called the phone number provided by Amy McAfee on two occasions and left messages explaining what I had found and that she was free to call me back to discuss. The Patterson 261 rig was currently drilling an 8.5 inch diameter hole at a depth of 2448 feet. There is one well left to be drilled after the current well. |
0869576143 | 2015-05-28 | Preliminary Restoration | No Violations | On this date I am on site to conduct an inspection on the well site for Preliminary Restoration. The well passes for Preliminary Restoration per ORC 1509.072(A). |
1404318595 | 2014-07-02 | Casing String Witnessed | No Violations | Express Drilling drilled a 26 inch diameter hole to 120 ft and set 120 ft of 20 inch diameter casing. Express Cementing Service cemented with 230 sacks of class A cement at 15.6 lbs and a yield of 1.18. Circulation was established and they had 10 bbls of cement returns. |
1407426351 | 2014-12-04 | Casing String Witnessed | No Violations | On the date of inspection I was informed by Chesapeake consultant, Rodney Bean, that the Patterson 261 rig had drilled a 17.5 inch diameter hole to a depth of 608 feet. Wyoming Casing Services set 599 feet of 13.375 inch diameter, 54.50lbs/ft casing in the hole. O-Tex Pumping, LLC pumped 540sk of Class H cement, 15.6ppg, 1.2 yield, 2% CaCl2, 0.4% C-41P, and 0.25lbs/sk of Cello Flake. O-Tex displaced cement with 85bbl of fresh water. 17bbl of cement returned to surface and stayed at surface while I was on site. |
1537628859 | 2014-07-02 | Casing String Witnessed | No Violations | On the date of inspection, I accompanied ODNR Inspector Mark Moreland to witness the running and cementing of the 20 conductor casing. Express Drilling drilled a 26 hole to a depth of 120 and set 120 of 94# casing. Express Cementing Service cemented with 230sks Class A at 15.6# and yield of 1.18. Company man present on site is Brett Farnsworth. Express Energy Services established circulation in hole before cementing and received 10bbl of cement back to surface. Cement stayed to surface while I was on site. |
1675772115 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 low pressure separator/ Vapor recovery system 4 compressors 2 NGL tanks The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1973285307 | 2018-10-18 | Production Wells | No Violations | |
406641770 | 2014-12-8 0:00: | DD | No Violations | 2.00 |
735398660 | 2019-11-29 0:00 | PW | No Violations | 1.00 |
869576143 | 2015-5-28 0:00: | PL | No Violations | 0.20 |
For data sources see[10]