34-067-21157

Well Details

Well ID: 34-067-21157
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000698
Farm/Lease Name: GUSTINA-BEAR
License Status: Producing
License Date: 2013-05-29
Spud Date: 2013-11-15
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2013-11-28
Well Total Depth: 15598.00 ft
Configuration: Horizontal
Latitude: 40.190000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-03-20 Proposed Formations:TRENTON, Issued Date:3/20/2013, Expired Date:3/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-04-29 Proposed Formations:POINT PLEASANT, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:706.937, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-05-29 Proposed Formations:POINT PLEASANT, Issued Date:5/29/2013, Expired Date:5/29/2015 12:00:00 PM, Drilling unit acres:706.937, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-11-28
Construction Permit Expires 2015-05-29
Completion Report Received 2016-04-29
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/30/2014 02/05/2014 8178 6,330,890.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
Entecide QG40 U.S. Water Breaker ETHANOL 64-17-5 2.8 0 0
n-ALKYL DIMETHYL BENZYL AMMONIUM CHLORIDE 68424-85-1 5.5 0 0
DIDECYL DIMETHYL AMMONIUM CHLORIDE 7173-51-5 8.3 0 0
Water 7732-18-5 56.4 0 0
GLUTARALDEHYDE 111-30-8 27 0 0
FRA-407 Weatherford Friction Reducer Water 7732-18-5 55 0.05082 0
Ammonium acetate 631-61-8 5 0.00462 0
Petroleum distillates, hydrotreated light 64742-47-8 40 0.03696 0
Fresh water Stingray Carrier Water 7732-18-5 100 89.8315 0
IC-250 Stingray Corossion Inhibitor Proprietary polycarboxylic acid mixture Not Available 20 0 0
Water 7732-18-5 80 0 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.686095 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0 0
Entegrate FR 7170 U.S. Water Friction Reducer Petroleum distillate hydrotreated light 64742-47-8 28 0 0
Alcohols (C10-16), ethoxylated 68002-97-1 3.1 0 0
Water 7732-18-5 48 0 0
Ammonium chloride 12125-02-9 15 0 0
Alcohols (C12-16), ethoxylated 68551-12-2 3.1 0 0
C12-C14 Alcohol ethoxylated 68439-50-9 3.1 0 0
X-linker Stingray Guar Gel Ethylene Glycol Not Available 30 0 0
Water 7732-18-5 70 0 0
PROCLEAN 200 U.S. Water Corossion Inhibitor Water 7732-18-5 48 0.00091 0
Citric Acid, Food Grade 77-92-9 52 0.00099 0
Entegrate SC8060 WB U.S. Water Scale Inhibitor 2-propenoic acid, sodium salt, polymer 37350-42-8 10 0.00092 0
Aminotrimethylene Phosphonic Acid 6419-19-8 10 0.00092 0
Phosphoric Acid 7664-38-2 1 0.00009000 0
Water 7732-18-5 59 0.00542 0
Methyl Alcohol 67-56-1 20 0.00184 0
Entegrate NE 1100 U.S. Water Demulsifier Water 7732-18-5 60 0.02544 0
Ethylene/Propylene Oxide Polymer Not Available 40 0.01696 0
BioClear 5000 Weatherford Biocide 2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00117 0
Water 7732-18-5 95 0.02227 0
FRA-405 Weatherford Friction Reducer Sodium Chloride 7647-14-5 10 0 0
Ammonium chloride 12125-02-9 7 0 0
Petroleum Distillate 64742-47-8 40 0 0
Water 7732-18-5 36 0 0
Alcohol, C12-16, Ethoxilated 68551-12-2 7 0 0
Clean Gel Stingray Guar Gel heavy aliphatic Not Available 35 0 0
Solvent naphtha, (petroleum) 64742-96-7 65 0 0
Citric Acid 50% Pace International Acid citric acid 77-92-9 50 0.169846 0
Water 7732-18-5 50 0.169846 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 9.24808 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION 485518 40850 234
2015 GULFPORT ENERGY CORPORATION 450376 17664 317
2016 GULFPORT ENERGY CORPORATION 257615 5245 361
2017 GULFPORT ENERGY CORPORATION 183095 2953 359
2018 GULFPORT ENERGY CORPORATION 166748 2349 363
2019 GULFPORT ENERGY CORPORATION 31351 502 90

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION Brine 4046 234
2015 GULFPORT ENERGY CORPORATION Brine 2096 317
2016 GULFPORT ENERGY CORPORATION Brine 1060 361
2017 GULFPORT ENERGY CORPORATION Brine 813 359
2018 GULFPORT ENERGY CORPORATION Brine 485 363
2019 GULFPORT ENERGY CORPORATION Brine 110 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1425791446 2019-12-9 0:00: PW No Violations 1.00
-1434313732 2013-12-2 0:00: DD No Violations 2.00
-173121474 2013-9-18 0:00: DD No Violations 1.50
-333229163 2013-5-31 0:00: DD No Violations 2.50
-437809206 2015-12-10 0:00 PW No Violations 2.00
-894596816 2013-8-8 0:00:0 DD No Violations 1.20
0095136515 2014-03-03 Preliminary Restoration No Violations I accompanied Doug Bennett to location for preliminary site inspection. Refer to Doug Bennetts inspection report for further details.
0141729446 2013-11-21 Drill / Deepen / Reopen No Violations
0173121474 2013-09-18 Drill / Deepen / Reopen No Violations I am on site today to witness the containment being installed. There is a 24 mil fabric liner going down first and a 60 mm plastic liner will go over top of the fabric.
0333229163 2013-05-31 Drill / Deepen / Reopen No Violations I received a call from Anthony Miller of Gulfport Energy to advise me that there may a problem with this drilling site. He called to advise of a possible contamination problem occurring on this drilling pad. He was not sure of the source of the contamination or how big of a problem it was. I was later contacted by Deputy Chief Bob Worstall asking me to conduct an inspection of this site. I am working with Kyle Baldwin to collect fluid samples and photographs to send to our lab . Kyle collected water samples at 40.19040 -081.18607 and at 40.19025 -081.8118626 . A quantab titration test for chlorides was conducted and the field results indicated that the chloride range was in excess of 28,000 PPM. Kyle collected all of the samples and then transported them to our lab in Cambridge for further testing. There has been no corrective action taken at this time until results from the Cambridge lab are complete.
0437809206 2015-12-10 Production Wells No Violations On the day of my inspection accompanying ODNR Inspector Joe Zollars following up on NOV-1370347259 and 33229163, I witnessed the well was equipped with a production tree with valves in the open position. Production equipment included a sand trap, a line heater, a separator, a compressor unit, a vapor recovery system, 9-400bbl tanks and 1-500bbl tank all within containment and a gas combustor. Samples taken from the sump and field tested revealed a pH of 7 and 52ppm chlorides with well-
0450900197 2013-09-16 Drill / Deepen / Reopen No Violations I was advised that containment was to begin on this pad. I found rolls of liner are location but nobody is on site and there is no work being done at this time.
0555891122 2013-10-07 Drill / Deepen / Reopen No Violations I am on site today and found that Sidewinder 121 is moving in and should be ready to drill in the next day or so. Containment is in place and location is dry
0894596816 2013-08-08 Drill / Deepen / Reopen No Violations I arrived today to find that the perimeter containment system is 90% in place. There are no rigs or equipment on site other than the equipment being used for the remediation of this site.
1055382172 2013-06-07 Drill / Deepen / Reopen No Violations I am on site today to check the containment system for the remediation of this drilling pad. I found that the liner has two places where it has collapsed. There are two water trucks on site and I advised them to pump off the fluid. I advised Nick Berelsman to repair the collapsed sections. Where the liner collapsed it also will need to be patched together. I Remained on site until the fluid was pumped off and the liner repaired.
1211570958 2016-12-02 Production Wells No Violations I am on site today to perform a routine status check of the well bore and the well location. On the day of my inspection I witnessed the lease load was in good repair and the gates for the location were locked. After inspecting the well bore I discovered no high annular pressures and that the well was in producing order. With the inspection of the location I discovered that Gulfport is utilizing the site to hold cinders for their lease roads. Also with the inspection I did not discover any indications of pollution or contamination.
1366949079 2013-04-25 Drill / Deepen / Reopen No Violations On the day of my inspection Redstone Conductor 1 had finished conductor hole and Stingray was cementing conductor pipe. See Cement ticket. No violations noted.
1370347259 2013-06-03 Drill / Deepen / Reopen Violations Noted Met with Deputy Chief Bob Worstall and Supervisor Tom Hill on site. The inspection was for Bob to see the amount of contamination and try to understand how the contamination occurred. The contaminated soil is to be removed and replaced with clean fill . The containment plastic is to be removed and the area below excavated to a point where there is no contaminated soil. The rock can be stored and put back in place after the contamination has been removed. A sump area with a liner shall be installed below the rock area to catch any remaining contamination which may run off of the rocks. The fluids contained in the sump will be removed to an approved U.I.C Injection site until contamination is below 250 P.P.M. Vegetation shall be established in all of the effected area outside of the rocked pad.
1371061861 2013-06-06 Drill / Deepen / Reopen No Violations My inspection today is to see how the containment system functioned in collecting runoff from the contaminated drilling pad. I found that the containment is in place and still has some fluid running under the liner on the containment. I advised Nick Berelsman that fluid was under the liner and he is to have them vacuum it out and set the liner back in place. Next I drew up a grid system on the pad to try and determine the amount of contamination. I had the backhoe dig down through the rock pad and below the fabric liner. When I was deep enough to see fluid I collected samples and ran a low range quantab titration test on the samples. I was able to determine that a portion as large as 75 % of the pad had chloride contamination above the low end limits which is above 636 P.P.M.
1393854664 2014-03-03 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
141729446 2013-11-21 0:00 DD No Violations
1434313732 2013-12-02 Drill / Deepen / Reopen No Violations
1449777569 2015-12-15 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett following up on NOV-1370347259 and 33229163, I witnessed the well was equipped with a production tree with valves in the open position. Production equipment included a sand trap, a line heater, a separator, a compressor unit, a vapor recovery system, 9-400bbl tanks and 1-500bbl tank all within containment and a gas combustor. Samples taken from the sump and field tested revealed a pH of 7 and 52ppm chlorides with well-
1470514256 2013-06-26 Drill / Deepen / Reopen No Violations I am inspecting the site today because of the big storm which rocked the area dropping 4 inches of rain. I arrived to find that the sump area of the control dike has collapsed. The entire dike is full of fluid and there are two places that need repairs. I contacted Chad Shaffner and advised. I returned later in the day and found that the fabric in the sump has been repaired and that the fluid has been pumped off. The containment system is back in operation.
1815834945 2016-04-21 Production Wells No Violations This well has corrected all of the violations and is back in operation.
450900197 2013-9-16 0:00: DD No Violations 1.00
555891122 2013-10-7 0:00: DD No Violations 1.00
95136515 2014-3-3 0:00:0 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1370347259 US-OH-110934 2013-06-26 Drilling operation causing pollution and contamination

For data sources see[8]