34-067-21140

Well Details

Well ID: 34-067-21140
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000513
Farm/Lease Name: RYSER
License Status: Producing
License Date: 2013-03-27
Spud Date: 2013-04-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-07-18
Well Total Depth: 14374.00 ft
Configuration: Horizontal
Latitude: 40.210000
Longitude: -81.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-02-27 Proposed Formations:TRENTON, Issued Date:2/27/2013, Expired Date:2/27/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-03-27 Proposed Formations:POINT PLEASANT, Issued Date:3/27/2013, Expired Date:3/27/2015 12:00:00 PM, Drilling unit acres:511.058, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-07-18
Completion Report Received 2014-02-05
Correction to Well 2014-03-27 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 1107.017 ACRES AND TARGET ELEVATION CHANGED.
Construction Permit Expires 2015-03-27
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-06 8425 14265 0
8425 14265 0
8425 14265 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/13/2013 09/13/2013 7949.47 10,662,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh water Stingray Carrier Water 7732-18-5 100 87.1016 0
FR-403 Weatherford Friction Reducer Water 7732-18-5 60 0.07032 0
Distillates, Petroleum, Hydrotreated Light 64742-47-8 20 0.02344 0
Sodium Chloride 7647-14-5 20 0.02344 0
BioClear 5000 Weatherford Biocide 2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00126 0
Water 7732-18-5 95 0.02387 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 11.707 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.56835 0
OB-2 Stingray Encapsulated Breaker Ammonium persulfate 7727-54-0 75 0.00671 0
Silica, Crystalline-Quartz 14808-60-7 10 0.0009 0
Cured acrylic resin NA 16 0.00143 0
ScaleClear 112 Weatherford Scale Inhibitor Polymer Based NA 100 0.00107 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
Clean Gel Stingray Guar Gel heavy aliphatic NA 35 0.02827 0
Solvent naphtha, (petroleum) 64742-96-7 65 0.0525 0
Per Break Stingray Persulfate Breaker Ammonium Persulfate 7727-54-0 99 0.00908 0
Acid Inhibitor Stingray Corossion Inhibitor Water 7732-18-5 40 0.00038 0
Proprietary polycarboxylic acid mixture NA 60 0.00058 0
FRS 51 Weatherford Non-Emulsifier Methyl Alcohol 67-56-1 40 0.01456 0
N-dodecyl-2-pyrrolid one 2687-96-9 2.5 0.00091 0
Water 7732-18-5 42.5 0.01547 0
Alcohols, C6-C12, ethoxylated 68439-45-2 15 0.00546 0
Hydrochloric Acid 10 -15% Stingray Acid Hydrochloric Acid NA 15 0.05151 0
Water 7732-18-5 85 0.29192 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-09-24 H2O 15 430261 Gal 804840 STINGRAY PRESSURE PUMPING LLC STAGE 20

60 SHOTS

2013-09-14 H2O 15 356777 Gal 131744 STINGRAY PRESSURE PUMPING LLC STAGE 3

60 SHOTS

2013-09-25 H2O 15 438866 Gal 585000 STINGRAY PRESSURE PUMPING LLC STAGE 22

60 SHOTS

2013-09-23 H2O 15 409840 Gal 498725 STINGRAY PRESSURE PUMPING LLC STAGE 15

60 SHOTS

2013-09-24 H2O 15 468544 Gal 729640 STINGRAY PRESSURE PUMPING LLC STAGE 19

60 SHOTS

2013-09-13 H2O 15 585341 Gal 806653 STINGRAY PRESSURE PUMPING LLC STAGE 1

60 SHOTS

2013-09-16 H2O 15 415250 Gal 624600 STINGRAY PRESSURE PUMPING LLC STAGE 8

60 SHOTS

2013-09-24 H2O 15 469262 Gal 802289 STINGRAY PRESSURE PUMPING LLC STAGE 18

60 SHOTS

2013-09-15 H2O 15 492647 Gal 854000 STINGRAY PRESSURE PUMPING LLC STAGE 7

60 SHOTS

2013-09-26 H2O 15 511283 Gal 718830 STINGRAY PRESSURE PUMPING LLC STAGE 23

60 SHOTS

2013-09-15 H2O 15 582666 Gal 799710 STINGRAY PRESSURE PUMPING LLC STAGE 6

60 SHOTS

2013-09-21 H2O 15 500968 Gal 607539 STINGRAY PRESSURE PUMPING LLC STAGE 12

60 SHOTS

2013-09-15 H2O 15 446695 Gal 805175 STINGRAY PRESSURE PUMPING LLC STAGE 4

60 SHOTS

2013-09-22 H2O 15 640513 Gal 747248 STINGRAY PRESSURE PUMPING LLC STAGE 14

60 SHOTS

2013-09-25 H2O 15 379861 Gal 738191 STINGRAY PRESSURE PUMPING LLC STAGE 21

60 SHOTS

2013-09-16 H2O 15 500854 Gal 693082 STINGRAY PRESSURE PUMPING LLC STAGE 10

60 SHOTS

2013-09-23 H2O 15 517217 Gal 613374 STINGRAY PRESSURE PUMPING LLC STAGE 16

60 SHOTS

2013-09-17 H2O 15 443440 Gal 725000 STINGRAY PRESSURE PUMPING LLC STAGE 11

60 SHOTS

2013-09-16 H2O 15 413797 Gal 801000 STINGRAY PRESSURE PUMPING LLC STAGE 9

60 SHOTS

2013-09-13 H2O 15 369810 Gal 686630 STINGRAY PRESSURE PUMPING LLC STAGE 2

60 SHOTS

2013-09-22 H2O 15 423272 Gal 489175 STINGRAY PRESSURE PUMPING LLC STAGE 13

60 SHOTS

2013-09-26 H2O 15 96713 Gal 31932 STINGRAY PRESSURE PUMPING LLC STAGE 24

60 SHOTS

2013-09-23 H2O 15 437081 Gal 628652 STINGRAY PRESSURE PUMPING LLC STAGE 17

60 SHOTS

2013-09-15 H2O 15 307314 Gal 476000 STINGRAY PRESSURE PUMPING LLC STAGE 5

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 91094 15121 46
2014 GULFPORT ENERGY CORPORATION 508462 65492 350
2015 GULFPORT ENERGY CORPORATION 224487 25618 356
2016 GULFPORT ENERGY CORPORATION 164614 12964 364
2017 GULFPORT ENERGY CORPORATION 132393 8975 356
2018 GULFPORT ENERGY CORPORATION 108628 7243 357
2019 GULFPORT ENERGY CORPORATION 27020 1649 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 8309 46
2014 GULFPORT ENERGY CORPORATION Brine 15418 350
2015 GULFPORT ENERGY CORPORATION Brine 4690 356
2016 GULFPORT ENERGY CORPORATION Brine 4220 364
2017 GULFPORT ENERGY CORPORATION Brine 3503 356
2018 GULFPORT ENERGY CORPORATION Brine 2433 357
2019 GULFPORT ENERGY CORPORATION Brine 590 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1322188697 2013-4-25 0:00: CS No Violations 6.50
-1645885201 2013-8-26 0:00: PW No Violations 1.00
-2053880283 2020-3-6 0:00:0 PW No Violations 1.00
-75234875 2018-12-13 0:00 PW No Violations 1.00
0075234875 2018-12-13 Production Wells No Violations On the day of my inspection I was accompanied by Deputy Chief Bob Worstall and Inspector John Fleming. This pad contains four properly labeled producing wellheads. Production equipment includes twelve 400 barrel steel tanks in their own polymer lined steel containment, one 50 barrel steel tank, four GPUs, four sand seperators, and a combustor. Surface annular pressure is 50 and intermediate annular pressure is 0. Production records are current in RBDMS.
0089788491 2013-10-07 Production Wells No Violations I am checking on this site today to see what type of activity is going on. They had been fracing on site the last few days but all of the equipment in gone.
0225300683 2017-08-22 Production Wells No Violations On the day of my inspection I found this pad to have four producing wells, twelve 400 barrel steel tanks, four gas production units and four sand seperators. Surface and intermediate annulas has no pressure.
0248903018 2014-01-23 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A. Prior issues have been corrected.
0309901991 2013-06-25 Drill / Deepen / Reopen No Violations I am returning later today to check the containment system which was to be completed last night. I found that it needs to be expanded because it is not wide enough to catch the entire contents. I contacted Chad Shaffner and advised. I then met with Triple A services and went over the revised containment with Brad Allar. We marked off the area to be included and reviewed how to tie the system together. I remained on site while modifications were made and advised that they could begin drilling now that the containment is in place.
0316045938 2013-04-12 Drill / Deepen / Reopen No Violations I am on site today to witness the running and the cementing of the 26 inch casing string. Redstone Drilling Service drilled a 32 inch diameter hole to 116 ft and installed 116 ft of casing. Stingray Cementing Service c/w 290 sks. The job was running behind and I was not able to witness the cementing of the casing. I also had a problem with RBDMS and could not open the file to complete my report.
0800205211 2013-08-22 Production Wells No Violations I am on site to check on the containment system which is being installed around the entire well pad. It does not appear that any more work has been completed on the containment. There is a backhoe on site which is digging up the area where the secondary containment was set up to contain fluid leaking out from under the containment while the well was drilled.
1173141438 2013-04-24 Casing String Witnessed No Violations I am on site tonight to witness the running and cementing of the 16 inch diameter casing. Yost Drilling # 3 has drilled a 20 inch diameter hole to 430 ft and set 405 ft of casing. Schlumberger Cementing Service will cement to surface with 483 sks of class A cement. During the installation of the casing the power tongs broke down and another one will takes several hours to arrive.
1322188697 2013-04-25 Casing String Witnessed No Violations I am on site again to witness the running and cementing of the 16 inch diameter casing string. During the installation of the casing string early last night the power tongs broke down and I left at 2:00 am. The casing was installed to 405 ft in a 430 ft hole and cemented by Schlumberger Cementing Service with 483 sks of Class A cement. Had 25 bbls of good cement returns.
1343467810 2013-12-10 Preliminary Restoration No Violations On the day of my inspection I witnessed that the well had been completed and was in production. I found no identification at the wellhead and flow back sand was still on site in half rounds which were covered and in containment. Sand has been tested and is in the process to be removed from location. Made call to Adam Ferett Gulfport Production Superintendent about identification and he is getting an updated ID list and will address the issue.
1372165142 2013-06-24 Drill / Deepen / Reopen Violations Noted I am responding to a spill which was reported by Gulfport Energy. I was advised that after the rig was moved to the next well the rig was washed down and that the rig crew saw fluid running under the containment. I arrived and found that fluid which had chlorides in the range of 2660 P.P.M. was running from under the pad containment. It is running along the entire length of the pad where the flare stack and half round tanks are located. I collected samples and transported them to our lab in Cambridge.
1372166982 2013-06-25 Drill / Deepen / Reopen No Violations I arrived today to find that the secondary containment which was to be established below the drilling pad toward the 1/2 round tanks and flare stack, is not in place. The containment which is set up at this point will not keep more than 1/2 of the pad from leaking off site. I met with two company men from Gulfport and went over what would be needed to ensure containment . Triple A is to return to complete the remaining containment controls.
1372290539 2013-06-26 Drill / Deepen / Reopen No Violations I am on site today to check on the containment system which was installed to catch chloride contamination. I found that the containment system had fluid running under it and that the liner had a hole. Advised Chad Shaffner of the liner leak and need to pump off fluid from under the liner. I also was informed that 10 to 15 gallons of Aqua Foam drilling soap had been spilled on the rock pad. There is a vacuum truck on site and it is vacuuming the soap up during my inspection. Before I left the site I made sure the soap was cleaned up and the liner repaired.
1645885201 2013-08-26 Production Wells No Violations I am on site today to check on the containment system installed on this pad. I found that they placed a limestone cap stone down on 80% of the drilling pad and that the secondary containment system I installed after a brine spill has been removed and the area backfilled and graded.
1781481024 2016-04-21 Production Wells No Violations This well has corrected all of the violations and is now back in operation. The pollution and contamination has been removed
225300683 2017-8-22 0:00: PW No Violations 1.00
248903018 2014-1-23 0:00: PL No Violations 1.00
309901991 2013-6-25 0:00: DD No Violations 2.50
316045938 2013-4-12 0:00: DD No Violations 3.00
695424411 2019-12-10 0:00 PW No Violations 1.00
800205211 2013-8-22 0:00: PW No Violations 1.50
89788491 2013-10-7 0:00: PW No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1372165142 US-OH-110999 2013-06-25 Drilling operation causing pollution and contamination

For data sources see[10]