X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21113

Well Details

Well ID: 34-067-21113
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000394
Farm/Lease Name: BK STEPHENS
License Status: Producing
License Date: 2012-10-25
Spud Date: 2013-02-22
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2013-06-03
Well Total Depth: 14246.00 ft
Configuration: Horizontal
Latitude: 40.180000
Longitude: -81.160000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-10-25 Proposed Formations:POINT PLEASANT, Issued Date:10/25/2012, Expired Date:10/25/2014 12:00:00 PM, Drilling unit acres:212480, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-03-22 CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 567.544 ACRES.
Correction to Well 2013-04-26 CORRECTION TO CASING PROGRAM
Reached Total Depth 2013-06-03
Completion Report Received 2014-02-06
Construction Permit Expires 2014-10-25
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-10 8678 14068 0
8678 14068 0
8678 14068 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/02/2013 09/10/2013 8106 7,102,960.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.01993 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00105 0
Hydrochloric Acid 10 -15% Stingray Acid Hydrochloric Acid NA 15 0.05909 0
Water 7732-18-5 85 0.33487 0
Acid Inhibitor Stingray Corossion Inhibitor Proprietary polycarboxylic acid mixture NA 60 0.00066 0
Water 7732-18-5 40 0.00044 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.58818 0
ScaleClear 112 Weatherford Scale Inhibitor Polymer Based NA 100 0.00112 0
Clean Gel Stingray Guar Gel heavy aliphatic NA 35 0.02248 0
Solvent naphtha, (petroleum) 64742-96-7 65 0.04174 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0.00125 0
OB-2 Stingray Breaker Cured acrylic resin NA 16 0.0006 0
Silica, Crystalline-Quartz 14808-60-7 10 0.00038 0
Ammonium persulfate 7727-54-0 75 0.00284 0
Fresh water Stingray Carrier Water 7732-18-5 100 85.1634 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
FRS 51 Weatherford Non-Emulsifier Alcohols, C6-C12, ethoxylated 68439-45-2 15 0.00613 0
N-dodecyl-2-pyrrolid one 2687-96-9 2.5 0.00102 0
Methyl Alcohol 67-56-1 40 0.01634 0
Water 7732-18-5 42.5 0.01736 0
FR-403 Weatherford Friction Reducer Water 7732-18-5 60 0.04577 0
Sodium Chloride 7647-14-5 20 0.01526 0
Distillates, Petroleum, Hydrotreated Light 64742-47-8 20 0.01526 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 13.6448 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-09-05 H2O 15 346080 Gal 531000 STINGRAY PRESSURE PUMPING LLC STAGE 5

60 SHOTS

2013-09-08 H2O 15 619668 Gal 716783 STINGRAY PRESSURE PUMPING LLC STAGE 9

60 SHOTS

2013-10-09 H2O 15 389214 Gal 547875 STINGRAY PRESSURE PUMPING LLC STAGE 14

60 SHOTS

2013-10-08 H2O 15 437472 Gal 707686 STINGRAY PRESSURE PUMPING LLC STAGE 11

60 SHOTS

2013-09-01 H2O 15 359730 Gal 667307 STINGRAY PRESSURE PUMPING LLC STAGE 1

60 SHOTS

2013-09-07 H2O 15 449442 Gal 636416 Trican STAGE 7

60 SHOTS

2013-09-08 H2O 15 536970 Gal 576352 STINGRAY PRESSURE PUMPING LLC STAGE 8

60 SHOTS

2013-10-08 H2O 15 496230 Gal 700000 STINGRAY PRESSURE PUMPING LLC STAGE 12

60 SHOTS

2013-10-10 H2O 15 444444 Gal 689580 STINGRAY PRESSURE PUMPING LLC STAGE 17

60 SHOTS

2013-09-05 H2O 15 221172 Gal 415000 STINGRAY PRESSURE PUMPING LLC STAGE 4

60 SHOTS

2013-10-09 H2O 15 317352 Gal 432571 STINGRAY PRESSURE PUMPING LLC STAGE 15

60 SHOTS

2013-10-09 H2O 15 439740 Gal 588420 STINGRAY PRESSURE PUMPING LLC STAGE 16

60 SHOTS

2013-10-08 H2O 15 404796 Gal 700000 STINGRAY PRESSURE PUMPING LLC STAGE 13

60 SHOTS

2013-10-07 H2O 15 514458 Gal 693038 STINGRAY PRESSURE PUMPING LLC STAGE 10

60 SHOTS

2013-09-06 H2O 15 273378 Gal 329000 STINGRAY PRESSURE PUMPING LLC STAGE 6

60 SHOTS

2013-09-03 H2O 15 469602 Gal 256326 STINGRAY PRESSURE PUMPING LLC STAGE 2

60 SHOTS

2013-09-04 H2O 15 383208 Gal 720000 Trican STAGE 3

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 134498 16160 57
2014 GULFPORT ENERGY CORPORATION 531348 30377 347
2015 GULFPORT ENERGY CORPORATION 225747 9065 358
2016 GULFPORT ENERGY CORPORATION 166190 3998 359
2017 GULFPORT ENERGY CORPORATION 117751 3034 360
2018 GULFPORT ENERGY CORPORATION 99348 3163 361
2019 GULFPORT ENERGY CORPORATION 23497 639 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 9672 57
2014 GULFPORT ENERGY CORPORATION Brine 10322 347
2015 GULFPORT ENERGY CORPORATION Brine 2579 358
2016 GULFPORT ENERGY CORPORATION Brine 981 359
2017 GULFPORT ENERGY CORPORATION Brine 1554 360
2018 GULFPORT ENERGY CORPORATION Brine 1252 361
2019 GULFPORT ENERGY CORPORATION Brine 282 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-131492499 2013-6-7 0:00:0 DD No Violations 2.00
-2091846734 2013-8-8 0:00:0 PW No Violations 1.50
-675887372 2013-9-16 0:00: PW No Violations 1.00
0131492499 2013-06-07 Drill / Deepen / Reopen No Violations The liner is in place and is collecting flow from the pad. It is being contained on site and at this time. Nick Berelsman is monitoring the containment and calling water trucks as needed. Sidewinder Drilling is almost done with the well.
0170452901 2013-12-30 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
0326275648 2013-08-22 Production Wells No Violations I arrived today to check on the containment pad being installed. The 60 mil liner is in place and covered by a 40 mil liner. The flat section appears to done and the block pads are in place over both liners. The berm is being installed on the left corner of the well pad on the same side as the production equipment.
0448190969 2013-10-22 Production Wells No Violations I am on site today to check on the operation status of this well and conduct a follow up inspection for the spills which occurred onn 6/03/2013 and 9/09/2013 I found that they are drilling out plug # 14 of 17. There is a new containment system on site and it appears to working as planned. The spills have been removed and the violations have been corrected.
0573529299 2013-02-22 Drill / Deepen / Reopen No Violations I am on site today to witness the running and cementing of the 26 inch diameter casing string. Express Drilling has drilled a 110 ft 32 inch diameter hole. Stingray Cement Service is cementing with 280 sks of Class A cement. Cement did come up to the Tin Horn but fell back down and will need to be topped off.
0675887372 2013-09-16 Production Wells No Violations The containment which was redone needs to be done over yet again. It was found to have leaks after the rebuild and Gulfport is making the containment area larger and testing for leaks after the repairs.
1245906698 2013-08-20 Production Wells No Violations The containment is in place around the well pad. They are beginning to set down containment so that they can begin fracking on 2 of the 3 wells on this pad. I was advised that more containment would be in place Wednesday and that I should follow it to make sure it is what the State wants.
1299179188 2013-09-18 Production Wells No Violations I am on site today to check on the containment repairs which are being done for the 3 rd time. The containment was found to have pin hole leaks and will be completely redone. The drive over sections will be added to keep the berm from blowing out.
1301930513 2013-06-26 Drill / Deepen / Reopen No Violations I am on site today to run the E.M 31 conductivity meter with Tom Tomastic across the location. When I arrived I found that the containment dike which was put in place to catch chloride contaminated fluid was full. I contacted Vince Cox for Gulfport and advised him that the system is full of fluid and needs to be pumped off. He arrived and said that the trucks would be on site in the next hour. We conducted a grid pattern and completed the running of the E.M. machine. Tom is to forward the results to Deputy Chief Bob Worstall and Chief Simmers.
1362403225 2013-03-04 Drill / Deepen / Reopen No Violations I am on site today to witness the running and the cementing of the 18-5/8 inch diameter casing string. Yost Drilling Rig # 7 set 354 ft of casing and Stingray Cementing Service c/w 570 sks of Class A cement at 15.6 lb . The TD of the 24 inch diameter well bore was 365 ft. During the installation of the casing they hit an obstruction and then decided to shorten the casing to the 354 ft. Had 40 bbls of good cement returns to surface.
1370182244 2013-05-31 Drill / Deepen / Reopen No Violations I had a call from Anthony Miller of Gulfport Energy. Antony was advising me of a on going contamination problem occurring on the B.K.Stephens pad. He informed me that he had this same contamination occurring on as many as 4 drilling pads of Gulfport Energy. I was later contacted by Deputy Chief Bob Worstall and advised to conduct an inspection of this pad and to work with Kyle Baldwin collecting samples and photographs. Kyle is a sampling expert for the State of Ohio Oil and Gas Division. We collected water samples and photographs of the possible contamination along with quantab titration samples for chlorides at 40.18508 -081.16769 and at 40.18521 -081,16823 . The field results from the quantab showed that the chloride range for the fluid sampled were in excess of 6,000 PPM. Kyle Baldwin collected the samples and transported them to our Cambridge Lab for testing. The source of this contamination had not been determined and no corrective action has been requested until the results from the samples are completed.
1370451591 2013-06-03 Drill / Deepen / Reopen Violations Noted Met with Deputy Chief Bob Worstall and Supervisor Tom Hill on site. I am meeting today to show Bob the amount of contamination coming from under the containment liner. It is running down along the rock pad and over the hill. There was not to be any action taken to remediate this site until after our inspection. We found that the contaminated soil below the pad has been replaced with clean fill, seeded and mulched. There is to be a ditch cut along the bottom of the rock pad to allow fluid running from under the containment liner to run into this sump area. The sump shall be lined so that the liner catches fluid running from under the pad, but does not run under the liner. All fluid collected in the sump shall be disposed of at a proper U.I.C. facility or until the chloride range is below 250 P.P. M. The amount of fluid captured in the sump shall be recorded . After the well is drilled the Sidewinder rig shall move off and no further work conducted on site until the clean up has been completed. The water wells up to 1500 ft away shall be sampled again before June 7th.
1371130087 2013-06-06 Drill / Deepen / Reopen No Violations The containment dike and sump for the site remediation are 90 % complete. Sidewinder Drilling # 121 is still on location and the drilling equipment on site will limit our clean up efforts. At this point we are going to make containment of the contamination and wait until the rig is done drilling. No further action is to occur on this site until the remediation of this site is complete.
1378738133 2013-09-09 Production Wells Violations Noted I received a call from Hal Miller of Gulfport to inform me of a spill on the B.K.Stephens pad. Hal said that it was acid which was spilled in the 20% range. I ask about the containment and he said that it may have found a way off. Weavertown Environmental is responding to contain the acid. I found that two tanks which had 5000 gallons of Hydrochloric acid were on site. The wrong type of valve was installed on both tanks and they failed within minutes of each other. Part of the acid was displaced down hole during the frac and approximately 1000 gals may have leaked onto the secondary containment liner. I contacted Deputy Chief Bob Worstall and advised him of the spill. I also advised him that I had discovered another chloride leak of the main containment. An area 60x30 wide has chlorides in the 1200 PPM range. Bob advised me to contact Kyle Baldwin and have him collect samples and bring more quantabs and acid stip. I collected photos and tested the fluid inside the liner and found it high in chlorides. Next I advised Hal Miller to contact a vac truck to suck up all of the fluid out of containment so that it would not continue leaking onto the drilling pad. I spoke with Judson Shreves and Ross Kirtley to review the repairs needed and the fact that this same type of leak has happened on three drilling pads.
1379003673 2013-09-12 Production Wells No Violations I am on site today to review the clean up of the chloride spill which occurred 09/09/2013. The chlorides have been sucked up from the rock pad and also the containment liner. Part of the liner has been pulled up and the portion where the acid tanks leaked in the far right corner to the right side of the production tanks. The whole right side of the berm needs to be repaired before any further operation continues on site.
1388423312 2013-12-30 Production Wells No Violations I am on site today to check on the status of the clean up of the spill which occurred over the weekend while I was off. Doug Bennett covered the spill and I am conducting a follow up inspection to see if everything has been removed and restored. I found that the material which was removed is in a roll off container still on site. The rock and soil has been removed and clean soil and rock have been put back in place. Violation has been corrected. Met with the pumper while I was on site and went over the clean up and some production numbers.
170452901 2013-12-30 0:00 PL No Violations 0.50
2091846734 2013-08-08 Production Wells No Violations I am on site today to see how the remediation of the site is progressing. I found that there is a containment system set up around the perimeter. Today there is a crane on site that is setting the tree on each well. Nothing further is being done on site today and there are no rigs or equipment other than the crane.
2125011869 2017-10-23 Preliminary Restoration No Violations On the day of my inspection I found this pad containing 3 correctly identified wellheads. Wells are being produced on formation pressure. Production equipment includes eight 400 barrel steel tanks, one 50 barrel steel tank, three gas production units, three vertical seperators, 1 compressor, and one combustor. All tanks are contained inside containment. Intermediate casing has 0 psi on it. Site passes preliminary restoration per ORC 1509.072A.
326275648 2013-8-22 0:00: PW No Violations 1.50
448190969 2013-10-22 0:00 PW No Violations 2.00
573529299 2013-2-22 0:00: DD No Violations 3.00
92232918 2019-12-10 0:00 PW No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1370451591 US-OH-110937 2014-04-23 Drilling operation causing pollution and contamination
1370451591 US-OH-110938 2014-04-23 Failure to comply with permit conditions
1370451591 US-OH-110939 2014-04-23 Dike or pit not able to prevent escape of Brine or other wastes
1378738133 US-OH-111237 2014-04-23 Well operation causing pollution and contamination
1378738133 US-OH-111238 2014-04-23 Dike or pit not able to prevent escape of brine or other wastes

For data sources see[10]

References