X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21014

Well Details

Well ID: 34-067-21014
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Stock Township
Operator Name: ECLIPSE RESOURCES-OHIO LLC
Well Pad ID:
Farm/Lease Name: MIZER DAVID
License Status: Final Restoration
License Date: 2014-04-15
Spud Date: 2008-07-14
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2008-07-18
Well Total Depth: 4410.00 ft
Configuration: Vertical
Latitude: 40.320000
Longitude: -81.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-01-05 Proposed Formations:BEREA THRU ORISKANY, Issued Date:1/5/2007, Expired Date:1/5/2008 6:00:00 AM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:ENPW
APP 2008-05-23 Proposed Formations:BEREA THRU ORISKANY, Issued Date:5/23/2008, Expired Date:5/23/2009 6:00:00 AM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:ENPW
Reached Total Depth 2008-07-18
Completion Report Received 2008-12-09
Change of Owner 2014-02-06 Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC
APP 2014-04-15 Proposed Formations:OHIO SHALE, Issued Date:4/15/2014, Expired Date:4/14/2016 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-06-17
Construction Permit Expires 2016-04-14
Record Last Modified 2018-08-28

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-02-17 1608 1678 11
2009-02-17 1430 1450 16
1430 1450 16
1608 1678 11
1732 1840 15
1874 1950 11
1430 1450 16
2009-02-17 1874 1950 11
2009-02-17 1732 1840 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 6320 Bbl 80000 FRACED SANDSTONE INTERVALS IN THE OHIO SHALE: GANTZ, THIRTY-FOOT, & GORDON
H2O 0 6393 Bbl 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 OXFORD OIL 0.00 0.00 365
2008 OXFORD OIL 9.00 0.00 0
2009 OXFORD OIL 663.00 0.00 0
2010 OXFORD OIL 480.00 31.00 365
2011 OXFORD OIL 401.00 49.00 0
2012 OXFORD OIL 330.00 0.00 0
2013 ECLIPSE RESOURCES-OHIO LLC 345.00 40.00 365
2014 ECLIPSE RESOURCES-OHIO LLC 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 OXFORD OIL Brine 0 365
2008 OXFORD OIL Brine 525
2009 OXFORD OIL Brine 1150
2010 OXFORD OIL Brine 265 365
2011 OXFORD OIL Brine 90
2012 OXFORD OIL Brine 190
2013 ECLIPSE RESOURCES-OHIO LLC Brine 45 365
2014 ECLIPSE RESOURCES-OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1141723666 2008-7-14 0:00: DD No Violations 1.50
-1202568418 2014-6-16 0:00: PB No Violations 5.00
-1445586363 2008-8-5 0:00:0 CT No Violations 1.00
-1485653139 2018-7-9 0:00:0 FR No Violations 1.00
-1811621579 2013-9-19 0:00: PL No Violations 1.00
-2021960540 2017-8-31 0:00: PW No Violations 1.00
0004374599 2014-06-17 Plug / Plug Back No Violations Nabors is on site to check the top of the cement plug and then shoot 4-1/2 inch casing. Tag top of the cement at 866ft and shot off 4-1/2 casing at 839ft then use casing to set plugs on the way out of hole. Set 200 ft plug from 839 ft to 639 ft and then 200 ft to 0 ft each plug used 40 sacks of class A cement at 15.6 lbs and a yield of 1.18 Circulated cement to surface.
0511020068 2008-07-21 Drill / Deepen / Reopen No Violations Inspection revealed that G & L Drilling has finished the well and are shut down . They are going to move to the Nancy Beckart lease. No violations at this time.
1041241959 2014-06-16 Plug / Plug Back No Violations On the date of inspection I accompanied ODNR Inspector Mark Moreland to witness the first two plugs set into the well. The plugs would be allowed to set up overnight and be tagged the following day. Refer to Mark Morelands report for further details.
1141723666 2008-07-14 Drill / Deepen / Reopen No Violations
1202568418 2014-06-16 Plug / Plug Back No Violations I am on site today to plug this well with Francis Well Service from W/VA and Formation Cement Service. Nobors Well Service is on site to run a cement bond log and locate the top of the cement. They ran in the well and tagged the top of the cement from the plugs set 06/13/2014 at 1880 ft which meant that our plugs had dropped and would need to be reset. 1-1/2 inch tubing is at 1841 and set a 500 ft plug from 1841 to 1341 and pull up and set another 500 ft from 1341 to 841 ft then let cement set up until Tuesday..
1402670600 2014-06-12 Plug / Plug Back No Violations I am on site today to plug this well to surface. Francis Brothers Service Rig is over the well and has 1-1/2 inch tubing at 3685 ft. Formation Cementing Service set a plug from 3685 ft to 3185 ft cemented with 110 sacks of class A cement. Francis Brothers pulled 500 ft of tubing out and set the 2 nd plug at 3185 ft to 2685 ft cemented with 110 sacks of class A at 15.6 lb and a yield of 1.18. Next Francis Brothers reverse circulated the tubing volume out to make sure no cement was in the casing. Plugging will continue Fri. and Monday.
1445586363 2008-08-05 Completion Testing No Violations Inspection revealed that the drilling pit has not been closed. The liner is intact and the fluid level is acceptable. No violations at this time.
1485653139 2018-07-09 Final Restoration No Violations On the day of my inspection I found this well location as a vegetated area. Previous inspection reports indicate well was plugged. Eclipse has submitted a form 55. No signs of gas leakage. Vegetation is in good condition. No lease road remains. Site meets requirements of OAC 1509.072B for final restoration.
1524410217 2014-06-13 Plug / Plug Back No Violations Francis Brothers ran tools in the well and tagged the top of the cement plug set 6/12/12014. The top of the plug was at 2208 ft . They ran 1-1/2 inch tubing in the well to 2193 ft and set a 500 ft plug to 1693. Next pulled out 500 ft of tubing and set # 4 plug at 1693 to 1193 ft. Reverse circulated to make sure of the cement top. Set up shooters for Monday to run a free point log and then pull up and shoot 4-1/2 diameter casing in two. Plugging to continue Monday
1735157463 2008-07-15 Drill / Deepen / Reopen No Violations Inspection revealed that G & L Drilling is drilling the surface hole. They advised that they should be ready to set surface late tonight or early in the morning. No violations at this time.
1811621579 2013-09-19 Preliminary Restoration No Violations
2021960540 2017-08-31 Production Wells No Violations On the day of my inspection I was unable to locate a well at this location. Previous inspection reports indicate that this well has been plugged. A plugging permit was issued in April 2014. I am unable to locate any plugging report documentation.
4374599 2014-6-17 0:00: PB No Violations 5.00
511020068 2008-7-21 0:00: DD No Violations 1.50

For data sources see[9]

References