34-067-20355

Well Details

Well ID: 34-067-20355
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Green Township
Operator Name: EXCO - NORTH COAST ENERGY INC
Well Pad ID:
Farm/Lease Name: CHARLENE SCHANEY ETAL
License Status: Final Restoration
License Date: 2018-07-20
Spud Date: 1979-05-02
Spud Drilling Contractor:
Final Drill Date: 1979-07-30
Well Total Depth: 10288.00 ft
Configuration: Vertical
Latitude: 40.330000
Longitude: -80.950000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1979-04-30 2143 CARLESS RESOURCES INC GeoDate 4/30/79
Original Spud 1979-05-02 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Completed 1979-07-30 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Reached Total Depth 1979-07-30 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Plugging Plan Approved 1998-02-21 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Change of Owner 2000-11-08 Operator changed from 2143, CARLESS RESOURCES INC to 1388, NORTH COAST ENERGY INC
APP 2018-07-20 Proposed Formations:TREMPEALEAU, Issued Date:7/20/2018, Expired Date:7/19/2020 12:00:00 PM, Drilling unit acres:156.07, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2018-10-10 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Record Last Modified 2019-01-30 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

Construction Permit Expires 2020-07-19 WELL CARD DATA

PI 5/2/79 UPDATE LOCATION DOGRM SURVEYOR 08/01/2018 ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-11-04 9610 9628 0
10080 10090 14
10098 10112 0
10136 10144 0
10206 10210 0
9730 9734 0
9694 9700 0
9610 9628 0
8560 8610 0
111 0
1997-11-04 9694 9700 0
111 0
1997-11-04 111 0
1997-11-04 8560 8610 0
1997-11-04 9730 9734 0
1997-11-04 10136 10144 0
1997-11-04 10206 10210 0
1997-11-04 10080 10090 14
1997-11-04 10098 10112 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 0 0 No Success in Acidizing
ACID 0 0 0 WAS ATTEMPTED WITHOUT SUCCESS.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1998 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2014 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2015 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2016 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2017 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1998 EXCO - NORTH COAST ENERGY INC Brine 0 0
2014 EXCO - NORTH COAST ENERGY INC Brine 0 0
2015 EXCO - NORTH COAST ENERGY INC Brine 0 0
2016 EXCO - NORTH COAST ENERGY INC Brine 0 0
2017 EXCO - NORTH COAST ENERGY INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1242632747 2018-10-10 0:00 PB No Violations 2.00
-1326633870 2018-10-9 0:00: PB No Violations 6.00
-25323757 2018-10-2 0:00: PB No Violations 1.00
0025323757 2018-10-02 Plug / Plug Back No Violations On the day of my inspection I witnessed a rig onsite set up over the well. No rig hands onsite. Pat Shrieve had called and said that the rig hands walked off location and was unclear as of why. Well is supposed to be plugged but plugging has not started. Tubing is open to atmosphere. Earthen pit has been excavated and lined.
0671230742 2018-10-03 Plug / Plug Back No Violations On location with Inspector Pat Shrieve to witness the bottom plug. A 400 foot plug was pumped by Formation Cementing and the rig crew was unable to trip tubing because of rig issues and cemented it in place. See Pats report for further information.
1032203707 2018-10-03 Plug / Plug Back No Violations

-foot cement plug at 8450-8050 feet. They are running regular class A cement at 1.18 yield and 15.6 ppg. They are displacing with 32.6 barrels of 10 ppg of salt water. The rig started pulling 2 3/8-inch tubing and blew an air hose. They shut down for 45 minutes and started pulling about 4 joints at 32 feet per joint. The rig had blown air hoses again and this was over 1 hour. The cement started setting and hung the tubing in the well.

1242632747 2018-10-10 Plug / Plug Back No Violations On the day of my inspection I witnessed Formation Cementing pump a 400 foot plug using 215 sacks of class A cement. Weight of 14.8 and yield of 1.36. 4.5 inch diamter casing pulled up to 1780 feet. Cement displaced with 21 barrels of water. 100 feet of plug is in 11 inch diameter open hole and 300 foot of plug is in 11.75 inch diameter casing.
1254565034 2018-10-09 Plug / Plug Back No Violations The inspection is conducted under plugging operations. Dylan Pendleton had assisted me on the plug job. The Oriskany / Big lime plug was set from 4860-4560 feet. Formation Cementing services had set plug with 145 sacks of regular class A cement at 2 % gel. The displacement was 72 barrels of 10 lb./gallon of salt water. There was good circulation but the well kicked off and used well control methods to successfully place the plug.
1326633870 2018-10-09 Plug / Plug Back No Violations On the day of my inspection I was accompanied by Inspector Pat Shreve. Formation cementing pumped a plug and rig pulled 4.5 inch diameter casing. See inspector Shreves report for further information.
1348298993 2020-1-14 0:00: FR No Violations 1.00
1446448985 2018-06-18 Production Wells No Violations The inspection is conducted under hot and dry conditions. The temperature is 90 degrees Fahrenheit. I assisted Dylan Pendleton and found that the well is shut in and idle. The well has not produced and has no production lines and production equipment on location. The well is equipped with a large flange 10,000 psi casing head and a 5000-psi valve that is closed. The flanged tubing hanger is closed with 5000 psi valves. The landowner Nellie Schaney and family confronted Dylan and I while we were on location. They wanted to know who gave the authority for us to be on location. I stated that under 1509.03 (C) we have the authority to enter lands that are public or private. I stated I will give her contact information to company. 6-19-18 I gave Nellie Schaney phone number to Larry Murrey.
1499340834 2017-07-06 Production Wells No Violations On the day of my inspection I found this well equipped with 11.75 inch diameter casing, 8.625 inch diameter casing, and 4.5 inch diameter casing. Well has no identification. On 7/5, call was made to Brian Rushe (724-720-2590) at Exco who said that it is on their plugging list. RBDMS shows no production records.
1529333880 2018-06-18 Production Wells No Violations On the day of my inspection I was accompanied by Inspector Pat Shrieve. Purpose of this inspection was for Pat to view the well and try and see if there was any pressure on it. Tubing valve could not be opened and we were unable check pressure. Operator is planning on plugging this well next month. Well has a large wellhead. Casing and tubing valves are closed. No production equipment onsite. Landowner Mrs. Schaney may not want well plugged and was not amicable.
1572401865 2018-10-10 Plug / Plug Back No Violations The inspection is conducted under plugging operations. Unlimited service rig had casing pulled up to 1780 feet. Formation Cementing set bottom of casing plug from 1780---0 with 70 sacks of regular class A cement at 2 % gel. After pulling all the 4 1/2 inch casing out the well was topped off from 150-0. Cement did not drop back.
671230742 2018-10-3 0:00: PB No Violations 4.00

For data sources see[9]