X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24561

Well Details

Well ID: 34-059-24561
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001608
Farm/Lease Name: GILCHER S LND GR
License Status: Producing
License Date: 2019-02-22
Spud Date: 2019-04-24
Spud Drilling Contractor:
Final Drill Date: 2019-09-14
Well Total Depth: 19213.00 ft
Configuration: Horizontal
Latitude: 40.100000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-02-22 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/22/2019, Expired Date:2/21/2021 12:00:00 PM, Drilling unit acres:556.866, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-06-14
Construction Permit Expires 2021-02-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
19014 19057 0
7662 7914 0
7662 7914 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1207500388 2019-11-25 0:00 PL No Violations 0.20
-1721137593 2019-6-2 0:00:0 CS No Violations 2.00
-2053185510 2019-10-10 0:00 CT No Violations 0.30
-833252730 2019-9-26 0:00: DD No Violations 0.20
-910501114 2019-10-23 0:00 CT No Violations 0.20
0093455043 2019-05-02 Drill / Deepen / Reopen No Violations The purpose of my inspection was to check on the cement top on the backside of the conductor. During my inspection the backside of the conductor and the cement floor had cured cement present. The cellar appears to be liquid tight as per the Ohio Revised Code 1501:9-1-08 (F).
0558263500 2019-04-24 Casing String Witnessed No Violations Precision Rathole drilled a 30-inch diameter borehole to 100 feet in depth and installed 100 feet of 24-inch diameter conductor casing with welded joints. The conductor weighed 94.62 pounds per foot. A small seepage of water was encountered at 95-feet during the drilling process. During my inspection a pre-job safety meeting was held with all personnel on location and Petroset cementing rigged up on location and pumped 250 sacks of class A cement with 2 percent calcium chloride and displaced with 47 barrels of fresh water. Cement returns were established and were used to cement the cellar floor to create a liquid-tight cellar as per 1501:9-1-08 (F).
1744464643 2019-8-7 0:00:0 DD No Violations 0.30
1758606230 2020-2-26 0:00: PW No Violations 0.10
1788371591 2020-7-27 0:00: PW No Violations 1.00
340744976 2019-12-12 0:00 PW No Violations 0.30
399361421 2019-11-15 0:00 CT No Violations 0.30
558263500 2019-4-24 0:00: CS No Violations 2.00
576062752 2019-6-11 0:00: DD No Violations 0.20
665831792 2019-6-3 0:00:0 CS No Violations 4.00
93455043 2019-5-2 0:00:0 DD No Violations 0.30

For data sources see[4]

References