34-059-24546

Well Details

Well ID: 34-059-24546
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001005
Farm/Lease Name: WAGLER LND GR
License Status: Producing
License Date: 2019-01-22
Spud Date: 2019-02-14
Spud Drilling Contractor:
Final Drill Date: 2019-03-24
Well Total Depth: 17547.00 ft
Configuration: Horizontal
Latitude: 40.140000
Longitude: -81.290000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-01-22 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/22/2019, Expired Date:1/21/2021 12:00:00 PM, Drilling unit acres:846.36, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-03-15
Construction Permit Expires 2021-01-21

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/01/2019 04/18/2019 7579 13,307,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0930356 117478
Hydrochloric Acid 7647-01-0 15 0.186071 234955
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 87.9455 111,050,000.0
I-7L UPP Iron Control Ammonium glycolate 35249-89-9 20 0.0013456 1699.11
Ethylene glycol 107-21-1 20 0.0013456 1699.11
Hydroxyacetic acid 79-14-1 5 0.000336399 424.777
FR-2 UPP Friction reducer Alcohols, C12-15 branched and linear,

ethoxylated propoxylated

120313-48-6 5 0.00262976 3320.64
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0157785 19923.9
Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-,

branched

127087-87-0 3 0.00157785 1992.39
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 10.6884 13,496,400.0
K-Bac 1005 UPP Biocide Polyethylene glycol 7732-18-5 50 0.00456533 5764.73
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000525926 664.096
Water 7732-18-5 44.3 0.00404488 5107.55
Other Chemical(s) Listed Above See Trade Name(s) List Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-,

branched

127087-87-0 3 0.00157785 1992.39
Alcohols, C12-15 branched and linear,

ethoxylated propoxylated

120313-48-6 5 0.00262976 3320.64
Formaldehyde 50-00-0 1 0.00001008 12.728
Methanol 67-56-1 5 0.00005040 63.639
Polyethylene glycol 7732-18-5 50 0.00456533 5764.73
Water 7732-18-5 44.3 0.00404488 5107.55
Thiourea 62-56-6 1 0.00001008 12.728
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000503984 636.39
Ethylene glycol 107-21-1 20 0.0013456 1699.11
Hydroxyacetic acid 79-14-1 5 0.000336399 424.777
Unihib G UPP Acid inhibitor Methanol 67-56-1 5 0.00005040 63.639
Butyl diglycol 112-34-5 75 0.000755976 954.585
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000503984 636.39
Formaldehyde 50-00-0 1 0.00001008 12.728
Thiourea 62-56-6 1 0.00001008 12.728
Scale Hib PE-18 UPP Scale Inhibitor Proprietary Scale Inhibitor Proprietary 30 0.0065746 8301.87

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1370625373 2019-3-10 0:00: CS No Violations 3.00
-273923257 2019-3-12 0:00: DD No Violations 1.20
-740698923 2019-3-18 0:00: DD No Violations 2.00
-824619014 2019-2-15 0:00: CS No Violations 1.50
0140342296 2019-05-23 Preliminary Restoration No Violations The purpose of my inspection was a status check on preliminary a restoration. The pad was constructed with disturbed areas restored in the year 2014. In the year 2019 two additional wells were added to the pad. The cuttings from the two cellars and two conductor boreholes were stockpiled on the South side of the pad with vegetation established. The pad slopes appeared to be stable. The well was being prepared for flowback and the wellhead was being assembled. The production equipment was being hauled on to location and arranged on pad. Identification signs and drilling permits were posted at entry. The location meets the requirements for preliminary restoration as per the Ohio Revised Code 1509.072 (A).
0273923257 2019-03-12 Drill / Deepen / Reopen No Violations

-inch diameter intermediate borehole. Ascent personnel conducted a safety meeting and then conducted a walk around tour of the rig and pad. 9.625-inch diameter intermediate casing was evaluated on the pipe rack and two more trucks with loads of 9.625-inch casing were parked on the lease road.

0321004823 2019-04-29 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection a workover rig was rigging up on the 5H well to drill out frac plugs and to install production tubing. Sound walls were being removed from location.
0740698923 2019-03-18 Drill / Deepen / Reopen No Violations The purpose of my inspection was a status check on drilling operations. During my inspection Patterson 584 was drilling at 11,338-feet within the lateral section of the production borehole. The kick off point before the curved section was at 6864-feet and the landing point after the curved section was at 8185-feet. On 3/15/19 the 40 pounds per foot 9.625-inch diameter intermediate casing was run and cemented at 6750-feet in two stages to surface. The post cement job was reviewed with the Ascent company man, Michael Burton and 40 barrels of cement returns were established. The 5.5-inch diameter production casing was being hauled onto location and placed on the pipe racks.
0824619014 2019-02-15 Casing String Witnessed No Violations Precision Rathole drilled a 36-inch diameter borehole to 100 feet in depth and installed a 30-inch diameter conductor casing with welded joints. Water was encountered during the drilling process. The conductor weighed 118.65 pounds per foot. During my inspection a pre-job safety meeting was held with all personnel on location and Petroset cementing rigged up on location and pumped 315 sacks of class A cement with 2 percent calcium chloride and displaced with 70.5 barrels of fresh water. Cement returns were established and were used to cement the cellar floor to create a liquid tight cellar.
1370625373 2019-03-10 Casing String Witnessed No Violations The purpose of my inspection was to witness the cementing of the 13.375-inch diameter surface casing within the 17.5-inch diameter borehole. The casing was set at 1356 feet from the rig floor and 3.8 feet of stick up above the rig floor. During my inspection a safety meeting was held with all personnel on location. Following the safety meeting Schlumberger pumped 25 barrels of gel, 10 barrels of fresh water, 1372 sacks of class A cement, and 200 barrels for displacement. The cement was weighed in pressurized mud scales confirming the weight of 15.6 pounds per gallon. Estimated 65 barrels of cement returns established and weighed at 15.2 pounds per gallon
1381284364 2019-7-3 0:00:0 PW No Violations 0.30
140342296 2019-5-23 0:00: PL No Violations 0.60
1535057877 2020-6-24 0:00: PW No Violations 1.00
321004823 2019-4-29 0:00: CT No Violations 0.20

For data sources see[4]

References