Well Details

Well ID: 34-059-24528
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001558
Farm/Lease Name: BLACK RACER W LND GR
License Status: Producing
License Date: 2018-06-08
Spud Date: 2018-08-12
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-09-10
Well Total Depth: 20569.00 ft
Configuration: Horizontal
Latitude: 40.090000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-06-08 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:6/8/2018, Expired Date:6/7/2020 12:00:00 PM, Drilling unit acres:769.563, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-09-10
Correction to Well 2018-12-21 UPDATE TAKE/TARGET PER AS-DRILLED
Completion Report Received 2019-05-29
Record Last Modified 2019-06-05
Construction Permit Expires 2020-06-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-06-04 7865 7986 0
2019-06-04 20382 20432 0
20382 20432 0
7865 7986 0
7865 7986 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/03/2018 11/23/2018 7659 18,454,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.4093 153,913,000.0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Methanol 67-56-1 100 0.00638322 11241
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00275344 4849
Sodium chloride 7647-14-5 30 0.0165206 29091
Sodium nitrate 7631-99-4 60 0.0155945 27460
Hydrochloric acid 7647-01-0 7.5 0.0355528 62603
Ehoxylated alcohols Proprietary 5 0.00001731 31
Modified thiourea polymer Proprietary 30 0.000103869 183
Phosphate of a Diamine, Sodium Salt Proprietary 30 0.00603699 10631
Contains no hazardous substances

in concentrations above cut-off values according to the competent authority

CAS Not Assigned 0 0 0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0165206 29091
Crystalline silica, quartz 14808-60-7 100 12.0109 21,149,100.0
Propargyl alcohol 107-19-7 5 0.00001731 31
9-Octadecenamide 93-83-4 5 0.00275344 4849
Citric acid 77-92-9 60 0.00149597 2635
Ammonium chloride 12125-02-9 5 0.00275344 4849
SCALECHEK LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
FDP-S1296-17 Halliburton Additive Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
LD-2850 Multi-Chem Friction Reducer Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
MX 8-4543 Multi-Chem Biocide Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.487608 858596
MX 5-2402 Multi-Chem Biocide Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-11-22 H2O 15 194775 Gal 252730 Halliburton
2018-11-03 H2O 8 129102 Gal 805600 Halliburton

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC 186486 47966 75

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC Brine 11183 75

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1003114809 2018-10-24 0:00 CT No Violations 0.20
-1271599904 2018-9-7 0:00:0 CS No Violations 0.50
-1514433918 2018-10-4 0:00: DD No Violations 0.20
-171962837 2019-2-11 0:00: PW No Violations 0.50
0018587860 2018-12-31 Preliminary Restoration No Violations The purpose of my inspection was a status check on drill-out operations. During my inspection Fortis Derrick Rig was on location tripping the drill pipe out of hole. The rig had completed drilling out frac plugs and was preparing to run 2.875-inch diameter production tubing. I spoke with Ascent Company Man, John, and he stated that annular pressure was monitored throughout the job and is continuing to be monitored. Production equipment was being installed on the South side of the pad. Five 400-barrel tanks, one vapor recovery tower, and one combustor were partially assembled. The location meets requirements for preliminary restoration. All areas effected by pad construction have been restored. The lease road and pad consisted of a gravel surface and surrounding the location there was thick vegetation coverage.
0171962837 2019-02-11 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Gauges were present reading 420 pounds per square inch on the 13.375-inch diameter surface casing, 984 pounds per square inch on the 9.625-inch diameter intermediate casing, 2700 pounds per square inch on the 5.5-inch diameter production casing, and 2500 pounds per square inch on the 2.875-inch diameter production tubing. The production equipment consisted of two sand traps, two gas production units, one horizontal heater treater, three compressors, five 500-barrel tanks, one vapor recovery tower, and one combustor. The identification was located at the wellhead, tank battery, and pad entry.
0827963260 2018-07-27 Drill / Deepen / Reopen No Violations The purpose of my inspection was a status check on conductors. Precision Rat Hole spudded the 1H and the 3H on 7/26/18. During my inspection both conductor boreholes were at total depth of 100 feet. The borehole was 36 inches and the conductor casing was 30 inch outer diameter, 29.25 inch inner diameter, and weighed 118.65 pounds per foot. Cement job calculations were discussed with Ascent Company Man Doug Bennett and Petroset supervisor Brian Sparks. The cement job was scheduled to begin at 3:00 p.m. 7/27/18.
1003114809 2018-10-24 Completion Testing No Violations Status check inspection found the well drilling process complete and the well scheduled to have the 5.5 casing string pressure tested and the toe sleeve opened as soon as repairs are made to the # 3 well on the pad. 2 wells are currently present on the pad. Annular pressure monitoring is in place with gauges present at surface.
1271599904 2018-09-07 Casing String Witnessed No Violations Pioneer 77 reached a total measured depth of 20569 feet. During my inspection the rig was running the 5.5-inch diameter production casing. The casing that was evaluated on the pipe rack was new 5.5-inch diameter casing weighing 23 pounds per foot.
1514433918 2018-10-04 Drill / Deepen / Reopen No Violations Pioneer 77 has completed drilling operations and has been removed from location. The wells were equipped with a night cap awaiting completion. Contractors were on location today cleaning out tanks used for drilling and hauling the final loads of Pioneer 77 to the Miller Farms Pad Guernsey county.
1539694364 2018-10-15 Completion Testing No Violations During my inspection the well was equipped with a frac gate valve in the closed position. Annular pressure monitoring was present with a valve on the 13.375 inch diameter surface casing reading 0 pounds per square inch and a valve on the 9.625 inch diameter intermediate casing reading 0 pounds per square inch. The well is awaiting completion operations.
1616405287 2018-08-13 Casing String Witnessed No Violations The purpose of my inspection was to witness the cementing of the surface casing. During my inspection I witnessed C&J Services O-Tex Cementing rig up on location. A safety meeting was held with all personnel on location. Following the safety meeting O-Tex pumped 35 barrels of gel, 10 barrels of fresh water, 1315 sacks of class A cement, and 195 barrels for displacement. The cement was weighed in pressurized mud scales confirming the weight of 15.6 pounds per gallon.
1740739009 2019-04-25 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Gauges were present reading 440 pounds per square inch on the 13.375-inch diameter surface casing and 1066 pounds per square inch on the 9.625-inch diameter intermediate casing. The production equipment consisted of two sand traps, two gas production units, one horizontal heater treater, three compressors, five 500-barrel tanks, one vapor recovery tower, and one combustor. The identification was located at the wellhead, tank battery, and pad entry.
1847984387 2020-7-27 0:00: PW No Violations 1.00
18587860 2018-12-31 0:00 PL No Violations 1.00
1894279114 2019-11-15 0:00 PW No Violations 0.50
599788553 2020-2-26 0:00: PW No Violations 0.10
827963260 2018-7-27 0:00: DD No Violations 1.00

For data sources see[10]