If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24453 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-81.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001198 | |
Farm/Lease Name: EGGLESTON WLS GR | |
License Status: Producing | |
License Date: 2015-01-05 | |
Spud Date: 2015-02-13 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-05-18 | |
Well Total Depth: 15627.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -81.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-22 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/22/2014, Expired Date:12/21/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-01-05 | Proposed Formations:POINT PLEASANT, Issued Date:1/5/2015, Expired Date:1/4/2017 12:00:00 PM, Drilling unit acres:526.577, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-02-27 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-05-08 | CHANGE IN UNIT SIZE FROM NEW PLAT. |
Reached Total Depth | 2015-05-18 | |
Change of Owner | 2015-08-19 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC |
Completion Report Received | 2016-03-10 | |
Construction Permit Expires | 2017-01-04 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/04/2015 | 09/19/2015 | 7403 | 21,477,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scaletrol 720 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.015057 | 29051.6 |
NE-530 | Baker Hughes | Non-emulsifier | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0260812 | 50322 | |
GBW-5 | Baker Hughes | Breaker | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.00005700 | 110 | |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0127343 | 24570 | |
Sand, White, 30/50 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 5.3427 | 10,308,400.0 | |
Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 1.03268 | 1,992,500.0 | |
MaxPerm-20A, 265 gallon tote | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0378271 | 72984.9 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Water | 7732-18-5 | 92.5 | 0.717125 | 1,384,260.0 | |
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.37259 | 12,300,900.0 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0007122 | 1374.78 | ||||
1-Methoxy-2-Propanol | 107-98-2 | 1 | 0.0002607 | 503.22 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0012729 | 2457 | ||||
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized | 72480-70-7 | 30 | 0.0004547 | 877.68 | ||||
Potassium Acetate | 127-08-2 | 0.5 | 0.00000760 | 14.628 | ||||
Polyaklylene | 7756-94-7 | 1 | 0.00001520 | 29.256 | ||||
Polyamine Polyethers | 68815-65-1 | 13 | 0.0033891 | 6541.85 | ||||
Ethanol | 64-17-5 | 5 | 0.0019399 | 3744.6 | ||||
Polyethylene Oxide | 25322-68-3 | 1 | 0.0002607 | 503.22 | ||||
Sorbitan, mono-(9Z)-9-octadecenoate | 1338-43-8 | 5 | 0.0018905 | 3649.24 | ||||
Citric Acid | 77-92-9 | 60 | 0.0031153 | 6013.42 | ||||
Potassium Iodide | 7681-11-0 | 2 | 0.00003030 | 58.512 | ||||
Aldehyde | 104-55-2 | 30 | 0.0004547 | 877.68 | ||||
Isopropanol | 67-63-0 | 5 | 0.0003365 | 649.5 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0038186 | 7371 | ||||
Ethoxylated Alcohol | 68131-39-5 | 5 | 0.0013035 | 2516.1 | ||||
Oxyalkylated alcohol | 78330-21-9 | 5 | 0.0018905 | 3649.24 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0030101 | 5810.31 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.002041 | 3939.76 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0007525 | 1452.58 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0113431 | 21895.5 | ||||
Polyoxyethylene sorbitan monooleate | 9005-65-6 | 5 | 0.0018905 | 3649.24 | ||||
Sulfurized polyolefin | 68037-13-8 | 5 | 0.00007580 | 146.28 | ||||
Formic Acid | 64-18-6 | 30 | 0.0004547 | 877.68 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.0001505 | 290.516 | ||||
Modified Polymeric Alkoxylate | 52501-07-2 | 5 | 0.0013035 | 2516.1 | ||||
1-Propanesulfonic acid, 2-methyl-2-[(1-oxo-2-propen-1-yl)amino]-,
polymer with 2-propenamide, sodium salt |
83446-68-8 | 60 | 0.0226862 | 43790.9 | ||||
Polyethylene Glycol Trimethyl Nonyl Ether | 84133-50-6 | 5 | 0.0013035 | 2516.1 | ||||
Propylene Glycol | 57-55-6 | 40 | 0.0104279 | 20128.8 | ||||
Ammonium Persulphate | 7727-54-0 | 100 | 0.00005700 | 110 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0533765 | 103032 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0067727 | 13073.2 | ||||
Oxyalkylated Fatty Acid | 61791-002 | 40 | 0.0006063 | 1170.24 | ||||
CI-39 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0015163 | 2925.6 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 92.7729 | 179,078,000.0 | |
HCl, 5.1 - 7.5% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.712 | 1,373,760.0 | |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0051944 | 10022.4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-09-04 | H2O | 0 | 0 | 0 | STAGE 1/51 | |
2015-09-19 | H2O | 0 | 0 | 0 | STAGE 51/51 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ASCENT RESOURCES UTICA LLC | 26850 | 8820 | 14 |
2016 | ASCENT RESOURCES UTICA LLC | 578954 | 169387 | 365 |
2017 | ASCENT RESOURCES UTICA LLC | 316960 | 63491 | 365 |
2018 | ASCENT RESOURCES UTICA LLC | 212473 | 38559 | 344 |
2019 | ASCENT RESOURCES UTICA LLC | 43222 | 8030 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ASCENT RESOURCES UTICA LLC | Brine | 1977 | 14 |
2016 | ASCENT RESOURCES UTICA LLC | Brine | 12321 | 365 |
2017 | ASCENT RESOURCES UTICA LLC | Brine | 5960 | 365 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 3544 | 344 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 582 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1015443876 | 2018-3-26 0:00: | PW | No Violations | 2.00 |
-1198465771 | 2015-10-5 0:00: | CT | No Violations | 1.00 |
-1502170430 | 2018-3-26 0:00: | PW | No Violations | 2.00 |
-1562882233 | 2020-6-15 0:00: | PW | No Violations | 1.00 |
-1908622406 | 2017-6-29 0:00: | PW | No Violations | 0.50 |
-28153550 | 2020-8-24 0:00: | PW | No Violations | 1.00 |
-33739330 | 2016-11-9 0:00: | PW | No Violations | 0.80 |
-374338625 | 2015-5-5 0:00:0 | DD | No Violations | 2.00 |
-584903748 | 2015-5-20 0:00: | PL | No Violations | 0.50 |
-617551283 | 2019-7-22 0:00: | PW | No Violations | 0.50 |
-770569616 | 2015-2-17 0:00: | DD | No Violations | 1.00 |
-975257753 | 2015-5-7 0:00:0 | DD | No Violations | 10.00 |
0033739330 | 2016-11-09 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a production tree and the valves were in the open position. The production equipment included a sand trap, a GP Unit, a line heater, a vapor recovery system, 1- NGL tank, a compressor unit, a heater treater, a stabilizer unit, a vertical vent scrubber, a combustor unit and a total of 6-500 barrel tanks all within containment and shared with the 2H. Gauges present read 750 pounds per square inch on the tubing and 950 pounds per square inch on the casing with annular pressure monitoring in place. |
0103483003 | 2015-11-25 | Completion Testing | No Violations | On the day of my inspection I witnessed that the well is online and equipped with a NEECO production tree with valves in the closed position and the flowline installed. Production equipment included a sand trap, a GP Unit, a line heater, a vapor recovery system, 1- NGL tank, a compressor unit, a heater treater, a stabilizer unit, a vertical vent scrubber, a combustor unit and a total of 6-500bbl tanks all within containment and shared with the 2H. Pipeline installation is in progress outside the wellsite boundaries. |
0374338625 | 2015-05-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac Drilling Rig #80 was 75% rigged up with plans to re-spud well on Wednesday drilling their 17.5 inch diameter surface hole to approximately 1200 feet prior to running and cementing 13.375 inch casing. Completed walk around with AEU Consultant Burl Miller revealing Mid East Trucking was completing rigging up and primary rig containment in place. |
0428599450 | 2016-06-08 | Production Wells | No Violations | On the day of my inspection I witnessed that the well is online and equipped with a NEECO production tree with valves in the closed position and the flowline installed. Production equipment included a sand trap, a GP Unit, a line heater, a vapor recovery system, 1- NGL tank, a compressor unit, a heater treater, a stabilizer unit, a vertical vent scrubber, a combustor unit and a total of 6-500bbl tanks all within containment and shared with the 2H. Gauges present read 1300psi on the tubing and 1850psi on the casing with annular pressure monitoring in place. |
0584903748 | 2015-05-20 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0678601430 | 2015-05-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed O-Tex Pumping LLC had just completed the second stage of the intermediate cement job and was rigging down circulating 30bbls of cement to surface on that stage. Nomac Drilling Rig #80 had drilled a 12.25 inch diameter hole to the depth of 6645 feet and 9.625 inch 40#/ft. P-110HC casing was ran to 6635 feet. |
0770569616 | 2015-02-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Precision Rathole had drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch conductor pipe with Universal Services cementing the conductor on Saturday. Precision had drill a 20 inch diameter mouse hole to the depth of 70 feet and ran 100 feet of 16 inch pipe with cementing of mouse hole later today. |
0975257753 | 2015-05-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #80 had drilled a 17.5 inch diameter hole to the depth of 1217 feet and Wyoming Casing Crew was onsite and ran 1220 feet of 13.375 inch 54.5#/ft. J-55 Surface Casing 3 feet above KB washing down the last joint of casing. O-Tex Pumping LLC was on site and gained circulation and pumped 50bbls of gel, 10bbls of fresh water and cemented casing with 1220 sacks of class H cement 15.6ppg, 1.2cuft/sk. with 2%CaCl, 0.2% X- |
1015443876 | 2018-03-26 | Production Wells | No Violations | On the day of inspection I accompanied ODNR Inspector Doug Bennett. See his report for details. |
103483003 | 2015-11-25 0:00 | CT | No Violations | 0.80 |
1166108047 | 2015-08-13 | Completion Testing | No Violations | On the day of my inspection I witnessed Producers Service Corp. was on site and treated the well with 1000 gallons of 15% HCL with 3 gallons of biocide and 3 gallons of corrosion inhibitor. Predator Pressure Control was on site and performed a pressure test on the lubricator at 5000psi, 10,000psi and 13,500psi with the test passing. Nine Wireline Division tripped in the well with PSC pumping behind beginning at the kick off point of 6800 feet 3bbls/min, 30 degrees in the curve at 7151 feet 6bbls/min, 60 degrees in the curve at 7530 feet 9bbls/min and 90 degrees in the curve at 8480 feet 15bbls/min. PSC maximum flow was 16bbls/min at 8501psi and a total of 379bbls pumped. NWD successfully set a plug at 15448 feet and pulled up and PPC performed a 30 minute pressure test at 13,000psi. NWD perforated 5.5 inch casing with 30 total shots from 15,432 feet to 15,312 feet. |
1198465771 | 2015-10-05 | Completion Testing | No Violations | On the day of my inspection I witnessed the drill out was completed on Sunday and 2.875 inch 6.5#/ft. J-55 tubing was set at 7430 feet. Completed walk around with Consultant Dave Norris revealing location clean-up was nearly completed and no violations. |
1223727561 | 2015-05-11 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Nomac Drilling Rig #80 was drilling a 12.25 inch diameter intermediate borehole at a depth of 6270 feet with a planned td of 6500 feet with 9.625 inch casing and a 2-stage cement job to follow. |
1426197534 | 2018-10-17 | Production Wells | No Violations | During my inspection the well was equipped with a production tree wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of two sand traps, two gas production units, one line heater, one heater treater, one vapor recovery tower, and six 500 barrel tanks. |
1431971159 | 2015-05-18 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Nomac Drilling Rig #80 had completed the cementing of the 5.5 inch production casing and was in the process of cleaning their pits with skidding of the rig to commence this evening to the 34059244540000 Eggleston 2H. |
1502170430 | 2018-03-26 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Jeff Adams following up on a phone call received 3/24/18 at 14:24 from Ascent Government Relations Manager Amanda Finn. Ms. Finn stated at 23:25 while the lease operator was unloading the well to the gas buster tank the operator saw the level rising in the tank and as he went over to shut-in the sand trap the tank ignited. Both wells were immediately secured by hitting the emergency shut down (ESD) button stopping the source of the fire. Supervision was contacted immediately along with 911 for the fire department. The fire was extinguished by the local fire department with foam and the pad was secured. Upon arrival at 10:45 on 3/26/18, I witnessed both wells were shut-in and secure. We met with Ascent Production Superintendent Adam Pence and reviewed the incident and remedial action to take place. The damage onsite was contained to the northwest corner of the pad with no product being released off pad and minimal undetermined amount onsite. The equipment damaged included the gas buster which prior to the fire was in containment, an empty methanol tank, various wiring and a computer monitor. No impact to the pad or off pad was found. Sun Pro Services had been dispatched to the location and as a precaution sprayed Micro Blaze agent around the impacted area Mr. Pence stated that once he is able to connect to the system they may be able to determine a root cause. Mr. Pence also stated that the configuration will change with the gas buster being relocated to the southeast corner. |
1908622406 | 2017-06-29 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a production tree and the valves were in the open position. The production equipment included a sand trap, a GP Unit, a line heater, a vapor recovery system, 1- NGL tank, a compressor unit, a heater treater, a stabilizer unit, a vertical vent scrubber, a combustor unit and a total of 6-500 barrel tanks all within containment and shared with the 2H. Gauges present read 200 pounds per square inch on the tubing and 500 pounds per square inch on the casing with annular pressure monitoring in place. |
345952683 | 2019-7-22 0:00: | PW | No Violations | 0.50 |
428599450 | 2016-6-8 0:00:0 | PW | No Violations | 0.50 |
678601430 | 2015-5-13 0:00: | DD | No Violations | 1.00 |
For data sources see[9]