X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24444

Well Details

Well ID: 34-059-24444
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001144
Farm/Lease Name: HOOP LND GR
License Status: Producing
License Date: 2017-12-27
Spud Date: 2014-11-14
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-02-16
Well Total Depth: 17973.00 ft
Configuration: Horizontal
Latitude: 40.160000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-10 Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-03 Proposed Formations:POINT PLEASANT, Issued Date:10/3/2016, Expired Date:10/3/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:TI
Change of Owner 2017-12-08 Operator changed from 8928, CARRIZO (UTICA) LLC to 9520, ASCENT RESOURCES UTICA LLC
APP 2017-12-27 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/27/2017, Expired Date:12/27/2019 12:00:00 PM, Drilling unit acres:898.204, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-02-16 PERMIT ISSUED FOR 6000' STRAT TEST IN PT.PLEASANT. ONLY DRILLED TO 1614' IN OHIO SHALE. TAI EXPIRED 10/3/2017
Correction to Well 2018-08-31 TAKE TARGET AS-DRILLED
Completion Report Received 2018-10-08 PERMIT ISSUED FOR 6000' STRAT TEST IN PT.PLEASANT. ONLY DRILLED TO 1614' IN OHIO SHALE. TAI EXPIRED 10/3/2017
Record Last Modified 2018-10-19 PERMIT ISSUED FOR 6000' STRAT TEST IN PT.PLEASANT. ONLY DRILLED TO 1614' IN OHIO SHALE. TAI EXPIRED 10/3/2017
Construction Permit Expires 2019-12-27 PERMIT ISSUED FOR 6000' STRAT TEST IN PT.PLEASANT. ONLY DRILLED TO 1614' IN OHIO SHALE. TAI EXPIRED 10/3/2017

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-18 7697 7848 0
2018-10-18 17689 17789 0
17689 17789 0
7697 7848 0
7697 7848 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/20/2018 05/20/2018 7594 15,746,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
Ethylene glycol 107-21-1 60 0.014401 21393
Acrylamide acrylate polymer Proprietary 30 0.0158169 23496
Propargyl alcohol 107-19-7 10 0.000101762 152
Modified thiourea polymer Proprietary 30 0.000305285 454
Sodium persulfate 7775-27-1 100 0.00001750 26
Hydrochloric acid 7647-01-0 7.5 0.02108 31311.6
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00103309 1535
Emulsifier 9002-92-0 10 0.000227614 339
Acrylic acid 79-10-7 0.01 0.00000240 4
Glutaraldehyde 111-30-8 30 0.00619854 9208
Ethoxylated alcohols Proprietary 30 0.000305285 454
Hydroteated light petroleum distillate 64742-47-8 30 0.0158169 23496
Sodium polyacrylate 9003-04-7 1 0.000240017 357
Crystalline silica, quartz 14808-60-7 100 11.3113 16,802,600.0
Inorganic salt Proprietary 30 0.0158169 23496
Olefins Proprietary 5 0.000122114 184
Citric acid 77-92-9 60 0.00425586 6322
Polymer Blend Not assigned 68 0.00154777 2300
Ethanol 64-17-5 1 0.000206618 307
Telmer Proprietary 10 0.00240017 3566
Fatty acids, tall oil Proprietary 30 0.000305285 454
Methanol 67-56-1 60 0.000639497 950
Phosphoric acid 7664-38-2 0.1 0.00002066 31
Sodium sulfate 7757-82-6 0.1 0.00000002 1
pH Buffer 8055-55-8 15 0.000341421 508
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.348487 517670
Gel 1100 Mountain Supply & Service Gelling Agent Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.2998 131,167,000.0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-19 H2O 15 214925 Gal 251410 Halliburton STAGE 67/67

STAGES 2-66 SEE IMAGES

2018-04-23 H2O 15 238508 Gal 249015 Halliburton STAGE 1/67

STAGES 2-66 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 345920 117457 164
2019 ASCENT RESOURCES UTICA LLC 174862 38400 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 12962 164
2019 ASCENT RESOURCES UTICA LLC Brine 5475 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1172967501 2019-2-27 0:00: PW No Violations 0.30
-703769520 2015-4-30 0:00: PL No Violations 0.50
0463016931 2018-07-17 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Multiple contractors were on location preparing the pad for flow back operations. The production equipment consisted of nine 400-barrel tanks, two vapor recovery towers, two compressors, six sand traps, six gas production units, one vertical vent scrubber, and one combustor.
0703769520 2015-04-30 Preliminary Restoration No Violations On the day of my inspection accompanied by ODNR Inspector Matt Fulk, the site passed preliminary restoration according to ORC 1509.072A.
1096796873 2019-05-01 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Production valves were in the open position. Production equipment consisted of nine 400-barrel tanks, two vapor recovery towers, two compressors, six sand traps, six gas production units, one vertical vent scrubber, and one combustor. Identification was located at the well, at the tank battery, and at the entry. Keystone Wireline Swabbing rig was parked on pad.
1172967501 2019-02-27 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Production valves were in the open position. Gauges present read 643 pounds per square inch on the 13.375-inch diameter intermediate casing and 680 pounds per square inch on the 9.625-inch diameter intermediate casing. No gauges were present on the 18.625-inch diameter surface casing. The cellar was full of water and no bubbling was present. Production equipment consisted of nine 400-barrel tanks, two vapor recovery towers, two compressors, six sand traps, six gas production units, one vertical vent scrubber, and one combustor. Identification was located at the well, at the tank battery, and at the entry.
1223523392 2018-02-21 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson UTI Drilling Rig #577 was drilling ahead in the curve with an 8.5 inch diameter bit at 6950 feet with a planned total depth of 18000 feet on 11.7 pound per gallon mud. I met with Ascent Consultant Burl Miller and completed walk around along with reviewing the 9.625 inch diameter casing cement job. During the first stage after switching from the rig pumps to Halliburton returns were lost and were not re-established until the second stage with full returns. Final lift pressure on the first stage was 350 pounds per square inch with full returns on the second stage. Upon reaching total depth and tripping out a Cement Bond Log will be ran and forwarded to ODNR for review.
1534939536 2014-12-06 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Highlands Drilling Rig #10 drilled a 23 inch diameter hole to the depth of 484 feet and ran 448 feet of 18.625 inch 87.5#/ft. J-55 casing. Baker Hughes was on site and broke circulation, pumped 35bbls of gel and 10bbls of fresh water. Baker Hughes cemented casing with 575 sacks of Class A lead cement with 0.05% Static Free, 1% CaCl, 0.5% EC-1, 0.125#/sk. Cello Flake, 0.75gals/sk. FP-6L, 0.5% BA-10A, weighing 15.6ppg with a yield of 1.20cuft/sk. Lead cement was followed 179 sacks of Class A tail cement with 0.05% Static Free, 3% CaCl, 0.5% EC-1, 0.125#/sk. Cello Flake, 0.75gals/sk. FP-6L, and 0.5% BA-10A, weighing 15.6ppg with a yield of 1.20cuft/sk. Cement weight was verified by mud scales. Cement was displaced with 123bbls of fresh water. Good cement returns of 73bbls, plug was landed at 302psi and pressured to psi for 5 minutes and the floats at 278psi and pressured to 1028psi for 5 minutes and the floats did not hold pressured up to 1063psi and shut in casing.
2041366324 2016-09-21 Drill / Deepen / Reopen No Violations
463016931 2018-7-17 0:00: PW No Violations 0.20
603136508 2020-7-15 0:00: PW No Violations 1.00

For data sources see[10]

References