If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24435 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.02,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001154 | |
Farm/Lease Name: SCOTT | |
License Status: Producing | |
License Date: 2014-10-30 | |
Spud Date: 2014-11-28 | |
Spud Drilling Contractor: PRECISION DRILLING | |
Final Drill Date: 2015-01-02 | |
Well Total Depth: 17150.00 ft | |
Configuration: Horizontal | |
Latitude: 40.020000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-30 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2014, Expired Date:10/29/2016 12:00:00 PM, Drilling unit acres:702.049, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-01-02 | |
Correction to Well | 2015-05-22 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2016-01-01 | change in acreage/target/takepoint per as-drilled plat-ALE |
Correction to Well | 2016-06-17 | Change in unit size. |
Construction Permit Expires | 2016-10-29 | |
Correction to Well | 2017-09-12 | UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED PLAT |
Completion Report Received | 2017-11-07 | |
Record Last Modified | 2018-02-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-11-27 | 7845 | 7971 | 36 |
2017-11-27 | 16806 | 16972 | 36 |
16806 | 16972 | 36 | |
7845 | 7971 | 36 | |
7845 | 7971 | 36 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/03/2017 | 06/15/2017 | 7384 | 17,215,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.152444 | 245461 | |
HP-9601 | One AquaSource | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2814 | One AquaSource | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND PREMIUM WHITE-30/50 | Halliburton | Proppant | Listed Below | |||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 88.7872 | 142,963,000.0 | |
HP-2220 | One AquaSource | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-CRC PREMIUM-20/40 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 0.295285 | 475460 | |
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00008418 | 136 | ||||
Acetic acid | 64-19-7 | 60 | 0.00100163 | 1613 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00166939 | 2689 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00008284 | 134 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.000112236 | 182 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000281 | 5 | ||||
Organic phosphate copolymer | 71050-62-9 | 25 | 0.0033893 | 5458 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 18 | 0.00782048 | 12593 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.6795 | 17,195,900.0 | ||||
Olefins | Proprietary | 5 | 0.00003313 | 56 | ||||
Phenol / formaldehyde resin | 9003-35-4 | 5 | 0.00887762 | 14295 | ||||
Ethanol | 64-17-5 | 60 | 0.000168355 | 272 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00002761 | 45 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02287 | 36820 | ||||
Ammonium Persfulfate | 7727-54-0 | 95 | 0.00186263 | 3000 | ||||
Hexamethylenetetramine | 100-97-0 | 2 | 0.00355105 | 5718 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00008284 | 134 | ||||
Ammonium chloride | 12125-02-9 | 1.5 | 0.000651707 | 1050 | ||||
Methanol | 67-56-1 | 60 | 0.000165672 | 267 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00001403 | 23 | ||||
Naphthalene | 91-20-3 | 5 | 0.00001403 | 23 | ||||
Tetrahydro-3, 5-dimethyl-2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24 | 0.00585281 | 9425 | ||||
Sodium hydroxide | 1310-73-2 | 24 | 0.00585281 | 9425 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00008284 | 134 | ||||
MB-7530 | One AquaSource | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-06-15 | H2O | 15 | 451339 Gal | 439156 | Halliburton | STAGE 57/57
STAGES 2-56 SEE IMAGES |
2017-06-03 | H2O | 15 | 281976 Gal | 308587 | Halliburton | STAGE 1/57
STAGES 2-56 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 386870 | 130658 | 154 |
2018 | ECLIPSE RESOURCES I LP | 631241 | 121010 | 312 |
2019 | ECLIPSE RESOURCES I LP | 137465 | 16693 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 69049 | 154 |
2018 | ECLIPSE RESOURCES I LP | Brine | 19440 | 312 |
2019 | ECLIPSE RESOURCES I LP | Brine | 2640 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1387021351 | 2018-7-10 0:00: | PW | No Violations | 0.20 |
-1722236198 | 2017-7-27 0:00: | CT | No Violations | 0.50 |
-1810348965 | 2016-12-23 0:00 | DD | No Violations | 0.50 |
-776848376 | 2014-12-23 0:00 | DD | No Violations | 3.00 |
0070724016 | 2015-02-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection following up on NOV-776848376, I witnessed that sump repairs are completed and sampling of pad has been done revealing no contamination. NOV-776848376 is resolved and the sump will be continually monitored for sheen and pumped as needed. I met with EHS representative Rocky King and Construction Foreman Doug Rennicker to discuss repairs to the slip on southeast corner which will begin tomorrow. |
0257612419 | 2017-08-02 | Completion Testing | No Violations | On the day of my inspection I witnessed the well was flowing back with through Energes flowback equipment to sales with 2412 pounds per square inches on the tubing and 3600 pounds per square inches on the casing at 1.6 MMCF per day and 22 barrels per hour of oil and 43 barrels per hour of water through a 20/64 inch choke. I met with Consultant Cristo Giannareas and completed walk around. |
0401900333 | 2015-01-13 | Administrative Inspection | No Violations | I received a phone call from Eclipse Construction Supervisor Doug Rennicker requesting an extension on NOV-776848376 due to the current weather conditions. Doug stated that clean up should be completed on time but with the weather he would like a 2 week extension. Extension was granted until 1/26/15. |
0776848376 | 2014-12-23 | Drill / Deepen / Reopen | Violations Noted | On the day of my inspection I received a phone call from Eclipse Representative Gretchen Addington about a spill on the Scott Pad. Upon EHS inspection of the pad today one of the manual operated sump control valves had malfunctioned releasing a barrel of water which had oil sheen on it. Upon arrival I witnessed that the valve had been shut and isolated. Inspection revealed that sheen was present and Quantab readings inside the LOD were at 6000ppm. Instructed operator to remove contamination and remediate affected area. |
0815300914 | 2017-06-27 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Services had completed drill out and were rigging down. 2.375 inch diameter L- |
1030822304 | 2014-12-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection following up on NOV-77684376, I witnessed that Precision Drilling Rig #110 had landed their curve and was drilling ahead on 10.8# mud at 9225 feet with a planned td of 16968 feet. Clean- |
1076593276 | 2016-12-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear and ODNR Inspector Austin Gutridge I witnessed the mouse hole was plugged in accordance with OAC 1501:9-11-11 with 2.25 yards of 9 sack grout. |
1164788057 | 2015-01-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection following up on NOV-776848376, I witnessed that clean-up was completed but found the sump which was in question was defective and phone call was made to Eclipse Representative Bruce Carpenter where I stated that the NOV would not be closed due to the sump and that I need a plan of action to address defective sump. |
1309337195 | 2015-04-23 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
1387021351 | 2018-07-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of one 400 barrel tank, two indirect line heaters, two sand traps, and two gas production units. Identification was located on the well. |
1419437246 | 2014-12-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that a lined ditch was installed at the LOD with a pump installed pumping water to a frac tank on location. Plans were to continue until chloride levels are acceptable. Quantab readings were taken in the ditch and in the sump located on the pad and the levels were 1800ppm and 4000ppm respectively. 7500 gallons of water was removed from the sump and will be disposed of properly. Site inspection revealed two areas of laying oil inside secondary containment around the rigs air compressors. Operator was instructed to continue clean-up of area affected by the faulty valve until complete and remove oil from secondary containment. |
1459073573 | 2016-07-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed the last activity the well was drilled to total depth on 12/30/14 and 5.5 inch production casing set at 17121 feet. Further inspection revealed the well has not been stimulated. A slip is present on the southeast cut slope of the well pad. |
1508330416 | 2017-10-18 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. The production equipment included a line heater, a sand trap and a GP unit. Also present a 400 barrel purge tank within containment and 3-500 barrel frac tanks within containment and these are shared with the 4059244370000 Scott 5H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF. Gauges present read 2385 pounds per square inch on the tubing and 2585 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification displayed. |
1585910583 | 2020-7-30 0:00: | PW | No Violations | |
1722236198 | 2017-07-27 | Completion Testing | No Violations | On the day of my inspection I witnessed flowback operations were shut down with Energes Flowback Services making repairs on equipment. |
1810348965 | 2016-12-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed a slip has developed on the east cut slope of the well pad. I placed call to Eclipse Construction Supervisor Doug Rennicker and discussed my findings. |
1928698721 | 2014-12-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Precision Drilling Rig #110 drilled a 17.5 inch diameter hole to the depth of 1123 feet and Franks Casing crew ran 1101 feet of 13.375 inch 61#/ft. J- |
257612419 | 2017-8-2 0:00:0 | CT | No Violations | 0.70 |
401900333 | 2015-1-13 0:00: | AM | No Violations | 0.20 |
70724016 | 2015-2-10 0:00: | DD | No Violations | 4.00 |
815300914 | 2017-6-27 0:00: | CT | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0776848376 | US-OH-128816 | 2015-02-18 | Drilling operation causing pollution and contamination |
For data sources see[10]