Well Details

Well ID: 34-059-24432
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001149
Farm/Lease Name: DONNA E LND GR
License Status: Producing
License Date: 2015-09-17
Spud Date: 2014-12-30
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-09-24
Well Total Depth: 16285.00 ft
Configuration: Horizontal
Latitude: 40.120000
Longitude: -81.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-10-16 Proposed Formations:TRENTON, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-01-12 Proposed Formations:POINT PLEASANT, Issued Date:1/12/2015, Expired Date:1/11/2017 12:00:00 PM, Drilling unit acres:353.757, Proposed Well Type:OG, Proposed Well Class:POOL
Change of Owner 2015-09-01 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
APP 2015-09-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/17/2015, Expired Date:9/16/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-09-24
Completion Report Received 2017-02-13
Construction Permit Expires 2017-09-16
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-10-17 8096 8231 0
2017-10-17 15956 16056 0
15956 16056 0
8096 8231 0
8096 8231 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/04/2016 10/17/2016 7925 10,837,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G UWS Acid inhibitor Thiourea 0000062-56-6 1 0.00000425 4.424
Methanol 0000067-56-1 5 0.00002127 22.118
Formaldehyde 0000050-00-0 1 0.00000425 4.424
Butyl diglycol 0000112-34-5 75 0.000319123 331.776
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000212749 221.184
Unigel 5F UWS Viscosifier Guar Gum 9000-30-0 100 0.000192373 200
AP Breaker UWS Gel breaker Ammonium peroxydisulfate 7727-54-0 100 0.00001058 11
Sulfuric acid 7664-93-9 0.5 0.00000005 0.055
WGA-7 UWS Viscosifier Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00014233 147.974
Guar Gum 9000-30-0 55 0.00014233 147.974
Other Chemical(s) Listed Above See Trade Name(s) List DETA phosphonate 15827-60-8 5 0.00120436 1252.11
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.000212749 221.184
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000580084 603.084
Sulfuric acid 7664-93-9 0.5 0.00000005 0.055
Distillates (petroleum), hydrotreated light 64742-47-8 55 0.00014233 147.974
Thiourea 0000062-56-6 1 0.00000425 4.424
Ethanol 64-17-5 0.3 0.00006961 72.37
Methanol 0000067-56-1 5 0.00002127 22.118
Ethylene glycol 107-21-1 20 0.00150691 1566.66
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00120436 1252.11
Ammonium acetate 631-61-8 13 0.00835869 8690.1
Hydroxyacetic acid 79-14-1 5 0.000376727 391.664
Alcohols, ethoxylated 68439-50-9 5 0.00321488 3342.35
Formaldehyde 0000050-00-0 1 0.00000425 4.424
Alcohols, ethoxylated 68551-12-2 5 0.00321488 3342.35
Water 7732-18-5 83 0.0192588 20022.4
Alcohols, ethoxylated 68002-97-1 5 0.00321488 3342.35
HCL Acid (7.5%) UWS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.106271 110485
I-7L UWS Iron control agent Ammonium acetate 35249-89-9 20 0.00150691 1566.66
Ethylene glycol 107-21-1 20 0.00150691 1566.66
Hydroxyacetic acid 79-14-1 5 0.000376727 391.664
Aqucar 714 UWS Biocide Ethanol 64-17-5 0.3 0.00006961 72.37
Water 7732-18-5 83 0.0192588 20022.4
Glutaraldehyde 111-30-8 14 0.00324847 3377.27
Quarternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 2.5 0.000580084 603.084
Water Ascent Resources Carrier/Base Fluid Water 7732-18-5 100 86.9876 90,436,600.0
Unislick ST50 UWS Friction reducer Alcohols, ethoxylated 68551-12-2 5 0.00321488 3342.35
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0192893 20054.1
Ammonium acetate 631-61-8 13 0.00835869 8690.1
Alcohols, ethoxylated 68002-97-1 5 0.00321488 3342.35
Alcohols, ethoxylated 68439-50-9 5 0.00321488 3342.35
Scale Inhibitor E UWS Scale Inhibitor DETA phosphonate 15827-60-8 5 0.00120436 1252.11
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00120436 1252.11
Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00481743 5008.44
HCL Acid (15%) UWS Acidizing Hydrochloric Acid 7647-01-0 15 0.00435134 4523.86
Sand UWS Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.4349 11,888,300.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-10-05 H2O 0 6051 Bbl 251838 Universal Well Services Inc. STAGE 1 OF 46
2016-10-17 H2O 8 5386 Bbl 252300 Universal Well Services Inc. STAGE 46 OF 46 SEE IMAGES FOR STAGES 2-45

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC 964696 117355 356
2018 ASCENT RESOURCES UTICA LLC 409685 23871 362
2019 ASCENT RESOURCES UTICA LLC 76568 4810 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ASCENT RESOURCES UTICA LLC Brine 17055 356
2018 ASCENT RESOURCES UTICA LLC Brine 4422 362
2019 ASCENT RESOURCES UTICA LLC Brine 327 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1202881066 2017-6-6 0:00:0 PW No Violations 0.50
-1619725415 2017-7-5 0:00:0 PW No Violations 0.50
-1641176996 2017-2-15 0:00: PW No Violations 0.50
-1795834734 2017-1-10 0:00: CT No Violations 0.50
-414060601 2017-3-23 0:00: PW No Violations 0.50
-829179876 2017-2-24 0:00: PW No Violations 1.00
-839823587 2019-11-20 0:00 PW No Violations 0.20
0366993858 2014-12-31 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Precision Rathole had drilled a 36 inch diameter hole to the depth of 100 feet and ran 100 feet of 30 inch 118.65#/ft. conductor pipe. Universal Well Service was on site gained circulation and cemented pipe with 255 sacks Type 1 cement with 3% CaCl and .25#/sk. of floseal and a yield of 1.2cuft/sk. Displaced cement to 90 feet with 74bbls of fresh water and had good cement returns of 16bbls to surface.
0414060601 2017-03-23 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1950 pounds per square inch on the tubing and 2200 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
0674849309 2019-02-14 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring was present. The 13.375-inch diameter surface casing had 500 pounds per square inch and the 9.625-inch diameter intermediate had 650 pounds per square inch. The production equipment consisted of five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, one combustor, and eight 500-barrel tanks. The identification was present at the wellhead.
0827660765 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2050 pounds per square inch on the tubing and 2450 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
0829179876 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Doug Bennett to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2450 pounds per square inch on the tubing and 2600 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a gas production unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
1049371219 2016-11-10 Completion Testing No Violations On the day of my inspection I witnessed frac operations were completed with Universal Well Services rigging down and moving off location. Deep Well Services will begin moving in week ending 11/19/16 for drill out operations.
1202881066 2017-06-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1050 pounds per square inch on the tubing and 1050 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
1205451597 2017-02-24 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Austin Gutridge to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2450 pounds per square inch on the tubing and 2600 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
1265925648 2015-05-06 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1368175995 2019-11-20 0:00 PW No Violations 0.20
1442437066 2015-09-16 Casing String Witnessed No Violations On the day of my inspection of cementing the intermediate string the casing was landed at 7017 ft. and the DV tool was set at 3803 ft. This will be a two stage cement job. O-Tex was on site and they had transmission issues with their pump truck developed transmission issues and help up the job for 3 hours. When the replacement truck arrived on site and got rigged up they did a 5 bbl. Line Fill and 2500 psi pressure test. Following the test they pumped 73 bbl. and 50 bbl. Barite. The plug was dropped. Then O-Tex circulated for 3.5 hours. During circulation there was a safety meeting I attended. Following the meeting I left the location.
1531562874 2018-05-29 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks, two vapor recovery towers, five gas production units, three horizontal heater treaters, one compressor, horizontal vent scrubber, and one combustor.
1619725415 2017-07-05 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 450 pounds per square inch on the tubing and 600 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H. I met with Well Technician Josh Franks and completed a walk around.
1641176996 2017-02-15 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2650 pounds per square inch on the tubing and 2625 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
1780329978 2017-04-06 Production Wells No Violations On the day of my inspection to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 1750 pounds per square inch on the tubing and 1850 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
1795834734 2017-01-10 Completion Testing No Violations On the day of my inspection I witnessed that flowback operations were down due to ice in lines. Upon thawing operations will continue through Falcon EFS equipment. The well was equipped with a production tree with valves in the open position. Gauges present read 3200 pounds per square inch on the tubing and 3400 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-400 barrel tanks within containment, 2-vapor recovery towers, 2-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H. I met and completed walk around with Ascent Consultant Jason Wiley revealing flowback equipment and flowback tanks were all in containment. Water will be directed to the flowback tanks with gas going to sales and oil sent to the stock tanks.
2015263073 2017-03-14 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Pat Shreve to record well pressures near the 34059231340000 Shepard 1, I witnessed the well was equipped with a production tree with valves in the open position. Gauges present read 2050 pounds per square inch on the tubing and 2450 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a GP Unit and a sand trap. Also present 8-500 barrel tanks within containment, 2-vapor recovery towers, 3-compressor units, a vertical vent scrubber, 3-horizontal heater treaters and a gas combustor all shared with the Donna 2H, Donna 4H, Donna 6H and Donna 10H.
2067557003 2015-09-10 Drill / Deepen / Reopen No Violations

-55 Surface Casing. O-Tex Pumping LLC was on site and gained circulation with 5bbls of fresh water, 30bbls of gel, 5bbls of fresh water and cemented casing with 1330 sacks of class H cement 15.6ppg, 1.2cuft/sk. with 2%CaCl, 0.2% X-

366993858 2014-12-31 0:00 DD No Violations 2.00
530011358 2020-7-13 0:00: PW No Violations 1.00
674849309 2019-2-14 0:00: PW No Violations 0.30
827660765 2017-3-14 0:00: PW No Violations 0.50

For data sources see[10]

References