34-059-24421

Well Details

Well ID: 34-059-24421
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Wayne Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000835
Farm/Lease Name: MOHOROVICH E RCH GR
License Status: Producing
License Date: 2018-05-25
Spud Date: 2014-09-03
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-01-25
Well Total Depth: 6759.00 ft
Configuration: Horizontal
Latitude: 39.950000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-25 Proposed Formations:POINT PLEASANT, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-12-24 Proposed Formations:POINT PLEASANT, Issued Date:12/24/2014, Expired Date:12/23/2016 12:00:00 PM, Drilling unit acres:641.3, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-01-25 PERMIT ISSUED TO DRILL TO 19144 IN PT. PLEASANT. WELL DRILLED TO 6759' IN QUEENSTON. LATERAL NOT DRILLED AND PERMIT EXPIRED 12/23/2016
Change of Owner 2017-12-14 Operator changed from 8928, CARRIZO (UTICA) LLC to 9520, ASCENT RESOURCES UTICA LLC
APP 2018-05-25 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/25/2018, Expired Date:5/24/2020 12:00:00 PM, Drilling unit acres:673.546, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-12-21 UPDATE TARGET/TAKE PER AS-DRILLED
Record Last Modified 2019-06-05 PERMIT ISSUED TO DRILL TO 19144 IN PT. PLEASANT. WELL DRILLED TO 6759' IN QUEENSTON. LATERAL NOT DRILLED AND PERMIT EXPIRED 12/23/2016
Construction Permit Expires 2020-05-24 PERMIT ISSUED TO DRILL TO 19144 IN PT. PLEASANT. WELL DRILLED TO 6759' IN QUEENSTON. LATERAL NOT DRILLED AND PERMIT EXPIRED 12/23/2016

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/20/2018 10/17/2018 7671 16,522,000.0 227644

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HVG-1 4.0 FTSI Water gelling agent Listed Below Green Line Listed Below 0 0 0
CS-1000 SI FTSI Scale Inhibitor Listed Below Green Line Listed Below 0 0 0
10.1%-15.0% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
CI-150 FTSI Acid Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
Bactron K-139 FTSI Biocide Listed Below Green Line Listed Below 0 0 0
40/70 White FTSI Proppant Listed Below Green Line Listed Below 0 0 0
APB-1 FTSI Gel breaker Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 100 88.1644 137,793,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 85 0.0584101 0
Water 7732-18-5 50 0.0298084 0
Water 7732-18-5 55 0.0133424 0
Water 7732-18-5 92.5 1.0097 0
Water 7732-18-5 45 0.00318851 0
Water 7732-18-5 100 0.0216247 0
FE-200A FTSI Iron Control Listed Below Green Line Listed Below 0 0 0
Quaternary ammonium compound 68424-85-1 10 0.00216247 0
Petroleum Distillate 64742-47-8 55 0.00003665 0
Alcohol Ethoxylate Surfactants Proprietary 10 0.000121312 0
Silica, Quartz 14808-60-7 100 0.275189 0
Silica, Quartz 14808-60-7 100 1.62927 0
Hydrogen Chloride 7647-01-0 7.5 0.0818672 0
Propargyl Alcohol 107-19-7 5 0.00006066 0
N-olefins Proprietary 3 0.00003639 0
Thiourea-formaldehyde Copolymer 68527-49-1 10 0.000121312 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.017885 0
Quartz 14808-60-7 4 0.00000267 0
Ethanol 64-17-5 5 0.00108124 0
Ammonium Persulfate 7727-54-0 100 0.00000599 0
Fatty Acids, Tall Oil 61790-12-3 10 0.000121312 0
Isotridecanol, ethoxylated 9043-30-5 2 0.00000133 0
Raffinates, Sorption Process 64741-85-1 55 0.00003665 0
Orthophosphoric acid 7664-38-2 0.75 0.000181941 0
Guar gum 9000-30-0 55 0.00003665 0
Methanol 67-56-1 90 0.00109181 0
Hydrochloric acid 7647-01-0 0.005 0.00000121 0
Phosphonic Acid, {(Dimethylamino) Methylene} Bis - 29712-30-9 5 0.00121294 0
Glutaraldehyde 111-30-8 5 0.00108124 0
Hydrogen Chloride 7647-01-0 15 0.0103077 0
Acetic acid 64-19-7 40 0.00283423 0
Cationic Polyacrylamide 9003-05-8 30 0.017885 0
Phosphonic Acid, {Nitrilotris (methylene)} Tris 6419-19-8 35 0.0084906 0
Silica, Quartz 14808-60-7 100 8.65694 0
Suspending Agent 1302-78-9 5 0.00000333 0
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00298084 0
Phosphorous Acid 10294-56-1 2 0.000485177 0
Citric Acid 77-92-9 30 0.00212567 0
100 Mesh Sand FTSI Proppant Listed Below Green Line Listed Below 0 0 0
0.1%-7.5% HCL FTSI Acid Listed Below Green Line Listed Below 0 0 0
FRW-1450 FTSI Friction Reducer Listed Below Green Line Listed Below 0 0 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 11035 3194 6
2019 ASCENT RESOURCES UTICA LLC 251407 65703 90

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 2138 6
2019 ASCENT RESOURCES UTICA LLC Brine 15262 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1109776241 2019-4-30 0:00: PW No Violations 0.20
-1176471736 2017-8-7 0:00:0 DD No Violations 0.50
-1413368136 2016-9-7 0:00:0 DD No Violations 0.50
-1476536626 2015-4-29 0:00: PL No Violations 0.50
-1528371911 2016-10-27 0:00 DD No Violations 1.00
-1586869378 2019-2-4 0:00:0 PW No Violations 0.20
-1842600639 2014-9-3 0:00:0 CS No Violations 2.00
-266853128 2018-7-6 0:00:0 DD No Violations 2.00
-93946036 2018-9-10 0:00: CT No Violations 0.20
0093946036 2018-09-10 Completion Testing No Violations The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection Frac Tech Services and Nine Energy Wireline was on location. The well was equipped with a frac valve with 0 stages commenced.
0266853128 2018-07-06 Drill / Deepen / Reopen No Violations Ascent Recourses was utilizing drilling rig Patterson 577. During my inspection Patterson 577 was tripping out of the 8.5 inch diameter borehole with the drill pipe after reaching a total measured depth of 19526 feet. The true vertical depth of the well was 7753 feet. The rig will begin running the 5.5 inch diameter production casing around 1:00 p.m. on 7/6/18. The 5.5 inch diameter production casing was evaluated on the pipe racks. The casing was 23 pounds per foot and the pipe condition was new. I obtained a cementing proposal from the Ascent company man. Ascent will utilize C&J Energy Services O-Tex Cementing to complete the cementing of the 5.5 inch diameter production casing.
0543134318 2018-11-09 Completion Testing No Violations Status check inspection found the well drilling and completion process is now complete. The well was stimulated in 76 stages of 151 total stage length average. The 5.5 diameter casing has a bottom toe sleeve that was set at 19,349. There is a 7.0625 primary master valve on the well. A service rig is on location and rigged up on the # 14 well drilling out the completion plugs and running the production tubing. Crews are on site installing the production equipment, 2 tank batteries are being constructed on site. Annular pressure monitoring is in place.
1109776241 2019-04-30 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead. Production tubing valves were in the open position. Pressure monitoring was present the 13.375-inch diameter intermediate casing had 400 pounds per square inch, 9.625-inch diameter intermediate had 500 pounds per square inch, 5.5-inch diameter production casing had 2020 pounds per square inch, and the production tubing had 1500 pounds per square inch. The production equipment consisted of ten 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, and one combustor. The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry.
1131279218 2019-12-13 0:00 PW No Violations 0.10
1176471736 2017-08-07 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed there was no change in the status of the well since the last inspection on October 27, 2016 with the 9.625 inch diameter intermediate secured with a bolted night cap. There is no production equipment, flowline or salesline in place and the location is shared with the Mohorovich 1S, 3S, 4S, Rector West 8H and
1278632548 2020-9-11 0:00: PW No Violations 1.00
1413368136 2016-09-07 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed no current activity and the drilling permit expired on 8/24/16. The last activity was on 12/7/14 with the 9.625 inch intermediate being set at 6620 feet. The cellar has been filled with pea gravel to the surface with a 6 inch polyvinyl chloride snorkel for water extraction.
1476536626 2015-04-29 Preliminary Restoration No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
1528371911 2016-10-27 Drill / Deepen / Reopen No Violations
1538659797 2018-10-03 Completion Testing No Violations During my inspection Frac Tech Services was on location and they have completed hydraulic stimulation operations on stage 35 of 76. Wireline was preparing to trip in hole to perforate stage 36.
1586869378 2019-02-04 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system. The plunger lift system was plumbed up, but the wells were flowing without the assistance of the plunger. Production tubing valves were in the open position. Gauges were present on all casing strings and they read as follows, 13.375-inch diameter surface casing had 366 pounds per square inch, 9.625-inch diameter intermediate had 725 pounds per square inch, 5.5-inch diameter production casing had 2900 pounds per square inch, and the production tubing had 2600 pounds per square inch. The production equipment consisted of ten 400-barrel tanks, two vapor recovery towers, six sand traps, six gas production units, three horizontal heater treaters, one compressor, and one combustor. The identification was posted at the well, tank battery, and entry. Laminated copies of the Drilling permits were posted at entry. Wise tanker truck, USA Compressions, and Ascent Company well tender were all on location. I called Jarod Cogar with Ascents production to make him aware of the pressures found on the 9.625-inch diameter by 5.5-inch diameter annulus on the 1H well and stated that our records indicate that 18.625-inch diameter surface casing was ran on these wells and there were not any gauges present at surface to monitor pressures. I asked that Ascent look into getting a gauge and pressure relief valve assembled on the 18.625-inch casing.
1842600639 2014-09-03 Casing String Witnessed No Violations On the date of inspection I was informed my the company man on duty that a 36 inch diameter hole was drilled by Lightning Energy Services to a depth of 58 feet and a 30 inch diameter hole was drilled from 58 feet to 65 feet. Lightning then set 24 inch casing with a weight of 94.62lbs/ft on bottom. Allied Oil and Gas Services pumped 270sk of Class A cement weighing 15.6ppg, with a yield of 1.18, 2% CaCl, and 0.25lbs/sk of flake. They displaced with 29bbl of fresh water. 10 bbl of cement returned to surface. Cement stayed at surface while I was on site.
1970134726 2014-10-10 Casing String Witnessed No Violations I was onsite to witness the surface casing being cemented. When I arrived onsite the rig was landing the last casing joint. Highlands Rig #10 has ran 520ft of 18-5/8, 87.5# casing in the well. Baker Hughes was onsite to do the cementing. After the pump truck pumped the gel spacer the truck locked up so they had to shut down and fix the truck. Once the truck was fixed we were able to finish the job. They used a total of 610sks. We had good returns to the surface.
39816829 2020-6-3 0:00:0 PW No Violations 1.00
543134318 2018-11-9 0:00: CT No Violations

For data sources see[8]