X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24417

Well Details

Well ID: 34-059-24417
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001114
Farm/Lease Name: FINERAN B
License Status: Producing
License Date: 2019-01-14
Spud Date: 2014-08-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2019-01-26
Well Total Depth: 24700.00 ft
Configuration: Horizontal
Latitude: 40.020000
Longitude: -81.340000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-25 Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-12-16 Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2018-10-30 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2019-01-14 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-26
Record Last Modified 2019-04-08
Construction Permit Expires 2021-01-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
24443 24541 0
7786 7908 0
7786 7908 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2084285340 2019-4-30 0:00: CT No Violations 0.20
-384400814 2019-2-12 0:00: CT No Violations 0.20
-77444923 2015-4-29 0:00: PL No Violations 0.50
-818102540 2019-1-22 0:00: DD No Violations 0.20
-953919454 2019-5-13 0:00: CT No Violations 0.30
-994463842 2019-5-28 0:00: CT No Violations 0.50
0077444923 2015-04-29 Preliminary Restoration No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A.
0384400814 2019-02-12 Completion Testing No Violations The well was awaiting hydraulic stimulation operations. Pro Frac Services were on location pumping the first stage on the 7 H 3405924418.
0524251870 2014-09-15 Casing String Witnessed No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 22inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site gained circulation with 165bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 290 sacks of BondCem cement with a weight of 15.8ppg verified by mud scales and a yield of 2.31cuft/sk. Cement was displaced with 120bbls of fresh water. Good circulation throughout job no cement was returned to surface only gel spacer. Alpha-Hunter Drilling Rig #9 ran 75 feet of 1 inch pipe and Halliburton topped off with 126 sacks of Class A 15.6ppg and a yield of 1.18. Good cement returns of 6bbls to surface.
0818102540 2019-01-22 Drill / Deepen / Reopen No Violations During my inspection today, I was accompanied by Pat Shreve. H&P Drilling Rig 531 was on location tripping the drill pipe out of the hole after reaching total depth. Eclipse Company Man on location was Wade Gray.
0953919454 2019-05-13 Completion Testing No Violations During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well.
0991545861 2014-09-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had completed cementing of their 13.325 inch intermediate casing and was rigging up their BOP with testing to follow.
0994463842 2019-05-28 Completion Testing No Violations The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location.
1161136766 2019-01-17 Drill / Deepen / Reopen No Violations The inspection revealed that the H&P 531 RIG is drilling at a depth of 13,646 feet in the lateral. The consultant Jack Turner stated that the total depth is 24,681 feet and will be reaching in 7 days.
1250197809 2019-12-11 0:00 PW No Violations 0.30
1548252902 2019-01-22 Drill / Deepen / Reopen No Violations
1589293241 2020-6-11 0:00: PW No Violations 1.00
2084285340 2019-04-30 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well had just recently had 111 stages of frac plugs drilled out and production tubing installed. A service rig was on location rigged up on the 7H well drilling out frac plugs.
524251870 2014-9-15 0:00: CS No Violations 10.00
991545861 2014-9-17 0:00: DD No Violations 1.50

For data sources see[4]

References