34-059-24409

Well Details

Well ID: 34-059-24409
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001087
Farm/Lease Name: ABE TROYER
License Status: Producing
License Date: 2014-08-08
Spud Date: 2014-09-26
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-11-28
Well Total Depth: 14344.00 ft
Configuration: Horizontal
Latitude: 40.080000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-08 Proposed Formations:POINT PLEASANT, Issued Date:8/8/2014, Expired Date:8/7/2016 12:00:00 PM, Drilling unit acres:698.607, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-11-28
Construction Permit Expires 2016-08-07
Completion Report Received 2017-05-23
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-05-30 7924 7993 36
2017-05-30 14033 14204 48
14033 14204 48
7924 7993 36
7924 7993 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/05/2016 10/15/2016 7898 14,729,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000139954 192
Ethylene oxide 75-21-8 0.01 0.00000073 1
Hydrochloric acid 7647-01-0 15 0.0384757 52784
Alcohols, C12-13, ethoxylated 66455-14-9 30 0.000161822 222
Acetic acid 64-19-7 60 0.00134924 1851
Acetic anhydride 108-24-7 100 0.00224728 3083
Fatty acids, tall oil Proprietary 30 0.000139954 192
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00002697 37
Propargyl alcohol 107-19-7 10 0.00004665 64
Olefins Proprietary 5 0.00005686 78
Methanol 67-56-1 60 0.000279179 383
Glycerine 56-81-5 5 0.00002697 37
Ethoxylated alcohols Proprietary 30 0.000139954 192
Crystalline silica, quartz 14808-60-7 100 10.3028 14,134,200.0
SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.257042 352630
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 89.4374 122,697,000.0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2 Halliburton Proppant Listed Below Listed Below 0 0 0
FDP-S1225-15 Halliburton Surfactant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-10-05 H2O 15 365172 Gal 363870 Halliburton STAGE 1/42

STAGES 2-41 SEE IMAGES

2016-10-15 H2O 15 923950 Gal 313580 Halliburton STAGE 42/42

STAGES 2-41 SEE IMAGES

2016-10-14 H2O 0 271352 Gal 249260 Halliburton 36 total perforations from 8893 feet to 8791 feet

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP 899103 119481 347
2018 ECLIPSE RESOURCES I LP 484346 25917 362
2019 ECLIPSE RESOURCES I LP 79305 3198 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP Brine 21774 347
2018 ECLIPSE RESOURCES I LP Brine 8229 362
2019 ECLIPSE RESOURCES I LP Brine 1246 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1191163300 2016-10-14 0:00 CT No Violations 3.00
-1367184962 2017-1-10 0:00: CT No Violations 0.50
-1566725484 2017-2-7 0:00:0 PW No Violations 0.20
-1863946706 2017-9-11 0:00: PW No Violations 0.50
-298964525 2016-10-11 0:00 CT No Violations 2.50
-496772645 2014-11-14 0:00 CS No Violations 14.00
-587144844 2019-4-25 0:00: PW No Violations 0.20
-722759218 2019-8-13 0:00: PW No Violations 0.50
-946201034 2018-10-4 0:00: PW No Violations 0.20
0282888398 2015-04-09 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
0298964525 2016-10-11 Completion Testing No Violations On the day of my inspection I witnessed Nine Wireline trip in the wellbore and perforate the casing with 32 shots from 11293 feet to 11191 feet in preparation for Halliburton to frac stage 20 of 46. Due to the lack of water Eclipse is stack fracing the pad at this time.
0481823764 2018-07-10 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one flare. Identification was located on the well.
0496772645 2014-11-14 Casing String Witnessed No Violations When I arrived onsite for the surface casing cement job the rig crew was still running the casing. Once the pipe was set Halliburton used 1325sks of HALCEM SYSTEM CEMENT. We had 30bbls of cement returns to the surface during the job.
0587144844 2019-04-25 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well. Upon entering the access road, a slip was noticed developing on the left side of the access road at the point of entry and an additional slip had developed on the stack pile. I made ODNR Engineer Mark Atkinson aware of my findings.
0946201034 2018-10-04 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of eight 400-barrel tanks, two vapor recovery towers, five sand traps, five gas production units, one compressor, one vent scrubber, and one combustor. Identification was located on the well.
1191163300 2016-10-14 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services frac stage 36 of 42 with a breakdown pressure of 7027 pounds per square inch, an average treating pressure of 8277 pounds per square inch, an average rate of 82.1 barrels per minute and a total of 249260 pounds of proppant pumped. I completed walk around with Consultant Dustin Moore revealing proper secondary containment was in place.
1356295963 2016-11-10 Completion Testing No Violations On the day of my inspection I witnessed the drill out operations were completed as Deep Well Services Rig #4 was rigging down preparing to move off location. I completed walk around with Consultant Cristo Giannareas revealing that secondary containment was being repaired and replaced by Grady Rentals along with cleaning of location. Halliburton Services are scheduled to move back in to complete the frac operations of the 8H and 10H next week.
1367184962 2017-01-10 Completion Testing No Violations The well was equipped with a plunger lift system with valves in the closed position with annular pressure monitoring in place. Tetra Technologies was onsite setting flowback equipment with flowback to begin on Friday. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H. I met with Consultant Cristo Giannareas and completed walk around revealing installation of production equipment was on going.
1406214526 2019-05-20 Production Wells No Violations The purpose of my inspection was a status check. On 4/25/2019 inspection found two slips have developed along the access road and on the topsoil stockpile. I contacted ODNR horizontal well pad Engineer Mark Atkinson and made him aware of the problem areas. During my inspection today the slips remain but have not increased in severability. The current slips will not effect pad stability and performance.
1566725484 2017-02-07 Production Wells No Violations The well was equipped with a plunger lift system with valves in the open position. Gauges present read 3100 pounds per square inch on the casing and 2940 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H.
1605700428 2017-06-06 Production Wells No Violations The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1825 pounds per square inch on the casing and 2090 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H.
1863946706 2017-09-11 Production Wells No Violations The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1320 pounds per square inch on the casing and 1015 pounds per square inch on the tubing. Annular pressure monitoring was present along with proper identification in place. Production equipment included a sand trap, a line heater and a GP Unit. Also present 8-400 barrel tanks within containment, a horizontal heated separator, 2- vapor recovery towers, 2-compressor units, a flare stack and a gas combustor all shared with the Abe Troyer 2H, 4H, 8H and 10H.
1951315183 2020-7-10 0:00: PW No Violations 1.00
282888398 2015-4-9 0:00:0 PL No Violations 0.50
481823764 2018-7-10 0:00: PW No Violations 0.20
552613668 2019-8-13 0:00: PW No Violations 0.20