If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24154 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.02,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Oxford Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: ANDY YODER | |
License Status: Producing | |
License Date: 2013-01-30 | |
Spud Date: 2013-09-04 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2013-09-10 | |
Well Total Depth: 3990.00 ft | |
Configuration: Vertical | |
Latitude: 40.020000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-03-15 | Proposed Formations:BEREA THRU OHIO SHALE, Issued Date:3/15/2010, Expired Date:3/15/2011 6:00:00 AM, Drilling unit acres:75.366, Proposed Well Type:OG, Proposed Well Class:ENPW |
APP | 2013-01-30 | Proposed Formations:BEREA THRU OHIO SHALE, Issued Date:1/30/2013, Expired Date:1/30/2015 12:00:00 PM, Drilling unit acres:75.366, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-09-10 | |
Change of Owner | 2014-02-06 | Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC |
Construction Permit Expires | 2015-01-30 | |
Completion Report Received | 2015-04-15 | |
Change of Owner | 2016-08-02 | Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ECLIPSE RESOURCES-OHIO LLC | 0.00 | 0.00 | 0 |
2014 | ECLIPSE RESOURCES-OHIO LLC | 18.00 | 0.00 | 0 |
2015 | ECLIPSE RESOURCES-OHIO LLC | 497.00 | 31.00 | 365 |
2016 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | 1072.00 | 0.00 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | 875.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ECLIPSE RESOURCES-OHIO LLC | Brine | 320 | 0 |
2014 | ECLIPSE RESOURCES-OHIO LLC | Brine | 680 | 0 |
2015 | ECLIPSE RESOURCES-OHIO LLC | Brine | 219 | 365 |
2016 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
2017 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1189032714 | 2015-6-18 0:00: | PW | No Violations | 0.50 |
-1655544115 | 2011-5-16 0:00: | ND | No Violations | |
-757420229 | 2020-3-18 0:00: | PW | No Violations | 1.00 |
1099146179 | 2015-01-05 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the production equipment included 2-100bbl tanks, a 30bbl brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a pumping unit powered by natural gas with valves in the open position at the wellhead. Well identification was present and the site passed preliminary restoration according ORC 1509.072A. |
1189032714 | 2015-06-18 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included 2-100bbl tanks, a 30bbl brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a pumping unit powered by natural gas with valves in the open position at the wellhead. The well was in production at the time of inspection with proper identification present and the production records were current. |
1378343706 | 2013-09-04 | Casing String Witnessed | No Violations | I am on site today and witnessed that G&L Drilling LLC. drilled a 15 hole to the depth of 120 and set 104 of new 9.625 27#/ft. casing. The pit was constructed and lined with plastic to the flow ditch. Formation Cementing Services was on site gained circulation and cemented casing with 100 sacks of Class A cement with 100lbs of gel, 100lbs of accelerator and 60lbs of LCM. Had good returns and cement stayed to surface. |
1378535068 | 2013-09-07 | Drill / Deepen / Reopen | No Violations | I am on site today and witnessed that G&L Drilling LLC. drilled an 8.75 diameter hole to the depth of 1470 and set 1435 of new 7 17#/ft. casing. The pit was constructed and lined with plastic to the flow ditch. Universal Well Services was on site gained circulation with 11 bbls of fresh water, pumped 25 bbls of gel, 5 bbls of fresh water spacer and cemented casing with 223 sacks of Class A cement with 2% Cacl. Displaced plug and pressured up to 560 psi shut in. Had good returns and cement stayed to surface. |
1378847629 | 2013-09-10 | Casing String Witnessed | No Violations | I am on site today and witnessed that G&L Drilling LLC. drilled a 6.25 diameter hole to the depth of 3990 and set 3951 of used tested 4.5 10.5#/ft. casing. The pit was constructed and lined with plastic to the flow ditch. Universal Well Services was on site gained circulation with 146bbls of fresh water, pumped 25bbls of gel, 5bbls of fresh water spacer and cemented casing with 238 sacks of Unipro 171. Displaced plug with 63bbls of fresh water and landed at 1020psi and pressured to 1680psi for 5 minutes. |
1655544115 | 2011-05-16 | Not Drilled | No Violations | Permit expired 3/15/2011. |
For data sources see[7]