34-059-24001

Well Details

Well ID: 34-059-24001
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Adams Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: BIG JON
License Status: Producing
License Date: 2006-02-02
Spud Date: 2006-02-10
Spud Drilling Contractor: FMS DRILLING
Final Drill Date: 2006-02-16
Well Total Depth: 5032.00 ft
Configuration: Vertical
Latitude: 40.030000
Longitude: -81.650000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-02-02 Proposed Formations:BEREA THRU CLINTON, Issued Date:2/2/2006, Expired Date:2/2/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-02-10 RBDMS Rec
Completed 2006-02-16 RBDMS Rec
Reached Total Depth 2006-02-16 RBDMS Rec
Construction Permit Expires 2007-02-02 RBDMS Rec
Completion Report Received 2007-03-02 RBDMS Rec
Change of Owner 2018-03-07 Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2018-03-08 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-06-21 4776 4862 101
4776 4862 101
4776 4862 101

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 95000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 NGO DEVELOPMENT CORP. 3718.00 0.00 161
2007 NGO DEVELOPMENT CORP. 9750.00 146.00 365
2008 NGO DEVELOPMENT CORP. 7060.00 52.00 365
2009 NGO DEVELOPMENT CORP. 6051.00 28.00 365
2010 NGO DEVELOPMENT CORP. 4850.00 0.00 365
2011 NGO DEVELOPMENT CORP. 4030.00 71.00 365
2012 NGO DEVELOPMENT CORP. 3586.00 44.00 366
2013 NGO DEVELOPMENT CORP. 3429.00 0.00 365
2014 NGO DEVELOPMENT CORP. 791.00 0.00 365
2015 NGO DEVELOPMENT CORP. 465.00 0.00 365
2016 NGO DEVELOPMENT CORP. 165.00 0.00 365
2017 NGO DEVELOPMENT CORP. 102.00 0.00 365
2018 M & R INVESTMENTS OHIO LLC 37.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 NGO DEVELOPMENT CORP. Brine 184 161
2007 NGO DEVELOPMENT CORP. Brine 232 365
2008 NGO DEVELOPMENT CORP. Brine 67 365
2009 NGO DEVELOPMENT CORP. Brine 149 365
2010 NGO DEVELOPMENT CORP. Brine 77 365
2011 NGO DEVELOPMENT CORP. Brine 90 365
2012 NGO DEVELOPMENT CORP. Brine 0 366
2013 NGO DEVELOPMENT CORP. Brine 0 365
2014 NGO DEVELOPMENT CORP. Brine 0 365
2015 NGO DEVELOPMENT CORP. Brine 0 365
2016 NGO DEVELOPMENT CORP. Brine 0 365
2017 NGO DEVELOPMENT CORP. Brine 0 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1024233522 2006-9-6 0:00:0 PW No Violations
-1327154885 2007-12-10 0:00 PW No Violations
-1327584099 2018-1-5 0:00:0 PW No Violations 1.00
-1523505310 2006-2-14 0:00: DD No Violations
-1653382915 2015-3-18 0:00: PW No Violations 2.00
-1845464946 2019-12-18 0:00 PW No Violations 0.60
-680197571 2008-10-22 0:00 PW No Violations
-88350556 2019-3-19 0:00: PW No Violations 0.60
0088350556 2019-03-19 Production Wells No Violations During my inspection there was 4 inches of fluid surrounding the 100-barrel tank. I ran a field test of the fluid with Quantab Titrators for chloride and the test revealed a 212 parts per million chlorides. The fluid in the dike was rain water. The well was equipped with 8.625-inch diameter casing with a casing head, 4.5-inch diameter production casing, 2.375-inch diameter tubing, rods, a pumping unit. Production valves were in the open position.
0391018026 2007-02-15 Preliminary Restoration No Violations PRELIMENARY RESTORATION
0680197571 2008-10-22 Production Wells No Violations WELL IS IN PRODUCTION. NO VIOLATIONS.
1024233522 2006-09-06 Production Wells No Violations PRODUCING WELL
1184111535 2007-07-10 Preliminary Restoration No Violations PRELIMENARY RESTORATION
1327154885 2007-12-10 Production Wells No Violations TANK ID REPLACED.
1327584099 2018-01-05 Production Wells No Violations On the day of my inspection with the ground snow covered, I witnessed that the production equipment included a disconnected 210 barrel tank, a 100 barrel tank, a horizontal separator, a 2 inch meter run with a .75 inch orifice and chart recorder all within an earthen dike. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, rods, an Alten pumping unit powered by natural gas and domestic gas service with valves in the closed position on the tubing and 1 of 2 valves in the open position on the casing supplying the domestic gas. Identification was present and production records were current.
1444643420 2018-03-15 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a disconnected 210 barrel tank, a 100 barrel tank, a horizontal separator, a 2 inch meter run with a .75 inch orifice and chart recorder all within an earthen dike. A 3 foot area of oil contamination was found inside the dike. I placed call to Allen Tarleton of Diversified stating my findings. Mr. Tarleton stated that the area would be remediated. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, rods, an Alten pumping unit powered by natural gas and domestic gas service with valves in the closed position on the tubing and 1 of 2 valves in the open position on the casing supplying the domestic gas. Identification was present and production records were current.
1523505310 2006-02-14 Drill / Deepen / Reopen No Violations FMS DRILLING AT 4438
1540556416 2018-10-25 Production Wells No Violations My inspection today finds that the old 210-barrel tank and the old 100-barrel tank have been replaced with a new 100-barrel tank and the oil contamination within the dike had been remediated. The well was equipped with a pumping unit with production valves in the open position.
1553021542 2019-12-18 0:00 PW No Violations 0.50
1653382915 2015-03-18 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a 210bbl tank, a 100bbl tank, a horizontal separator, a 2 inch sales meter with a .75 inch orifice and chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.375 inch tubing, rods, a pumping unit powered by natural gas and domestic gas service with valves in the open position. Identification was present and production records were current.
391018026 2007-2-15 0:00: PL No Violations

For data sources see[9]

References