If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-23488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.17,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Washington Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: BECKETT D | |
License Status: Producing | |
License Date: 2018-03-20 | |
Spud Date: 1983-05-11 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1983-05-14 | |
Well Total Depth: 5884.00 ft | |
Configuration: Vertical | |
Latitude: 40.170000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-04-28 | Issued Date 4/28/83 Expired Date 10/25/83 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05884 Proposed Drill Depth 05884 |
Original Spud | 1983-05-11 | PRODUCING FORMATION = MARCELLUS |
Completed | 1983-05-14 | PRODUCING FORMATION = MARCELLUS |
Reached Total Depth | 1983-05-14 | PRODUCING FORMATION = MARCELLUS |
CO | 1983-11-11 | 168 RED HILL DEVELOPMENT GeoDate 4/28/83 |
Completion Report Received | 1984-02-13 | PRODUCING FORMATION = MARCELLUS |
APP | 2018-03-20 | Proposed Formations:MARCELLUS, Issued Date:3/20/2018, Expired Date:3/19/2020 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ENPW |
Plugged Back | 2018-05-10 | PRODUCING FORMATION = MARCELLUS |
Record Last Modified | 2018-10-04 | PRODUCING FORMATION = MARCELLUS |
Construction Permit Expires | 2020-03-19 | PRODUCING FORMATION = MARCELLUS |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5656 | 5726 | 6 |
5656 | 5726 | 6 | |
5656 | 5726 | 6 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/30/2018 | 05/30/2018 | 3748 | 196264 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SCALE CLEAR 112 | Producers Service Corp | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00373699 | 66.76 |
BIO CLEAR 2000 | Producers Service Corp | Biocide | 2,2-dibromo-3-nitriloproplonamide | 10222-01-2 | 40 | 0.00760478 | 135.857 | |
Polyethylene Glycol | 25322-68-3 | 70 | 0.0133084 | 237.749 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Methanol | 67-56-1 | 30 | 0.0137334 | 245.343 | |
Cocamide Diethanolamine | 68603-42-9 | 5 | 0.00004531 | 0.809 | ||||
Ammonium chloride | 12125-02-9 | 7 | 0.0049926 | 89.191 | ||||
Diethanolamine | 111-42-2 | 1 | 0.00000906 | 0.162 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00009062 | 1.619 | ||||
2-Butoxyethanol | 111-76-2 | 40 | 0.0183113 | 327.124 | ||||
Petroleum Distillates | 64742-47-8 | 40 | 0.0285291 | 509.663 | ||||
Methanol | 67-56-1 | 10 | 0.00009062 | 1.619 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 7 | 0.0049926 | 89.191 | ||||
2,2-dibromo-3-nitriloproplonamide | 10222-01-2 | 40 | 0.00760478 | 135.857 | ||||
PRO FLO II | Producers Service Corp | Surfactant | 2-Butoxyethanol | 111-76-2 | 40 | 0.0183113 | 327.124 | |
Methanol | 67-56-1 | 30 | 0.0137334 | 245.343 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 70 | 0.0320447 | 572.467 | ||||
PRO SHALE SLIK-405 | Producers Service Corp | Friction Reducer | Ammonium chloride | 12125-02-9 | 7 | 0.0049926 | 89.191 | |
Petroleum Distillates | 64742-47-8 | 40 | 0.0285291 | 509.663 | ||||
Sodium Chloride | 7647-14-5 | 10 | 0.00713229 | 127.416 | ||||
Alcohols, C12-16, Ethoxylated | 68551-12-2 | 7 | 0.0049926 | 89.191 | ||||
PROHIB II | Producers Service Corp | Inhibitor | Cocamide Diethanolamine | 68603-42-9 | 5 | 0.00004531 | 0.809 | |
Methanol | 67-56-1 | 10 | 0.00009062 | 1.619 | ||||
Diethanolamine | 111-42-2 | 1 | 0.00000906 | 0.162 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00009062 | 1.619 | ||||
Acetic Acid | 64-19-7 | 90 | 0.000815599 | 14.57 | ||||
IC Acid (15%) | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.151348 | 2703.78 | |
Sand (Proppant) | Producers Service Corp | Proppant | Crystalline Silica (quartz) | 14808-60-7 | 100 | 7.165 | 128000 | |
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 91.6797 | 1,637,820.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-30 | ACID | 0 | 196264 Gal | 197397 | Producers Service Corporation | Stimulation completed within 10.5 pound per foot 4.5 inch diameter production casing. Operations were completed by Producers Service Company. Red Hill Engineer Mark Natoli was present for the entire duration. |
H2O | 0 | 71320 Gal | 0 | FRAC: WATER |
For data sources see[5]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1052646662 | 2007-7-31 0:00: | PW | No Violations | |
-1595097663 | 2018-10-11 0:00 | PL | No Violations | 0.50 |
-1723968773 | 2007-3-29 0:00: | PW | No Violations | |
-1821819221 | 2018-5-10 0:00: | PB | No Violations | 3.00 |
-1828811385 | 2006-1-13 0:00: | PW | No Violations | |
-223859771 | 2006-5-9 0:00:0 | PW | No Violations | |
-310957914 | 2004-1-29 0:00: | PW | No Violations | |
-635907543 | 2017-6-8 0:00:0 | PW | No Violations | 1.00 |
-853290979 | 2020-5-11 0:00: | PW | No Violations | |
0133677126 | 2004-01-15 | Production Wells | No Violations | STATUS CHECK |
0223859771 | 2006-05-09 | Production Wells | No Violations | PRODUCING WELL. ID RE-POSTED. |
0310957914 | 2004-01-29 | Production Wells | No Violations | STATUS CHECK |
0435056196 | 2018-05-14 | Plug / Plug Back | No Violations | Red Hill rigged up their jar and stem ripping tool and tripped within the 4.5 inch diameter casing. The tool was ran in hole to 4500 feet in depth. Telegraph was received at 4229 feet. The 4.5 inch diameter casing was ripped at 4229 feet in depth. The casing was removed from hole. |
0606366599 | 2005-09-20 | Production Wells | No Violations | STATUS CHECK |
0635907543 | 2017-06-08 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 140 barrel tank, a horizontal separator, a drip, a 2 inch sales meter with a .75 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch diameter casing; 4.5 inch diameter casing, 2.375 inch diameter tubing and a plunger lift system with valves open on the tubing and 1 of 2 valves open on the casing supplying the motor valve. Gauge present read 580 pounds per square inch on the casing. Identification was present and production records were current. |
0921010437 | 2003-04-16 | Production Wells | No Violations | STATUS CHECK |
1052646662 | 2007-07-31 | Production Wells | No Violations | STATUS CHECK |
1324211069 | 2007-07-31 | Production Wells | No Violations | STATUS CHECK |
133677126 | 2004-1-15 0:00: | PW | No Violations | |
1525798959 | 2018-05-08 | Plug / Plug Back | No Violations | Red Hill Development contacted me on 5/7/18 and stated that they will be preparing to move a rig on location to begin plug back operations. During my inspection the well was equipped with a plunger lift system with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, and 1.5 inch diameter tubing. The 8.626 inch diameter casing had a gauge present reading 375 pounds per square inch and the 4.5 inch diameter casing had a gauge present reading 110 pounds per square inch. A derrick service rig was parked on location but not rigged up. |
1527005219 | 2018-05-16 | Plug / Plug Back | No Violations | The purpose of my inspection was to witness the cementing of the 4.5 inch diameter production casing. The 4.5 inch casing was used weighing 10.5 pounds per foot. During my inspection I witnessed Red Hill run the 4.5 inch casing to 4050 feet within the 7.875 inch diameter borehole. Petroset cementing arrived on location and pumped 110 barrels of fresh water, 10 barrels of gel and 36 barrels of cement. The cement was 50/50 pozmix weighing 14.6 pounds per gallon with a cement yield of 1.29 cubic foot per sack. |
1534731641 | 2018-08-16 | Preliminary Restoration | No Violations | The purpose of my inspection was a follow up on a preliminary restoration. The well was plugged back from the Queenston to the Marcellus. During my inspection the well was equipped with 8.625-inch diameter surface casing with a casing head, 4.5-inch diameter production casing with a tubing head, and 1.5-inch diameter tubing. The production valves were in the open position. A chart recorder was attached to the well reading 15 pounds per square inch on the tubing and 150 pounds per square inch on the production casing. The production equipment within an earthen dike consisted of one 140-barrel tank and one horizontal separator. The frac tanks have been removed from location. The area will need regraded with vegetation established to reach preliminary restoration status. |
1595097663 | 2018-10-11 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a plunger lift system with valves in the open position. The well was recently plugged back and recompleted within the Marcellus Formation. The location had been restored with vegetation growth and a gravel lease road. The location meets requirements for preliminary restoration written within the Ohio Revised Code 1509.072 (A). A swabbing rig was on location. |
1723968773 | 2007-03-29 | Production Wells | No Violations | PRODUCING WELL |
1797175336 | 2018-05-18 | Plug / Plug Back | No Violations | During my inspection Red Hill was on location filling up 12 frac tanks and the service rig was being rigged down with plans of being off of location today. The well was plugged back to the Marcellus formation and hydraulic stimulation operations will take place on May 30th 2018. |
1797609453 | 2018-07-17 | Completion Testing | No Violations | The purpose of my inspection was a status check. The well had recently been plugged back to the Marcellus. During my inspection a service rig and power swivel was on location to complete drilling out the Frac plugs. |
1821819221 | 2018-05-10 | Plug / Plug Back | No Violations | The purpose of my inspection was to witness plug back operations. Red Hill ran 1.5 inch tubing to 5776 feet within the 4.5 inch casing. Petroset Cementing arrived on location and set a 30 sack class A cement plug within the 4.5 inch casing from 5776 feet to 5456 feet a crossed the perorations. The cement was squeezed through the perforations and displaced with 14.5 barrels of fresh water. |
1828811385 | 2006-01-13 | Production Wells | No Violations | STATUS CHECK |
1847182841 | 2015-09-23 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 140bbl tank, a horizontal separator, a drip, a 2 inch sales meter with a .75 inch orifice, a chart recorder and domestic gas service all within an earthen dike. The well was equipped with 8.625 inch casing; 4.5 inch casing, 2.375 inch tubing and a plunger lift system with valves open on the tubing and 1 of 2 valves open on the casing supplying the motor valve. Gauges present read 450psi on the casing and 345psi on the tubing. . Identification was present and production records were current. |
435056196 | 2018-5-14 0:00: | PB | No Violations | 4.00 |
606366599 | 2005-9-20 0:00: | PW | No Violations | |
921010437 | 2003-4-16 0:00: | PW | No Violations |
For data sources see[10]