34-059-21435

Well Details

Well ID: 34-059-21435
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Adams Township
Operator Name: PAVLIK CHARLES E
Well Pad ID:
Farm/Lease Name: MARSHALL ROY ETAL (HAGUE HAZEL)
License Status: Final Restoration
License Date: 2009-09-21
Spud Date: 2009-09-22
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2009-10-30
Well Total Depth: 4813.00 ft
Configuration: Vertical
Latitude: 40.060000
Longitude: -81.710000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1971-06-26
Completed 1971-07-02
CO 1981-01-26 579 CHRIS OIL CO GeoDate 1/26/81
Change of Owner 2009-09-10 Operator changed from 579, CHRIS OIL CO to 2244, PAVLIK CHARLES E
APP 2009-09-21 Proposed Formations:BEREA, Issued Date:9/21/2009, Expired Date:9/21/2010 6:00:00 AM, Drilling unit acres:36, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-10-30
Plugged/Abandoned 2009-11-12
Completion Report Received 2009-11-17
Construction Permit Expires 2010-09-21
Record Last Modified 2013-03-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-02-03 1202 1230 20
2006-09-11 4658 4696 0
4658 4696 0
1202 1230 20
1202 1230 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1200 Bbl 23000
ACID 28 100 Gal 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000DP2383 Final Restoration No Violations Final Restoration done information from Data Point
1253735506 2009-09-23 Drill / Deepen / Reopen No Violations inspection revealed that cable tool rig was rigged up over hole getting ready to reopen well to the Berea Sandstone,pit was lined and 8 valve installed on surface casing for safety purposes.
1297120004 2011-02-07 Final Restoration No Violations Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.
DP2383 FR No Violations

For data sources see[5]