X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-21217

Well Details

Well ID: 34-059-21217
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Adams Township
Operator Name: ENERGY RECOVERY CO
Well Pad ID:
Farm/Lease Name: WARNER FRED A & MADELINE
License Status: Not Drilled
License Date: 1981-09-15
Spud Date: 1970-05-11
Spud Drilling Contractor:
Final Drill Date: 1970-06-05
Well Total Depth: 4878.00 ft
Configuration: Vertical
Latitude: 40.060000
Longitude: -81.670000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1970-05-11 R.O. 09/17/1981
Completed 1970-06-05 R.O. 09/17/1981
Reached Total Depth 1970-06-05 R.O. 09/17/1981
Plugged/Abandoned 1973-09-13 R.O. 09/17/1981
CO 1981-09-15 218 ENERGY RECOVERY CO GeoDate 9/15/81
Oil and Gas 1981-09-15 Issued Date 9/16/81 Expired Date 3/15/82 Acres 0020000 Tool Type CRAF Proposed Formation ORISKANY Proposed Depth 00000 Proposed Drill Depth 00000
Construction Permit Expires 1982-03-15 R.O. 09/17/1981
Record Last Modified 2009-12-11 R.O. 09/17/1981

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4718 4776 0
4718 4776 0
4718 4776 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 700 Bbl 15750 42 BPM & 2850-2900PSIG

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-24181741 2018-4-4 0:00:0 DD No Violations 1.00
0024181741 2018-04-04 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed H&P Flex Rig #471 was drilling ahead on Del Scorcho #4H in their 12.25 inch diameter deep intermediate string, currently drilling on air and surfactant at a depth of 6,494 feet with a planned total depth of 8,700 feet. They were currently drilling in the Salina and had seen no signs of H2S. I spoke with Pat Smith, EQT Company Man and he estimated they would be cementing the intermediate string sometime Thursday evening or Friday morning they plan to displace cement with oil base mud. The rig will continue to drill the lateral section before skidding rig and moving to the next well. This is the 2nd well on the pad with 4 remaining wells to be drilled.

For data sources see[5]

References